{"version":"1.0","provider_name":"The Construction Specifier","provider_url":"https:\/\/www.constructionspecifier.com","title":"Architectural coating extends high school\u2019s concrete look - The Construction Specifier","type":"rich","width":600,"height":338,"html":"<blockquote class=\"wp-embedded-content\" data-secret=\"NJqeWRmlGR\"><a href=\"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/\">Architectural coating extends high school\u2019s concrete look<\/a><\/blockquote><iframe sandbox=\"allow-scripts\" security=\"restricted\" src=\"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/embed\/#?secret=NJqeWRmlGR\" width=\"600\" height=\"338\" title=\"&#8220;Architectural coating extends high school\u2019s concrete look&#8221; &#8212; The Construction Specifier\" data-secret=\"NJqeWRmlGR\" frameborder=\"0\" marginwidth=\"0\" marginheight=\"0\" scrolling=\"no\" class=\"wp-embedded-content\"><\/iframe><script>\n\/*! This file is auto-generated *\/\n!function(d,l){\"use strict\";l.querySelector&&d.addEventListener&&\"undefined\"!=typeof URL&&(d.wp=d.wp||{},d.wp.receiveEmbedMessage||(d.wp.receiveEmbedMessage=function(e){var t=e.data;if((t||t.secret||t.message||t.value)&&!\/[^a-zA-Z0-9]\/.test(t.secret)){for(var s,r,n,a=l.querySelectorAll('iframe[data-secret=\"'+t.secret+'\"]'),o=l.querySelectorAll('blockquote[data-secret=\"'+t.secret+'\"]'),c=new RegExp(\"^https?:$\",\"i\"),i=0;i<o.length;i++)o[i].style.display=\"none\";for(i=0;i<a.length;i++)s=a[i],e.source===s.contentWindow&&(s.removeAttribute(\"style\"),\"height\"===t.message?(1e3<(r=parseInt(t.value,10))?r=1e3:~~r<200&&(r=200),s.height=r):\"link\"===t.message&&(r=new URL(s.getAttribute(\"src\")),n=new URL(t.value),c.test(n.protocol))&&n.host===r.host&&l.activeElement===s&&(d.top.location.href=t.value))}},d.addEventListener(\"message\",d.wp.receiveEmbedMessage,!1),l.addEventListener(\"DOMContentLoaded\",function(){for(var e,t,s=l.querySelectorAll(\"iframe.wp-embedded-content\"),r=0;r<s.length;r++)(t=(e=s[r]).getAttribute(\"data-secret\"))||(t=Math.random().toString(36).substring(2,12),e.src+=\"#?secret=\"+t,e.setAttribute(\"data-secret\",t)),e.contentWindow.postMessage({message:\"ready\",secret:t},\"*\")},!1)))}(window,document);\n\/\/# sourceURL=https:\/\/www.constructionspecifier.com\/wp-includes\/js\/wp-embed.min.js\n<\/script>\n","thumbnail_url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Featured-5.jpg","thumbnail_width":600,"thumbnail_height":400,"description":"When Danvers High School in Massachusetts embarked on a $70.9-million renovation and expansion project, staying within the budget and on schedule were at the top of its priority list. The first floor of the three-story academic building was clad with insulated precast concrete panels to provide a new \u2018skin\u2019 for the structure. Expanding the precast to the upper two stories was too expensive, so the architects looked to metal paneling to provide the look and feel they desired."}