{"id":107574,"date":"2020-03-04T14:58:42","date_gmt":"2020-03-04T19:58:42","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=107574"},"modified":"2020-02-25T15:17:48","modified_gmt":"2020-02-25T20:17:48","slug":"polyisocyanurate-insulation-and-the-vapor-retarder-paradox","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/","title":{"rendered":"Polyisocyanurate insulation and the vapor retarder paradox"},"content":{"rendered":"<p><strong>by Tom Robertson<\/strong><\/p>\n<figure id=\"attachment_107579\" aria-describedby=\"caption-attachment-107579\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-107579\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003-300x200.jpg\" alt=\"Photo courtesy Atlas Roofing Corporation\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003-500x334.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003-768x513.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-107579\" class=\"wp-caption-text\"><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photo courtesy Atlas Roofing Corporation<\/span><\/em><\/figcaption><\/figure>\n<p>The world of construction is filled with contronyms\u2014words having two completely opposite meanings. Has a building weathered many seasons, or is it falling apart because it is so weathered? Is the contractor providing good oversight, or did an oversight set off an angry client? Anyone in the construction industry can vouch that almost nothing is ever quite as straightforward as one might hope.<\/p>\n<p>Like a contronym, here is another word that causes plenty of headaches\u2014vapor retarder. In a given application, it can have opposite effects depending on its properties and conditions of use.\u00a0 Employed correctly, it can help keep structures dry, and when used incorrectly, it can contribute to moisture accumulation and prevent structures from drying. This creates a paradox of sorts because some vapor retarder materials, like polyisocyanurate (ISO) insulation, may be perceived as a problem. In reality, such materials can provide a simple and effective solution to water, air, vapor, and thermal control for building enclosures. The solution is proper application in coordination with the climate conditions and the overall design of any building envelope assembly (<em>i.e.<\/em> above-grade walls, below-grade basement and crawlspace walls, and roofs).<\/p>\n<figure id=\"attachment_107581\" aria-describedby=\"caption-attachment-107581\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-1-insulation.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-107581\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-1-insulation-300x159.jpg\" alt=\"Figure 1: \u2018The perfect wall\u2019 has all of the control layers (water, air, thermal, and vapor) located on the exterior side of the building envelope assembly and thus entails the use of continuous insulation (ci) materials like polyisocyanurate (ISO).  Images courtesy Applied Building Technology Group\" width=\"300\" height=\"159\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-1-insulation-300x159.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-1-insulation-500x266.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-1-insulation-768x408.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-1-insulation.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-107581\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\"><strong>Figure 1<\/strong>: \u2018The perfect wall\u2019 has all of the control layers (water, air, thermal, and vapor) located on the exterior side of the building envelope assembly and thus entails the use of continuous insulation (ci) materials like polyisocyanurate (ISO).<\/span><br \/><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Images courtesy Applied Building Technology Group<\/span><\/em><\/figcaption><\/figure>\n<p>In its different forms (liquid, vapor, and solid), water is the great enemy of long-lasting, efficient construction. Water can cause sound structures to crumble from corrosion, rot, and rust. It can provide an environment for harmful mold that can be difficult and expensive to eradicate. It can completely ruin a building\u2019s aesthetics. Water is, quite literally, a relentless force of nature for good or bad. This natural dichotomy is why it must be managed or controlled in any reasonable design approach and can never be completely eliminated.<\/p>\n<p><strong>Above-grade vapor control methods<\/strong><\/p>\n<p>The ideal wall is one that provides an uninterrupted thermal barrier to keep the building envelope protected and ensures long-term energy efficiency. To that end, a building must be resistant to water and air, manage vapor, and limit heat transfer, prioritized in that order, as detailed by Dr. Joseph Lsitburek of Building Science Corporation in his description of \u2018<a href=\"http:\/\/www.buildingscience.com\/documents\/insights\/bsi-001-the-perfect-wall\" target=\"_blank\" rel=\"noopener noreferrer\">the perfect wall<\/a>.\u2019 As shown in Figure 1, the perfect wall has all of the control layers (water, air, thermal, and vapor) located on the exterior side of the building envelope assembly and thus entails the use of continuous insulation (ci) materials like ISO. For example, an interior vapor retarder is not required and instead the vapor control layer is provided on the exterior side (<em>e.g.<\/em> by the inner facing of the foil-faced ISO). This maximizes the ability of the assembly to dry to the interior. While the perfect wall may indeed be the ideal solution, there are other wall configurations that will perform well for a given application.<\/p>\n<p>One example of an \u2018optimal\u2019 variant from the perfect wall is an above-grade wall with a combination of cavity insulation and exterior ci for thermal control to satisfy the energy code. This is also known as a hybrid wall (Figure 2). A key design consideration is the insulation ratio which compares the exterior ci R-value to the cavity insulation R-value\u2014material properties that are readily available and familiar to building professionals. When exterior ci materials like foil-faced ISO are used for this purpose, it provides thermal control, thereby, saving energy and preventing thermal bridging through wall framing. It also prevents moisture accumulation by shielding the wall from outdoor water-vapor sources in the humid summer while keeping the interior of the wall warm during the winter to prevent condensation or high humidity. This is particularly true when the ci is also approved for use as a water control layer (<em>i.e.<\/em> water-resistive barrier [WRB]) and air barrier. For any wall design, it is of primary importance to control water and air movement. In other words, it is pertinent to never overlook the perfect wall priorities mentioned earlier, even if specifying a variant like the hybrid wall.<!--nextpage--><\/p>\n<figure id=\"attachment_107582\" aria-describedby=\"caption-attachment-107582\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-2-insulation.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-107582 size-medium\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-2-insulation-300x160.jpg\" alt=\"Figure 2: Hybrid wall assembly (cavity and ci).\" width=\"300\" height=\"160\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-2-insulation-300x160.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-2-insulation-500x266.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-2-insulation-768x409.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/figure-2-insulation.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-107582\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\"><strong>Figure 2<\/strong>: Hybrid wall assembly (cavity and ci).<\/span><\/figcaption><\/figure>\n<p>The \u2018warm wall\u2019 design approach described above is simple to implement and robust in the field. It controls the temperature of the assembly and promotes drying to the interior through the selection of an appropriate interior vapor retarder, such as interior latex paint, kraft paper, or various types of \u2018smart\u2019 vapor retarders. The warm wall design is based on a temperature-controlled design approach and, as such, removes the headache of attempting to control moisture purely by a traditional \u2018water vapor permeance\u2019 design approach. The downfall of the traditional method is it requires careful specification of the vapor retarder properties of each material layer on the interior and exterior of the assembly. For many materials, this property may be unknown or uncertain. It also attempts to walk a fine line between outward (wintertime) and inward (summertime) water vapor movement, which ends up cycling the assembly through seasonal periods of higher and lower moisture. Conversely, a warm wall design results in a stable and dry assembly year-round.<\/p>\n<p>As energy codes continue to advance, the traditional vapor retarder design approach has become more and more challenging to reliably implement. Increasing cavity insulation levels can worsen the vulnerability to condensation or moisture accumulation by causing wood or gypsum sheathing materials to become colder (not warmer), resulting in condensation on surfaces.<\/p>\n<figure id=\"attachment_107580\" aria-describedby=\"caption-attachment-107580\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00261.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-107580\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00261-300x200.jpg\" alt=\"A construction project in California utilizing polyisocyanurate (ISO) insulation to protect against vapor and moisture intrusion.   Photos courtesy Atlas Roofing Corporation\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00261-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00261-500x334.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00261-768x513.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00261.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-107580\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">A construction project in California utilizing polyisocyanurate (ISO) insulation to protect against vapor and moisture intrusion.<\/span><br \/><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photos courtesy Atlas Roofing Corporation<\/span><\/em><\/figcaption><\/figure>\n<p>However, the use of ci for a warm wall design completely changes this challenge into an opportunity to leverage newer energy code insulation requirements in a way that also improves moisture performance. Fortunately, energy codes always afford specifiers the ability to use ci (alone, as in the perfect wall, or together with cavity insulation) whether it is offered in the code as a prescriptive option or not. Also, building codes are in the process of updating <a href=\"http:\/\/www.continuousinsulation.org\" target=\"_blank\" rel=\"noopener noreferrer\">vapor control provisions<\/a> to better coordinate with advancements in the energy code, such as in the case of the upcoming 2021 editions of the <em>International Building Code<\/em> (<em>IBC<\/em>), <em>International Residential Code<\/em> (<em>IRC<\/em>), and <em>International Energy Conservation Code<\/em> (<em>IECC<\/em>).<\/p>\n<p><strong>Below-grade vapor control methods<\/strong><\/p>\n<p>The discussion so far has been focused on above-grade wall applications, but what about below-grade walls? Well, the same principles apply, but in many ways, basements are easier because the climate below-grade does not change as much with the seasons. Basically, the ground is always moist and moderates the outside temperature year-round. The result is water vapor drives are always inward. Of course, the same high priority for liquid water control applies. All high performing basement walls start with:<\/p>\n<ul>\n<li>proper drainage of surface water (slope of grade away from building);<\/li>\n<li>drainage to remove any liquid water in the soil away from the foundation; and<\/li>\n<li>waterproofing the below-grade outside surface of the basement wall.<\/li>\n<\/ul>\n<p>Nearly 90 percent of basement moisture problems are related to the failure to provide or maintain one or more of these crucial features.<\/p>\n<p>For basements, the perfect wall concept also applies as the ideal solution. This simply requires the use of ci on the exterior side of the basement wall. However, for practical reasons, it is often optimal to use ci on the interior side of the assembly together with the water control strategies discussed above. These practical reasons include the need to protect the insulation (particularly above-grade portions) and the need to retrofit an existing basement (like the case study addressed in the next section). When insulating and finishing a basement on the interior side, it is important to be mindful of where the vapor retarder layer is placed. Ideally, vapor retarder should be layered directly on the interior surface of the block or concrete wall and should be water-resistant and insulating, like ISO ci, in order to protect moisture-sensitive materials. Consequently, wood framing, furring, gypsum, and water-absorbing insulation materials should be placed on the inside of the ci layer. This approach is consistent with the U.S. <a href=\"http:\/\/www.energy.gov\/eere\/buildings\/building-america\" target=\"_blank\" rel=\"noopener noreferrer\">Department of Energy<\/a>\u2019s (DOE\u2019s) Building America Program best practices for foundations.<!--nextpage--><\/p>\n<figure id=\"attachment_107584\" aria-describedby=\"caption-attachment-107584\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Untitled_Panorama.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-107584\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Untitled_Panorama-300x144.jpg\" alt=\"Nearing completion, this project in California includes ISO to protect against the elements and meet building codes.\" width=\"300\" height=\"144\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Untitled_Panorama-300x144.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Untitled_Panorama-500x241.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Untitled_Panorama-768x370.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Untitled_Panorama.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-107584\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Nearing completion, this project in California includes ISO to protect against the elements and meet building codes.<\/span><\/figcaption><\/figure>\n<p><strong>Real-world application<\/strong><\/p>\n<p>Understanding the principles and methods for controlling water vapor is all well and good, but how does it work in a practical application? A recent residential project in Marietta, Georgia, provides a good example of how ISO insulation helps control moisture issues.<\/p>\n<p>Homeowners Jon and Rachel recently remodeled their basement to create a comfortable suite for Jon\u2019s mother. The previous structure of the basement made it difficult to comfortably control the basement temperature, and condensation issues had led to a strong, musty odor. The couple had already decided to install a second HVAC unit to help control the basement temperature, though they were concerned about increasing energy usage. They also knew they needed a better way to control moisture to rid the area of its musty smell.<\/p>\n<p>Jon and Rachel decided to incorporate a better insulation solution to create a comfortable environment. They installed foil-faced continuous ISO insulation on the interior side and directly to the basement walls. Since the foil-faced ISO insulation is vapor impermeable and the basement is below grade, wood framing and drywall were placed on the interior side of the ISO. This protected the wood and interior finishes from moisture moving inward through the basement wall. There was no additional vapor retarder placed behind the finish on the wood frame, as the foil-faced ISO provided for insulation and a properly located vapor retarder for the basement wall. In the end, this approach solved their moisture-control issues and created a healthier, cleaner environment. As an added bonus, Jon and Rachel have noticed little change in their energy costs because the new basement space is so energy efficient.<\/p>\n<p>In the case of this application, the insulation method was a simple and effective way to control moisture issues with few compromises. While each project requires builders to consider a variety of factors, such as the thickness of the wall design, extreme climate, or the client\u2019s budget, the insulation method can be applicable in a variety of both residential and commercial applications.<\/p>\n<p><strong>Conclusion<\/strong><\/p>\n<p>While every project and its specifications will be different, the vapor control and insulation methods described above are available and generally applicable to <a href=\"http:\/\/www.continuousinsulation.org\" target=\"_blank\" rel=\"noopener noreferrer\">optimize wall performance<\/a> and minimize moisture issues.<\/p>\n<p class=\"Sidebar-BodyTextsidebar\"><em><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Tom-Robertson.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-107583 alignleft\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Tom-Robertson-212x300.jpg\" alt=\"\" width=\"51\" height=\"72\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Tom-Robertson-212x300.jpg 212w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Tom-Robertson-353x500.jpg 353w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Tom-Robertson.jpg 564w\" sizes=\"auto, (max-width: 51px) 100vw, 51px\" \/><\/a>Tom Robertson is an experienced thought leader in the continuous insulation (ci) industry, developing and executing strategy as business unit manager for the Atlas Wall CI division. He oversees the wall insulation business unit including marketing, sales, product development, and customer relationships. Robertson holds a master\u2019s degree from the Georgia Institute of Technology and has 20 years of experience in insulated wall design and products including insulations, weather barriers, and fa\u00e7ade finishes. He can be contacted via e-mail at <a href=\"mailto:trobertson@atlasroofing.com\" target=\"_blank\" rel=\"noopener noreferrer\">trobertson@atlasroofing.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The use of continuous insulation (ci) for a warm wall design creates an opportunity to leverage newer energy code insulation requirements in a way that also improves the building\u2019s moisture performance.<\/p>\n","protected":false},"author":13542,"featured_media":107579,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,187,4008,489,460],"tags":[66,83,1195,70,1875,1114,5732],"class_list":["post-107574","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-07-00-00-thermal-and-moisture-protection","category-07-24-00-exterior-insulation-and-finish-systems","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-building-envelope","tag-continuous-insulation","tag-division-07","tag-insulation","tag-polyisocyanurate","tag-vapor-retarder","tag-warm-wall-design","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Polyisocyanurate insulation and the vapor retarder paradox - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"The use of continuous insulation (ci) for a warm wall design creates an opportunity to leverage newer energy code insulation requirements.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Polyisocyanurate insulation and the vapor retarder paradox - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"The use of continuous insulation (ci) for a warm wall design creates an opportunity to leverage newer energy code insulation requirements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-04T19:58:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"534\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"sadia_badhon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"sadia_badhon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/\"},\"author\":{\"name\":\"sadia_badhon\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\"},\"headline\":\"Polyisocyanurate insulation and the vapor retarder paradox\",\"datePublished\":\"2020-03-04T19:58:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/\"},\"wordCount\":1880,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/DSC00003.jpg\",\"keywords\":[\"building envelope\",\"continuous insulation\",\"Division 07\",\"Insulation\",\"Polyisocyanurate\",\"Vapor retarder\",\"Warm wall design\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"07 00 00 Thermal and Moisture Protection\",\"07 24 00 Exterior Insulation and Finish Systems\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/\",\"name\":\"Polyisocyanurate insulation and the vapor retarder paradox - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/DSC00003.jpg\",\"datePublished\":\"2020-03-04T19:58:42+00:00\",\"description\":\"The use of continuous insulation (ci) for a warm wall design creates an opportunity to leverage newer energy code insulation requirements.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/DSC00003.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/DSC00003.jpg\",\"width\":800,\"height\":534,\"caption\":\"The magazine\u2019s series of sponsored e-books continues with an exploration of polyisocyanurate insulation. Photo courtesy Atlas Roofing Corporation\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\",\"name\":\"sadia_badhon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"caption\":\"sadia_badhon\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/sadia_badhon\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Polyisocyanurate insulation and the vapor retarder paradox - The Construction Specifier","description":"The use of continuous insulation (ci) for a warm wall design creates an opportunity to leverage newer energy code insulation requirements.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/","next":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/2\/","og_locale":"en_US","og_type":"article","og_title":"Polyisocyanurate insulation and the vapor retarder paradox - The Construction Specifier","og_description":"The use of continuous insulation (ci) for a warm wall design creates an opportunity to leverage newer energy code insulation requirements.","og_url":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/","og_site_name":"The Construction Specifier","article_published_time":"2020-03-04T19:58:42+00:00","og_image":[{"width":800,"height":534,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003.jpg","type":"image\/jpeg"}],"author":"sadia_badhon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"sadia_badhon","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/"},"author":{"name":"sadia_badhon","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e"},"headline":"Polyisocyanurate insulation and the vapor retarder paradox","datePublished":"2020-03-04T19:58:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/"},"wordCount":1880,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003.jpg","keywords":["building envelope","continuous insulation","Division 07","Insulation","Polyisocyanurate","Vapor retarder","Warm wall design"],"articleSection":["Features","MasterFormat","UniFormat","07 00 00 Thermal and Moisture Protection","07 24 00 Exterior Insulation and Finish Systems","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/","url":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/","name":"Polyisocyanurate insulation and the vapor retarder paradox - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003.jpg","datePublished":"2020-03-04T19:58:42+00:00","description":"The use of continuous insulation (ci) for a warm wall design creates an opportunity to leverage newer energy code insulation requirements.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/polyisocyanurate-insulation-and-the-vapor-retarder-paradox\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/DSC00003.jpg","width":800,"height":534,"caption":"The magazine\u2019s series of sponsored e-books continues with an exploration of polyisocyanurate insulation. Photo courtesy Atlas Roofing Corporation"},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e","name":"sadia_badhon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","caption":"sadia_badhon"},"url":"https:\/\/www.constructionspecifier.com\/author\/sadia_badhon\/"}]}},"views":20580,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/107574","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/13542"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=107574"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/107574\/revisions"}],"predecessor-version":[{"id":107590,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/107574\/revisions\/107590"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/107579"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=107574"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=107574"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=107574"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}