{"id":107690,"date":"2020-03-06T10:30:27","date_gmt":"2020-03-06T15:30:27","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=107690"},"modified":"2020-02-26T10:47:43","modified_gmt":"2020-02-26T15:47:43","slug":"anchoring-replacement-windows","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/","title":{"rendered":"Anchoring replacement windows"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-569 size-full\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2013\/08\/slaton.jpg\" alt=\"slaton\" width=\"100\" height=\"104\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-571 alignleft\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2013\/08\/patterson.jpg\" alt=\"patterson\" width=\"100\" height=\"104\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-18890\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/09\/Itle-291x300.jpg\" width=\"101\" height=\"104\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/09\/Itle-291x300.jpg 291w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/09\/Itle.jpg 606w\" sizes=\"auto, (max-width: 101px) 100vw, 101px\" \/><span style=\"font-size: large;\"><strong><span style=\"color: #808080;\">FAILURES<\/span><\/strong><\/span><br \/>\n<strong>Deborah Slaton, David S. Patterson, AIA, and Kenneth M. Itle, AIA<\/strong><\/p>\n<p>Replacement windows present challenges in terms of installation and anchorage, especially in ensuring resistance to air and water infiltration and providing reliable structural support. In a 1910 midrise, a former industrial building, new windows were installed within the exterior fa\u00e7ade consisting of brick masonry and an exposed concrete structural frame. In this building, brick masonry is used as partial-height spandrel walls below the windows and extends between adjacent concrete columns. Replacement windows were installed approximately 10 years ago, at which time the window openings were made taller to accommodate the larger units. The windows were also provided with new sills closer to the floor level by removing masonry below the original sill location.<\/p>\n<figure id=\"attachment_107693\" aria-describedby=\"caption-attachment-107693\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-107693\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1-300x200.jpg\" alt=\"The void at the middle of this image represents the original window sill height. Note the light gauge clips and small fasteners used to secure the window in place. Photos \u00a9 Kenneth Itle and David Patterson, WJE\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1-500x334.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1-768x513.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-107693\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The void at the middle of this image represents the original window sill height. Note the light gauge clips and small fasteners used to secure the window in place.<\/span><br \/><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photos \u00a9 Kenneth Itle and David Patterson, WJE<\/span><\/em><\/figcaption><\/figure>\n<p>During a recent water leakage investigation, the removal of interior finishes revealed conditions related to the replacement window installation. The windows are aluminum-framed, single-hung units. They were installed directly into the rough opening without a new sub-frame. The original exterior wall construction included a 25-mm (1-in.) deep reveal in the concrete structural columns, into which the middle wythe of the three-wythe brick masonry was keyed to provide lateral stability for the brick infill panel. When the window rough opening was enlarged to accommodate new units, a simple sawcut was made in the brick infill wall. The masonry remnants extending into the column reveal were ignored and left in place.<\/p>\n<figure id=\"attachment_107694\" aria-describedby=\"caption-attachment-107694\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-107694\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-2-300x225.jpg\" alt=\"In this example, new window anchorage was designed to engage the structural concrete frame.\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-2-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-2-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-2-768x576.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-2.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-107694\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">In this example, new window anchorage was designed to engage the structural concrete frame.<\/span><\/figcaption><\/figure>\n<p>The new windows were anchored with a series of multiple light gauge clips and small diameter screws, fastened directly to the frame and the adjacent concrete or masonry. At the upper half of the new window, the fasteners engaged the structural concrete column, and at the lower half, the fasteners extended only into the brick and mortar remaining within the column reveal. The brick and mortar remnants have deteriorated and are unstable. Therefore, the window anchorage for the lower half of the window is considered unreliable. Repairs will involve removal of the windows, repair\/replacement of the brick masonry, and reinstallation of the window unit with appropriate fasteners that are sufficiently long to engage the structural concrete.<\/p>\n<p>In contrast, another installation of new aluminum-framed windows in an existing concrete and masonry structure benefitted from proper detailing. Prior to large-scale project implementation, a mockup installation was performed. The mockup process included removal of non-original older windows, exposing abandoned remnants of the original window system as well as the true profile of the structural concrete surround. The stainless steel anchorage for the new window was then designed to accommodate both the new window system and the configuration and condition of the structural substrate.<\/p>\n<p><span style=\"color: #808080;\">The opinions expressed in Failures are based on the authors\u2019 experiences and do not necessarily reflect those of\u00a0<em>The Construction Specifier<\/em>\u00a0or CSI.<\/span><\/p>\n<p><em>Deborah Slaton is an architectural conservator and principal with Wiss, Janney, Elstner Associates (WJE) in Northbrook, Illinois, specializing in historic preservation and materials conservation. She can be reached at <a href=\"mailto:dslaton@wje.com\" target=\"_blank\" rel=\"noopener noreferrer\">dslaton@wje.com<\/a>.<\/em><\/p>\n<p><em>David S. Patterson, AIA, is an architect and senior principal with WJE\u2019s office in Princeton, New Jersey. He specializes in investigation and repair of the building envelope. He can be reached at <a href=\"mailto:dpatterson@wje.com\" target=\"_blank\" rel=\"noopener noreferrer\">dpatterson@wje.com<\/a>.<\/em><\/p>\n<p><em>Kenneth M. Itle, AIA, is an architect and associate principal with the Northbrook office of WJE, specializing in historic preservation. He can be reached via e-mail at <a href=\"mailto:kitle@wje.com\" target=\"_blank\" rel=\"noopener noreferrer\">kitle@wje.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Replacement windows present challenges in terms of installation and anchorage, especially in ensuring resistance to air and water infiltration and providing reliable structural support.<\/p>\n","protected":false},"author":13542,"featured_media":107693,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,24],"tags":[5735],"class_list":["post-107690","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-columns","category-failures","tag-replacement-windows","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Anchoring replacement windows - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"Replacement windows present challenges in terms of installation and anchorage, especially in ensuring resistance to air and water infiltration and providing reliable structural support.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Anchoring replacement windows - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Replacement windows present challenges in terms of installation and anchorage, especially in ensuring resistance to air and water infiltration and providing reliable structural support.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-06T15:30:27+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"534\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"sadia_badhon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"sadia_badhon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/\"},\"author\":{\"name\":\"sadia_badhon\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\"},\"headline\":\"Anchoring replacement windows\",\"datePublished\":\"2020-03-06T15:30:27+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/\"},\"wordCount\":622,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/Photo-1.jpg\",\"keywords\":[\"Replacement windows\"],\"articleSection\":[\"Columns\",\"Failures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/\",\"name\":\"Anchoring replacement windows - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/Photo-1.jpg\",\"datePublished\":\"2020-03-06T15:30:27+00:00\",\"description\":\"Replacement windows present challenges in terms of installation and anchorage, especially in ensuring resistance to air and water infiltration and providing reliable structural support.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/Photo-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2020\\\/02\\\/Photo-1.jpg\",\"width\":800,\"height\":534,\"caption\":\"The void at the middle of this image represents the original window sill height. Note the light gauge clips and small fasteners used to secure the window in place. Photos \u00a9 Kenneth Itle and David Patterson, WJE\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/anchoring-replacement-windows\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Anchoring replacement windows\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\",\"name\":\"sadia_badhon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"caption\":\"sadia_badhon\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/sadia_badhon\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Anchoring replacement windows - The Construction Specifier","description":"Replacement windows present challenges in terms of installation and anchorage, especially in ensuring resistance to air and water infiltration and providing reliable structural support.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/","og_locale":"en_US","og_type":"article","og_title":"Anchoring replacement windows - The Construction Specifier","og_description":"Replacement windows present challenges in terms of installation and anchorage, especially in ensuring resistance to air and water infiltration and providing reliable structural support.","og_url":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/","og_site_name":"The Construction Specifier","article_published_time":"2020-03-06T15:30:27+00:00","og_image":[{"width":800,"height":534,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1.jpg","type":"image\/jpeg"}],"author":"sadia_badhon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"sadia_badhon","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/"},"author":{"name":"sadia_badhon","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e"},"headline":"Anchoring replacement windows","datePublished":"2020-03-06T15:30:27+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/"},"wordCount":622,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1.jpg","keywords":["Replacement windows"],"articleSection":["Columns","Failures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/","url":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/","name":"Anchoring replacement windows - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1.jpg","datePublished":"2020-03-06T15:30:27+00:00","description":"Replacement windows present challenges in terms of installation and anchorage, especially in ensuring resistance to air and water infiltration and providing reliable structural support.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2020\/02\/Photo-1.jpg","width":800,"height":534,"caption":"The void at the middle of this image represents the original window sill height. Note the light gauge clips and small fasteners used to secure the window in place. Photos \u00a9 Kenneth Itle and David Patterson, WJE"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/anchoring-replacement-windows\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Anchoring replacement windows"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e","name":"sadia_badhon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","caption":"sadia_badhon"},"url":"https:\/\/www.constructionspecifier.com\/author\/sadia_badhon\/"}]}},"views":6802,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/107690","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/13542"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=107690"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/107690\/revisions"}],"predecessor-version":[{"id":107698,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/107690\/revisions\/107698"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/107693"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=107690"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=107690"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=107690"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}