{"id":10070,"date":"2015-07-03T09:38:26","date_gmt":"2015-07-03T13:38:26","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=10070"},"modified":"2017-01-27T15:37:05","modified_gmt":"2017-01-27T20:37:05","slug":"idahos-tallest-building-replaces-the-boise-hole","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/","title":{"rendered":"Idaho&#8217;s tallest building replaces the Boise Hole"},"content":{"rendered":"<figure id=\"attachment_10102\" aria-describedby=\"caption-attachment-10102\" style=\"width: 192px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-10102\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1-667x1000.jpg\" alt=\"Located in downtown Boise, Eighth and Main\u2019s 18-story mixed-use building is the tallest building in Idaho and the first in the state to use unitized curtain wall. Photos \u00a9 Marc Walters Photography. Photos courtesy Wausau Window and Wall Systems\" width=\"192\" height=\"288\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1-667x1000.jpg 667w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1-200x300.jpg 200w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1-624x936.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1.jpg 683w\" sizes=\"auto, (max-width: 192px) 100vw, 192px\" \/><\/a><figcaption id=\"caption-attachment-10102\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Located in downtown Boise, Eighth and Main\u2019s 18-story mixed-use building is the tallest building in Idaho and the first in the state to use unitized curtain wall.<\/span> <em>Photos \u00a9 Marc Walters Photography. Photos courtesy Wausau Window and Wall Systems<\/em><\/figcaption><\/figure>\n<p><strong>by Bob Thiede<br \/>\n<\/strong>Rising above Boise\u2019s skyline to become the tallest in Idaho, the Eighth and Main building prominently features a unitized glazed curtain wall and sunshades.<\/p>\n<p>The $76-million, 18-story mixed-use building opened last February, and is pursuing Silver through the U.S. Green Building Council\u2019s (USGBC\u2019s) Leadership in Energy and Environmental Design (LEED) rating system.<\/p>\n<p>The project\u2019s architect of record, CTA Architects Engineers, not only designed the superstructure, but also occupies the eighth floor. Babcock Design Group offices, the firm serving as the design architect for the project and the building envelope, has its offices one floor above.<\/p>\n<p>Built on a vacant lot known as the \u2018Boise Hole,\u2019 the structure erased an infamous eyesore from the city\u2019s downtown. Constructing more than 36,232 m<sup>2<\/sup> (390,000 sf) of Class A office, retail, and restaurant space, it has brought new tenants and business to Boise\u2019s downtown.<\/p>\n<p>The building\u2019s owner, the Gardner Company (a full-service real estate company), prides itself on partnering with companies implementing the highest of standards. This includes designing and constructing to LEED criteria, and minimizing environmental impact. To realize this, CTA collaborated with Babcock Design Group and general contractor Engineered Structures Inc. (ESI) to create a cost-effective, durable, and energy-efficient building.<\/p>\n<p>This was the first unitized curtain wall project in Idaho. To better visualize the desired effect, the team coordinated a trip to the manufacturing center in Wisconsin and to a similar installation in New York.<\/p>\n<p>The unitized curtain wall was engineered, fabricated, and pre-assembled into units in a factory-controlled environment ensuring conditions are maintained to achieve the intended performance required for the project. The pre-assembled units make the system easy to install onsite.<\/p>\n<figure id=\"attachment_10103\" aria-describedby=\"caption-attachment-10103\" style=\"width: 273px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-10103\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image3-1000x667.jpg\" alt=\"Image3\" width=\"273\" height=\"182\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image3-1000x667.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image3-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image3-624x416.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image3.jpg 1024w\" sizes=\"auto, (max-width: 273px) 100vw, 273px\" \/><\/a><figcaption id=\"caption-attachment-10103\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">In addition to unitized curtain wall, Eighth and Main features storefront, sunshades, and entrances manufactured from recycled aluminum, as well as high-performance glass and durable finishes to support the project\u2019s energy-efficient and environmental goals.<\/span><\/figcaption><\/figure>\n<p>ESI broke ground on the project in July 2012; by mid-2013, the unitized curtain wall started arriving at Eighth and Main\u2019s jobsite pre-engineered and factory-glazed in sequenced phases. Shipped one lite wide by one floor tall, the interlocking units facilitated speedy installation by the glazing team. In total, 6689 m<sup>2<\/sup> (72,000 sf) of unitized curtainwall, custom canopies, and other finishing details were installed on the building.<\/p>\n<p>\u201cIn addition to its aesthetics and performance, we valued the ease of installation and the schedule enhancement the unitized curtain wall system provided the project,\u201d said ESI\u2019s project manager David Bowar.<\/p>\n<p>The southeast corner of the building features unitized curtain wall running the full height of the structure, accented by custom sunshades with integral light-emitting diodes (LEDs). The remainder of the tower features the same unitized system in continuous vertical strips installed between glass-fiber-reinforced concrete (GFRC) panels.<\/p>\n<p>Supporting the project\u2019s energy-efficient and environmental attributes, high-performance insulating, laminated glass was used throughout the curtain wall, storefront, and entrance systems. In addition to the curtain wall and sunshades, zero-sightline vents were provided, custom interior stools, and other aluminum-framed architectural building products.<\/p>\n<figure id=\"attachment_10104\" aria-describedby=\"caption-attachment-10104\" style=\"width: 275px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-10104\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image2-1000x714.jpg\" alt=\"Considered Boise\u2019s \u2018crown jewel,\u2019 Eighth and Main offers more than 36,232 m2 (390,000 sf) of office, retail, and restaurant space.\" width=\"275\" height=\"196\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image2-1000x714.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image2-300x214.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image2-624x445.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image2.jpg 1024w\" sizes=\"auto, (max-width: 275px) 100vw, 275px\" \/><\/a><figcaption id=\"caption-attachment-10104\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Considered Boise\u2019s \u2018crown jewel,\u2019 Eighth and Main offers more than 36,232 m<sup>2<\/sup> (390,000 sf) of office, retail, and restaurant space.<\/span><\/figcaption><\/figure>\n<p>The aluminum extrusions from secondary billet contain at least 70 percent recycled content, and the aluminum framing was painted in a 70 percent polyvinylidene fluoride (PVDF) finish. This high-performance architectural coating meets the most stringent, exterior, architectural specification\u2014American Architectural Manufacturers Association (AAMA) 2605, <em>Voluntary Specification, Performance Requirements, and Test Procedures for Superior-performing Organic Coatings on Aluminum Extrusions and Panels<\/em>. The liquid paint\u2019s volatile organic compounds (VOCs) were safely captured and destroyed before the finished material arrived at the job site.<\/p>\n<p><em>Bob Thiede serves as an architectural sales representative at Wausau Window and Wall Systems. For more than 30 years, he has helped building owners, architects, specifiers, and contractors with their commercial buildings\u2019 high-performance window systems. He can be contacted at <a href=\"mailto:bthiede@wausauwindow.com\">bthiede@wausauwindow.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rising above Boise\u2019s skyline to become the tallest in Idaho, the Eighth and Main building prominently features a unitized glazed curtain wall and sunshades. The $76-million, 18-story mixed-use building opened last February.<\/p>\n","protected":false},"author":6,"featured_media":10102,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,449,275,489,460],"tags":[614,621,3267,3268],"class_list":["post-10070","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-uniformat","category-08-40-00-entrances-storefronts-and-curtain-walls","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-curtain-wall","tag-glazing","tag-idaho","tag-mixed-use","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Idaho&#039;s tallest building replaces the Boise Hole - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Idaho&#039;s tallest building replaces the Boise Hole - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Rising above Boise\u2019s skyline to become the tallest in Idaho, the Eighth and Main building prominently features a unitized glazed curtain wall and sunshades. The $76-million, 18-story mixed-use building opened last February.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2015-07-03T13:38:26+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-27T20:37:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"683\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Erik Missio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erik Missio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/\"},\"author\":{\"name\":\"Erik Missio\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\"},\"headline\":\"Idaho&#8217;s tallest building replaces the Boise Hole\",\"datePublished\":\"2015-07-03T13:38:26+00:00\",\"dateModified\":\"2017-01-27T20:37:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/\"},\"wordCount\":708,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/Image1.jpg\",\"keywords\":[\"Curtain wall\",\"Glazing\",\"Idaho\",\"Mixed-use\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"UniFormat\",\"08 40 00 Entrances, Storefronts, and Curtain Walls\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/\",\"name\":\"Idaho's tallest building replaces the Boise Hole - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/Image1.jpg\",\"datePublished\":\"2015-07-03T13:38:26+00:00\",\"dateModified\":\"2017-01-27T20:37:05+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/Image1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/07\\\/Image1.jpg\",\"width\":683,\"height\":1024,\"caption\":\"Located in downtown Boise, Eighth and Main\u2019s 18-story mixed-use building is the tallest building in Idaho and the first in the state to use unitized curtain wall. Photos \u00a9 Marc Walters Photography. Photos courtesy Wausau Window and Wall Systems\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/idahos-tallest-building-replaces-the-boise-hole\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Idaho&#8217;s tallest building replaces the Boise Hole\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\",\"name\":\"Erik Missio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"caption\":\"Erik Missio\"},\"sameAs\":[\"http:\\\/\\\/www.constructionspecifier.com\"],\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/erik-missio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Idaho's tallest building replaces the Boise Hole - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/","og_locale":"en_US","og_type":"article","og_title":"Idaho's tallest building replaces the Boise Hole - The Construction Specifier","og_description":"Rising above Boise\u2019s skyline to become the tallest in Idaho, the Eighth and Main building prominently features a unitized glazed curtain wall and sunshades. The $76-million, 18-story mixed-use building opened last February.","og_url":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/","og_site_name":"The Construction Specifier","article_published_time":"2015-07-03T13:38:26+00:00","article_modified_time":"2017-01-27T20:37:05+00:00","og_image":[{"width":683,"height":1024,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1.jpg","type":"image\/jpeg"}],"author":"Erik Missio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Erik Missio","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/"},"author":{"name":"Erik Missio","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b"},"headline":"Idaho&#8217;s tallest building replaces the Boise Hole","datePublished":"2015-07-03T13:38:26+00:00","dateModified":"2017-01-27T20:37:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/"},"wordCount":708,"commentCount":1,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1.jpg","keywords":["Curtain wall","Glazing","Idaho","Mixed-use"],"articleSection":["Form+Function","MasterFormat","UniFormat","08 40 00 Entrances, Storefronts, and Curtain Walls","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/","url":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/","name":"Idaho's tallest building replaces the Boise Hole - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1.jpg","datePublished":"2015-07-03T13:38:26+00:00","dateModified":"2017-01-27T20:37:05+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/07\/Image1.jpg","width":683,"height":1024,"caption":"Located in downtown Boise, Eighth and Main\u2019s 18-story mixed-use building is the tallest building in Idaho and the first in the state to use unitized curtain wall. Photos \u00a9 Marc Walters Photography. Photos courtesy Wausau Window and Wall Systems"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/idahos-tallest-building-replaces-the-boise-hole\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Idaho&#8217;s tallest building replaces the Boise Hole"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b","name":"Erik Missio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","caption":"Erik Missio"},"sameAs":["http:\/\/www.constructionspecifier.com"],"url":"https:\/\/www.constructionspecifier.com\/author\/erik-missio\/"}]}},"views":10753,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/10070","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=10070"}],"version-history":[{"count":8,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/10070\/revisions"}],"predecessor-version":[{"id":23016,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/10070\/revisions\/23016"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/10102"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=10070"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=10070"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=10070"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}