{"id":105056,"date":"2020-01-24T17:29:13","date_gmt":"2020-01-24T22:29:13","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=105056"},"modified":"2020-01-31T12:44:35","modified_gmt":"2020-01-31T17:44:35","slug":"stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/","title":{"rendered":"Stantec to lead design $129M project to future-proof NYC waterfront"},"content":{"rendered":"<figure id=\"attachment_105058\" aria-describedby=\"caption-attachment-105058\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Opener-26.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-105058\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Opener-26-300x175.jpg\" alt=\"Stantec has been selected to lead the design for the Battery Coastal Resilience Project in Lower Manhattan, New York City. Image courtesy Stantec\" width=\"300\" height=\"175\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Opener-26-300x175.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Opener-26-500x292.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Opener-26.jpg 650w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-105058\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Stantec has been selected to lead the design for the Battery Coastal Resilience Project in Lower Manhattan, New York City.<\/span><br \/><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Image courtesy Stantec<\/span><\/em><\/figcaption><\/figure>\n<p><a href=\"https:\/\/www.stantec.com\/en\" target=\"_blank\" rel=\"noopener noreferrer\">Stantec<\/a> has been selected by the <a href=\"https:\/\/edc.nyc\/\" target=\"_blank\" rel=\"noopener noreferrer\">New York City Economic Development Corporation<\/a> (NYCEDC) to lead design the Battery Coastal Resilience Project, spanning one-third of a mile of waterfront along the 10-ha (25-acre) Battery Park.<\/p>\n<p>The project is one of several underway or in planning as part of the city\u2019s Lower Manhattan Coastal Resiliency initiative focused on protecting Lower Manhattan from the impacts of rising sea levels caused by climate change.<\/p>\n<p>As part of the four-year, $129-million (total) project, Stantec will lead design plans for a reconstructed wharf at the southern tip of Manhattan that will raise the waterfront esplanade approximately 1.5 m (5 ft) above its current elevation\u20143 m (11 ft) above mean sea level\u2014to protect the park and nearby community, as the Battery currently sits at an elevation that will be submerged as sea levels rise.<\/p>\n<p>Several complex issues will be addressed in the design, including in-water construction, interior drainage, and integration of a new wharf elevation with the existing parkland. The project team anticipates using an adaptive design strategy that will continue to provide views of the New York harbor, relief from sea level rise and nuisance flooding, and flexibility for uncertain future conditions. Resilient planting will also be critical in ensuring survivability from major storms.<\/p>\n<p>The interdisciplinary design will be led out of Stantec\u2019s New York City office and will include landscape architecture, waterfront engineering, and environmental review, with the support of several specialty contractors. Design is expected to take 18 months.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Stantec has been selected to lead the design for the Battery Coastal Resilience Project in Lower Manhattan, New York City.<\/p>\n","protected":false},"author":13542,"featured_media":105057,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[4106,5687,5561],"class_list":["post-105056","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-nyc","tag-nycedc","tag-stantec","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Stantec to lead design $129M project to future-proof NYC waterfront - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"Stantec has been selected to lead the design for the Battery Coastal Resilience Project in Lower Manhattan, New York City.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Stantec to lead design $129M project to future-proof NYC waterfront - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Stantec has been selected to lead the design for the Battery Coastal Resilience Project in Lower Manhattan, New York City.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2020-01-24T22:29:13+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-31T17:44:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Feature-28.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"650\" \/>\n\t<meta property=\"og:image:height\" content=\"380\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"sadia_badhon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"sadia_badhon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/\"},\"author\":{\"name\":\"sadia_badhon\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\"},\"headline\":\"Stantec to lead design $129M project to future-proof NYC waterfront\",\"datePublished\":\"2020-01-24T22:29:13+00:00\",\"dateModified\":\"2020-01-31T17:44:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/\"},\"wordCount\":284,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/Feature-28.jpg\",\"keywords\":[\"NYC\",\"NYCEDC\",\"Stantec\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/\",\"name\":\"Stantec to lead design $129M project to future-proof NYC waterfront - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/Feature-28.jpg\",\"datePublished\":\"2020-01-24T22:29:13+00:00\",\"dateModified\":\"2020-01-31T17:44:35+00:00\",\"description\":\"Stantec has been selected to lead the design for the Battery Coastal Resilience Project in Lower Manhattan, New York City.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/Feature-28.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/01\\\/Feature-28.jpg\",\"width\":650,\"height\":380},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Stantec to lead design $129M project to future-proof NYC waterfront\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\",\"name\":\"sadia_badhon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"caption\":\"sadia_badhon\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/sadia_badhon\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Stantec to lead design $129M project to future-proof NYC waterfront - The Construction Specifier","description":"Stantec has been selected to lead the design for the Battery Coastal Resilience Project in Lower Manhattan, New York City.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/","og_locale":"en_US","og_type":"article","og_title":"Stantec to lead design $129M project to future-proof NYC waterfront - The Construction Specifier","og_description":"Stantec has been selected to lead the design for the Battery Coastal Resilience Project in Lower Manhattan, New York City.","og_url":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/","og_site_name":"The Construction Specifier","article_published_time":"2020-01-24T22:29:13+00:00","article_modified_time":"2020-01-31T17:44:35+00:00","og_image":[{"width":650,"height":380,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Feature-28.jpg","type":"image\/jpeg"}],"author":"sadia_badhon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"sadia_badhon","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/"},"author":{"name":"sadia_badhon","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e"},"headline":"Stantec to lead design $129M project to future-proof NYC waterfront","datePublished":"2020-01-24T22:29:13+00:00","dateModified":"2020-01-31T17:44:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/"},"wordCount":284,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Feature-28.jpg","keywords":["NYC","NYCEDC","Stantec"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/","url":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/","name":"Stantec to lead design $129M project to future-proof NYC waterfront - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Feature-28.jpg","datePublished":"2020-01-24T22:29:13+00:00","dateModified":"2020-01-31T17:44:35+00:00","description":"Stantec has been selected to lead the design for the Battery Coastal Resilience Project in Lower Manhattan, New York City.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Feature-28.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/01\/Feature-28.jpg","width":650,"height":380},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/stantec-to-lead-design-129m-project-to-future-proof-nyc-waterfront\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Stantec to lead design $129M project to future-proof NYC waterfront"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e","name":"sadia_badhon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","caption":"sadia_badhon"},"url":"https:\/\/www.constructionspecifier.com\/author\/sadia_badhon\/"}]}},"views":5119,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/105056","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/13542"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=105056"}],"version-history":[{"count":4,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/105056\/revisions"}],"predecessor-version":[{"id":105651,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/105056\/revisions\/105651"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/105057"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=105056"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=105056"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=105056"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}