{"id":131384,"date":"2021-11-03T08:37:21","date_gmt":"2021-11-03T12:37:21","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=131384"},"modified":"2021-11-08T15:49:20","modified_gmt":"2021-11-08T20:49:20","slug":"trial-to-trend-the-growth-of-prefabricated-exterior-walls","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/","title":{"rendered":"Trial to trend: The growth of prefabricated exterior walls"},"content":{"rendered":"<figure id=\"attachment_131386\" aria-describedby=\"caption-attachment-131386\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-131386 size-medium\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-768x576.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-131386\" class=\"wp-caption-text\"><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photos courtesy StoPanel Affiliate Southern Wall Systems<\/span><\/em><\/figcaption><\/figure>\n<p><strong>By Tim Salerno<\/strong><\/p>\n<p>A global pandemic rocking the foundation of a world economy. A widespread labor shortage causing employers of every kind to scramble for qualified workers. Extreme weather, from hurricanes and flooding to wildfires and intense heat.<\/p>\n<p>The United States has witnessed each of these scenarios in the past two years, and in each case, there was a negative impact to the construction industry. In some cases, activity came to a complete halt. This affected everyone in the stakeholder chain\u2013the architect, the specifier, the contractor, product manufacturers, installation crews, and the facility\u2019s owner. Each of these scenarios created chaos with delivery timelines and increased project costs.<\/p>\n<p>When prefabrication enters the construction equation, the variables change dramatically. Crews can manufacture fully fabricated exterior wall panels (including the fa\u00e7ade) in a climate-controlled facility with no weather limitations. The wall panels can then be transported to a job site where they are hoisted into place and attached to the structure without the need for exterior access. In fact, prefabrication can provide up to 80 percent reduction in building envelope installation time with a substantial reduction in on-site installation team size and minimize the impact of weather.<\/p>\n<p>In the wake of COVID-19, many construction professionals experienced the value proposition of working in a safe, controlled environment removing the uncertainties of working in the field. Add in a post-pandemic labor shortage, and prefabrication becomes an even more popular solution, because it requires a smaller crew to complete a job.<\/p>\n<p>The evolution of prefabrication stretches back more than 40 years. As the construction industry has matured, prefabrication has gained momentum as more building owners and contractors realize the benefits. At the same time, fuller adoption of the approach requires a different mindset from all involved parties including owners, architects, general contractors, wall consultants, fabricators, and other trades.<\/p>\n<p>In essence, the market has been primed for prefabricated exterior walls for some time. As they gain traction, the benefits of prefabrication become even more apparent. Its potential has yet to be fully realized.<\/p>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_131387\" aria-describedby=\"caption-attachment-131387\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/One-Bala-Plaza-001_1381.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-131387 size-medium\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/One-Bala-Plaza-001_1381-300x201.jpg\" alt=\"\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/One-Bala-Plaza-001_1381-300x201.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/One-Bala-Plaza-001_1381-500x335.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/One-Bala-Plaza-001_1381-768x515.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/One-Bala-Plaza-001_1381.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-131387\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Prefabrication of exterior panels for renovation projects can reduce occupant disruptions during construction, as shown at One Bala Plaze in Bala Cynwyd, Pennsylvania.<\/span> <em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">StoPanel Affiliate Jersey Panel<\/span><\/em><\/figcaption><\/figure>\n<p><strong>Delivering greater certainty<\/strong><\/p>\n<p>With site-built exterior walls, certainty is fleeting due to the many unknowns at play. Prefabrication changes the conversation. It produces better scheduling options, increased safety for work crews, and fewer workers on site. This, in turn, delivers the potential for cost savings and faster turnaround times.<\/p>\n<p>Consider the construction of a new hospital. The doctors, nurses, other professionals are ready to start working, and medical supplies are in stock. Patients have scheduled appointments with their providers. Delays in the ultimate completion of the hospital can push back medical treatment for patients who need it. A delayed completion scenario also represents a financial loss for the hospital, which relies on revenue from patient procedures to meet payroll and maintain operations, not to mention potential liquidated damages to the contractor if they are part of the contract. Prefabricated exterior walls as a construction system can create a more predictable completion timeline and add to the probability of the hospital opening on time.<\/p>\n<p>In a controlled manufacturing environment, fabrication crews achieve the benefit of full-time jobs making a product for their own installation teams. They are invested in developing their skills and committed to the mission of repeat business by ensuring that they generate quality results. This contributes to the creation of a higher quality product.<\/p>\n<p>Although prefabrication requires more upfront money for engineering and manufacturing, greater schedule certainty can produce savings in the long run, for example on projects that have a hard completion date. While weather is often a factor in field-built construction, wall panels prefabricated in a climate-controlled facility are not subject to weather-related work stoppages and can be delivered to the site on time, minimizing the risk of delay. Fast install time means the building enclosure is no longer on the project critical path.\u00a0 Moreover, since fewer people are needed to complete a panel assembly and solve constructability challenges, prefabrication can lower the cost of the overall project.<\/p>\n<p>Fully finished exterior wall assemblies are prefabricated at waist height, significantly reducing the risk of injuries. Crews do not perform their jobs at great heights on a high-rise commercial building as they would if they were installing product on site, so there is no need for scaffolding. Since complete wall panels are delivered to the jobsite, management of most packaging and other building material waste takes place offsite. As such, the potential for environmental contamination is greatly reduced.<\/p>\n<p>With significant safety improvements, few or no weather delays and rapid exterior wall installation, speed to market improves. Buildings can be dried in days or weeks rather than months. On average, a 5574.2-m<sup>2<\/sup> (60,000-sf) exterior can be dried-in within a month. For example, prior to installation of the exterior enclosure, the Hyatt House project in Nashville, Tennessee had been delayed by four months. The panels were manufactured offsite in advance of installation and he completed panels were quickly and efficiently installed onsite, making up a total of five months and putting the job a full month ahead of schedule.<\/p>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_131388\" aria-describedby=\"caption-attachment-131388\" style=\"width: 225px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hub-Plus-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-131388 size-medium\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hub-Plus-1-225x300.jpg\" alt=\"\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hub-Plus-1-225x300.jpg 225w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hub-Plus-1-375x500.jpg 375w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hub-Plus-1.jpg 600w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><\/a><figcaption id=\"caption-attachment-131388\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Prefabrication provides a solution for extremely tight project site constraints with limited laydown area and little room for scaffolding, such as the Hub on Campus in West Lafayette, Indiana.<\/span> <em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">StoPanel Affiliates Great Lakes Prefab &amp; Greyhawk LLC<\/span><\/em><\/figcaption><\/figure>\n<p><strong>State of the industry<\/strong><\/p>\n<p>At this time, the industry has yet to universally adopt a best practice enabling prefabricated exterior walls to be considered from the beginning of a construction project. With traditional design-bid-build construction, owners select architects who complete designs and select a general contractor. The contractor then uses drawings to put the job out to bid, contracts are awarded to multiple trades, and then construction eventually begins.<\/p>\n<p>Currently, experienced exterior wall fabricators who receive drawings from architects may recommend prefabrication as a solution for project-specific constructability challenges. If the benefits of prefabrication are sufficiently compelling, architects typically employ design-assist services provided by prefabrication specialists to adjust drawings to fit the prefabrication method.<\/p>\n<p>To fully realize the benefits of prefabricated exterior walls, design teams need to consider prefabrication early in project design. Consulting prefabrication experts at the beginning allows projects to be designed once using the most effective construction methods. Design options available with prefabrication and new ways of scheduling and installing exterior walls can be realized without identifying and justifying a need for project redesign.<\/p>\n<p>A more collaborative approach is developing as owners, contractors, and architects discover and gain experience with the substantial benefits of prefabrication. Harnessing the inspiration of architects and addressing constructability challenges can lead to flexible, innovative construction solutions, and prefabricated exterior wall manufacturers are primed to deliver on that front.<\/p>\n<p><strong>Design freedom<\/strong><\/p>\n<p>A common misconception is that architects and designers must limit themselves when it comes to their vision for a building if they choose prefabrication of the building envelope as the preferred construction method. They fear they will not have the same design flexibility to give a building their signature, a vision typically shared with the owner.<\/p>\n<p>Prefabricated wall manufacturers address this concern by providing a wide array of color, texture, and cladding material options. There are few restrictions on the exterior material or the aesthetic properties. In addition to aesthetic freedom, prefabrication can deliver lightweight, energy-efficient panels that reduce structural and foundational requirements, increasing the performance of the exterior wall while maintaining the compelling design elements creating a modern building.<\/p>\n<p><!--nextpage--><\/p>\n<p><strong>Standardization: The next frontier<\/strong><\/p>\n<p>Prefabrication as an industry began as a regional option where small operators with limited resources developed their own methodology to deliver product. Until now, this lack of standardization has hindered widespread adoption of panelization in many sectors.<\/p>\n<p>Certain manufacturers have stepped up to address this challenge. They have developed processes that can be replicated nationwide. Fully engineered, code-compliant systems help deliver a consistent, high-performance wall assembly. With such an approach, end products can be of the same quality and offer the same reliability no matter where a project is located.<\/p>\n<p>Economies of scale will continue to evolve, further improving the competitive position of prefabrication. A paradigm shift is underway in the construction industry; fast, on-schedule construction of high-quality buildings is an emerging expectation and prefabrication will help deliver.<\/p>\n<p class=\"Sidebar-Bold\"><strong>Author<\/strong><\/p>\n<p class=\"Sidebar-BodyText\"><span style=\"letter-spacing: -.15pt;\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-131389 alignleft\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Tim-Salerno-01-300x200.jpg\" alt=\"\" width=\"92\" height=\"61\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Tim-Salerno-01-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Tim-Salerno-01-500x334.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Tim-Salerno-01-768x513.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Tim-Salerno-01.jpg 800w\" sizes=\"auto, (max-width: 92px) 100vw, 92px\" \/>Tim Salerno has been in the construction industry for over 30 years, all of which have been with Sto <\/span>Corp. Tim has held several positions during his employment with Sto including more than <span style=\"letter-spacing: -.15pt;\">10 years in Sto\u2019s Strategic Accounts Department where he was responsible for overseeing several key corporate accounts throughout the United States. Tim is currently the Director, StoPanel and is responsible for various activities within the StoPanel Technology program, including acting in a business development role to grow the industrialized construction portion of Sto Corp\u2019s overall business.<\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>When prefabrication enters the construction equation, the game changes dramatically. Manufacturers can produce complete exterior wall panels in a climate-controlled facility with no weather limitations. Wall panels can then be transported to a job site where they are hoisted into place and attached to the structure without the need for exterior access. <\/p>\n","protected":false},"author":27272,"featured_media":131390,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,187,267,489,460],"tags":[66,1301,1195,1270,3394,6805],"class_list":["post-131384","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-07-00-00-thermal-and-moisture-protection","category-07-40-00-roofing-and-siding-panels","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-building-envelope","tag-design","tag-division-07","tag-panelization","tag-prefabrication","tag-redesign","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Trial to trend: The growth of prefabricated exterior walls - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"A global pandemic rocking the world economy. A widespread labor shortage causing employers of every kind to scramble for qualified workers.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Trial to trend: The growth of prefabricated exterior walls - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"A global pandemic rocking the world economy. A widespread labor shortage causing employers of every kind to scramble for qualified workers.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-03T12:37:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-08T20:49:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-F.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"797\" \/>\n\t<meta property=\"og:image:height\" content=\"398\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"brittney_cutler\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"brittney_cutler\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/\"},\"author\":{\"name\":\"brittney_cutler\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/200d4bb41f6db45d2b2a42d63843521b\"},\"headline\":\"Trial to trend: The growth of prefabricated exterior walls\",\"datePublished\":\"2021-11-03T12:37:21+00:00\",\"dateModified\":\"2021-11-08T20:49:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/\"},\"wordCount\":1507,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Hyatt-House-Nashville2-F.jpg\",\"keywords\":[\"building envelope\",\"Design\",\"Division 07\",\"Panelization\",\"prefabrication\",\"Redesign\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"07 00 00 Thermal and Moisture Protection\",\"07 40 00 Roofing and Siding Panels\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/\",\"name\":\"Trial to trend: The growth of prefabricated exterior walls - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Hyatt-House-Nashville2-F.jpg\",\"datePublished\":\"2021-11-03T12:37:21+00:00\",\"dateModified\":\"2021-11-08T20:49:20+00:00\",\"description\":\"A global pandemic rocking the world economy. A widespread labor shortage causing employers of every kind to scramble for qualified workers.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Hyatt-House-Nashville2-F.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2021\\\/11\\\/Hyatt-House-Nashville2-F.jpg\",\"width\":797,\"height\":398},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/200d4bb41f6db45d2b2a42d63843521b\",\"name\":\"brittney_cutler\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g\",\"caption\":\"brittney_cutler\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/brittney_cutler\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Trial to trend: The growth of prefabricated exterior walls - The Construction Specifier","description":"A global pandemic rocking the world economy. A widespread labor shortage causing employers of every kind to scramble for qualified workers.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/","next":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/2\/","og_locale":"en_US","og_type":"article","og_title":"Trial to trend: The growth of prefabricated exterior walls - The Construction Specifier","og_description":"A global pandemic rocking the world economy. A widespread labor shortage causing employers of every kind to scramble for qualified workers.","og_url":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/","og_site_name":"The Construction Specifier","article_published_time":"2021-11-03T12:37:21+00:00","article_modified_time":"2021-11-08T20:49:20+00:00","og_image":[{"width":797,"height":398,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-F.jpg","type":"image\/jpeg"}],"author":"brittney_cutler","twitter_card":"summary_large_image","twitter_misc":{"Written by":"brittney_cutler","Est. reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/"},"author":{"name":"brittney_cutler","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/200d4bb41f6db45d2b2a42d63843521b"},"headline":"Trial to trend: The growth of prefabricated exterior walls","datePublished":"2021-11-03T12:37:21+00:00","dateModified":"2021-11-08T20:49:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/"},"wordCount":1507,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-F.jpg","keywords":["building envelope","Design","Division 07","Panelization","prefabrication","Redesign"],"articleSection":["Features","MasterFormat","UniFormat","07 00 00 Thermal and Moisture Protection","07 40 00 Roofing and Siding Panels","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/","url":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/","name":"Trial to trend: The growth of prefabricated exterior walls - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-F.jpg","datePublished":"2021-11-03T12:37:21+00:00","dateModified":"2021-11-08T20:49:20+00:00","description":"A global pandemic rocking the world economy. A widespread labor shortage causing employers of every kind to scramble for qualified workers.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/trial-to-trend-the-growth-of-prefabricated-exterior-walls\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-F.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2021\/11\/Hyatt-House-Nashville2-F.jpg","width":797,"height":398},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/200d4bb41f6db45d2b2a42d63843521b","name":"brittney_cutler","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g","caption":"brittney_cutler"},"url":"https:\/\/www.constructionspecifier.com\/author\/brittney_cutler\/"}]}},"views":12689,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/131384","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/27272"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=131384"}],"version-history":[{"count":3,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/131384\/revisions"}],"predecessor-version":[{"id":131526,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/131384\/revisions\/131526"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/131390"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=131384"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=131384"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=131384"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}