{"id":14075,"date":"2015-12-30T09:52:27","date_gmt":"2015-12-30T14:52:27","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=14075"},"modified":"2016-12-15T11:34:47","modified_gmt":"2016-12-15T16:34:47","slug":"providing-acoustical-flexibility-getting-active-at-wartburg-college","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/","title":{"rendered":"Providing  Acoustical Flexibility: Getting \u2018active\u2019 at Wartburg College"},"content":{"rendered":"<figure id=\"attachment_14080\" aria-describedby=\"caption-attachment-14080\" style=\"width: 314px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-14080 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015.jpg\" alt=\"acoustics_1M9A3015\" width=\"314\" height=\"209\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015.jpg 480w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015-300x200.jpg 300w\" sizes=\"auto, (max-width: 314px) 100vw, 314px\" \/><\/a><figcaption id=\"caption-attachment-14080\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 8pt;\">All images courtesy Wenger<\/span><\/figcaption><\/figure>\n<p><strong>by Ron Freiheit, FASA<br \/>\n<\/strong>Superior musicians demand the best from themselves. Facilities with the proper acoustics can support musicians\u2019 artistry, helping to elevate performances to the highest level. To improve the sound quality of its chapel-auditorium, Wartburg College chose a new technological solution\u2014an active acoustics system. The school, which is located in Waverly, Iowa, premiered the system in October 2015.<\/p>\n<p>For Lee Nelson, director of the Wartburg College Choir, acoustical shortcomings meant his group had avoided the school\u2019s largest performance space\u2014Neumann Auditorium. It opened in 1960 as a chapel-auditorium, intended primarily for convocations and religious services. However, as it was designed to host spoken-word events, its acoustics were dry and unresponsive for musical performances.<\/p>\n<p>Unfortunately for the choir, a dry acoustical space is far from the reverberant, cathedral-like spaces for which most choral works, especially classical repertoire, were intended. The lack of aural feedback also hindered the choir and the director; it was difficult for musicians to hear each other, develop critical listening skills, and unite to form a cohesive sound.<\/p>\n<p>This is a common problem at many colleges and high schools: no one venue is ideal for all types of musical performances.<\/p>\n<p>\u201cIf it\u2019s good for the band, it\u2019s bad for the choir. If it\u2019s good for the choir, it\u2019s bad for the band,\u201d explains Nelson. \u201cNeumann Auditorium was good for our instrumental ensembles, not great for the orchestra, and downright terrible for the choir. We didn\u2019t perform there because it was unusable.\u201d<\/p>\n<p>\u201cWith singing or playing an instrument, so much of it is psychological. If the room\u2019s not helping you sing or project your sound, you start working harder and using poor technique,\u201d he added.<\/p>\n<p><strong>Flexible solution<br \/>\n<\/strong>The acoustics of a highly reflective, reverberant space can be tamed with traditional \u2018passive\u2019 sound-absorption solutions like acoustical panels or acoustical banners on the walls or ceiling. However, transforming a dry acoustical environment into a more reverberant space was impossible without physically altering the structure to add cubic volume. In the last 25 years, technological advances provided another solution: active acoustics.<\/p>\n<p>This type of system uses microphones mounted near the stage to capture sounds, modify them with digital signal processor computers, and play them back through a network of speakers mounted on the auditorium\u2019s walls and ceiling. In real time, performers and audience members alike perceive the aural sensation of a digitally modeled, acoustically enhanced space. With the touch of a button, the system can easily adjust for different types and even sizes of ensembles\u2014instrumental versus choral, for example\u2014along with spoken-word events.<\/p>\n<p>Active acoustics systems can also compensate for acoustical deficiencies caused by certain architectural elements in a performance space. For example, the area under a balcony often suffers from poor, or \u2018dead,\u2019 acoustics. With an active acoustics system, audience members sitting in these areas\u2014or anywhere else\u2014can enjoy optimal sound quality.<\/p>\n<p>Technological improvements have reduced the number of microphones needed. This simplifies installation and improves system stability, as fewer microphones reduce the possibility of distracting feedback. By using passive loudspeakers instead of self-powered ones, installation is also more streamlined and cost-effective.<\/p>\n<figure id=\"attachment_14083\" aria-describedby=\"caption-attachment-14083\" style=\"width: 900px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics-edit1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-14083 size-full\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics-edit1.jpg\" alt=\"acoustics edit1\" width=\"900\" height=\"320\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics-edit1.jpg 900w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics-edit1-300x107.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics-edit1-624x222.jpg 624w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/a><figcaption id=\"caption-attachment-14083\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">Challenging factors in the installation of Neumann Auditorium\u2019s active acoustic system included ceiling asbestos, non-structural side walls, electrical limitations, and noise from the ventilation system and pipe organ\u2019s air compressor.<\/span><\/figcaption><\/figure>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_14086\" aria-describedby=\"caption-attachment-14086\" style=\"width: 326px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/Transcend-DSP-Block-Diagram-Condensed.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-14086 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/Transcend-DSP-Block-Diagram-Condensed.jpg\" alt=\"Transcend DSP Block Diagram (Condensed)\" width=\"326\" height=\"144\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/Transcend-DSP-Block-Diagram-Condensed.jpg 480w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/Transcend-DSP-Block-Diagram-Condensed-300x133.jpg 300w\" sizes=\"auto, (max-width: 326px) 100vw, 326px\" \/><\/a><figcaption id=\"caption-attachment-14086\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">Digital signal processing diagram for one of three areas in Neumann Auditorium (main floor, under balcony, and balcony).<\/span><\/figcaption><\/figure>\n<p><strong>Site challenges<br \/>\n<\/strong>Before the active acoustic system could be installed, Neumann Auditorium presented a number of challenges. Background noise from the ventilation system and the pipe organ\u2019s air compressor had to be considered in system programming and fine-tuning. The facility\u2019s infrastructure was also carefully evaluated, which uncovered several complicating factors.<\/p>\n<p>First, asbestos was found in the auditorium ceiling and under-balcony ceiling. The under-balcony ceiling asbestos was entirely removed, due to its relatively small size and easy access. However, the auditorium ceiling asbestos was left intact\u2014this is because total abatement was prohibitively expensive, in part because of the 8.5-m (28-ft) ceiling. To minimize asbestos disruption, recessed speakers were not used in the auditorium ceiling. Instead, small holes were drilled in the ceiling for speaker mounts, with vacuums collecting any asbestos dislodged by the drilling.<\/p>\n<p>Second, the auditorium\u2019s side walls were discovered to be non-structural\u2014insufficiently strong to support the four mounted sub-woofer speakers required. The auditorium was designed as a room within a larger building shell\u2014a fairly common acoustical situation. To overcome this limitation, the sub-woofers were suspended from structural supports above the ceiling.<\/p>\n<p>Third, the building\u2019s electrical system needed an upgrade. The active acoustic system requires its own dedicated transformer with an isolated ground; this minimizes the potential for disrupting electrical noise. A motorized load-distribution center is also required to sequence nearly 20,000 watts of power to the signal processor and eight amplifiers with 64 channels of amplification. Sequencing helps prevent possible speaker damage from an electrical \u2018pop\u2019 or surge in the audio signal chain.<\/p>\n<p>These electrical enhancements were made as part of a general upgrade to ensure Neumann Auditorium met current electrical codes.<\/p>\n<figure id=\"attachment_14088\" aria-describedby=\"caption-attachment-14088\" style=\"width: 316px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_Wartburg-AV-Drawings-7.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-14088 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_Wartburg-AV-Drawings-7.jpg\" alt=\"acoustics_Wartburg AV Drawings-7\" width=\"316\" height=\"123\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_Wartburg-AV-Drawings-7.jpg 480w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_Wartburg-AV-Drawings-7-300x117.jpg 300w\" sizes=\"auto, (max-width: 316px) 100vw, 316px\" \/><\/a><figcaption id=\"caption-attachment-14088\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">Side-view schematic of auditorium showing locations of microphones and equipment rack (under balcony).<\/span><\/figcaption><\/figure>\n<p><strong>Installation procedure<br \/>\n<\/strong>Before the speakers could be installed, the final preparation step was temporarily removing all the auditorium seats. Doing so enabled unrestricted access for the motorized, articulated one-man lift used to reach the 8.5-m (28-ft) ceiling for wiring and mounting speakers and microphones.<\/p>\n<p>These pre-installation site preparations at Wartburg spanned approximately one month. While installing this beta-site system took longer, similar future installations would be expected to require approximately two weeks, plus another one to two weeks for tuning the system.<\/p>\n<p>Before arriving onsite, the installation company configured all system components\u2014including amplifiers and signal processor\u2014into a standard 2108-mm (83-in.) high rack and performed preliminary testing. Once at Wartburg, technicians situated this rack in a pre-selected location\u2014a storage room located under the balcony. They also pulled the thousands of feet of necessary wire before installing 84 speakers in the auditorium: four sub-woofers located near the ceiling, 37 speakers on the walls, and 43 speakers in the ceiling.<\/p>\n<p>To determine the proper number and placement of speakers, engineers utilized <a href=\"http:\/\/www.catt.se\" target=\"_blank\">CATT-Acoustic <\/a>software. By factoring in the auditorium\u2019s dimensions, along with speaker specifications and coverage patterns, the software created a model space that helped locate optimal speaker positions. The number of speakers, in turn, influenced the number of amplifiers required in the system.<\/p>\n<figure id=\"attachment_14091\" aria-describedby=\"caption-attachment-14091\" style=\"width: 324px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3117.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-14091\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3117.jpg\" alt=\"acoustics_1M9A3117\" width=\"324\" height=\"216\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3117.jpg 480w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3117-300x200.jpg 300w\" sizes=\"auto, (max-width: 324px) 100vw, 324px\" \/><\/a><figcaption id=\"caption-attachment-14091\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">For the first time, choral ensembles at Wartburg College have an acoustically supportive environment in which to perform. The active acoustic system is also a selling point to attract talented student performers, events, and concerts.<\/span><\/figcaption><\/figure>\n<p>Microphone placement was also optimized for the auditorium\u2019s unique programming needs. Unlike most performances that happen only onstage, Wartburg\u2019s Christmas concert\u2014the school\u2019s largest annual event\u2014also utilizes vocalists in the balcony. To accommodate the large orchestra at this concert, the first four rows of audience seating are removed.<\/p>\n<p>While previous active acoustic systems required up to 30 microphones, Wartburg\u2019s new-generation system only needs four\u2014two above the stage and two over the balcony for the Christmas concert. All microphones are motor-controlled and drop into position when used; this eliminates possible visual distractions during projector use in the auditorium.<\/p>\n<p><strong>Initial skepticism<br \/>\n<\/strong>Nelson had been initially skeptical this active acoustic technology could deliver on its promises until visiting a rehearsal-room installation at Wayzata High School in Plymouth, Minnesota.<\/p>\n<p>\u201cIn Wayzata\u2019s orchestra room, I expected to hear sounds coming from the speakers,\u201d explains Nelson. \u201cThat was my biggest fear\u2014it would sound amplified. I didn\u2019t want that.\u201d<\/p>\n<p>Once the Wayzata orchestra started playing with the system on, he stood as close as possible to a speaker, but could not hear it.<\/p>\n<p>\u201cI was blown away by the authentic sound,\u201d Nelson says. \u201cYou can make it as acoustically \u2018wet\u2019 or as \u2018dry\u2019 as you want. I became excited about the possibilities.\u201d<\/p>\n<p>Nelson realizes the Neumann Auditorium\u2019s situation with the Christmas concert made the goals unique.<\/p>\n<p>\u201cMost auditoriums would concentrate solely on the stage, but we truly use the entire space,\u201d he notes. \u201c[The team] rose to every challenge during the project and came up with some really creative ideas.\u201d<!--nextpage--><\/p>\n<figure id=\"attachment_14099\" aria-describedby=\"caption-attachment-14099\" style=\"width: 284px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/1a_Transcend_DC.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-14099 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/1a_Transcend_DC.jpg\" alt=\"\" width=\"284\" height=\"189\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/1a_Transcend_DC.jpg 480w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/1a_Transcend_DC-300x200.jpg 300w\" sizes=\"auto, (max-width: 284px) 100vw, 284px\" \/><\/a><figcaption id=\"caption-attachment-14099\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">This rack contains all the electronic components for the active acoustic system, including microphone inputs, signal processors, and amplifiers. The system is controlled remotely via touchscreen or other devices.<\/span><\/figcaption><\/figure>\n<p><strong>Technology at fingertips<br \/>\n<\/strong>Although the active acoustics technology at Wartburg is sophisticated, users operate the system with either a full-featured touch-screen interface in the control booth or a simplified eight-button control near the stage. The system is designed to provide easy, intuitive operation. The automatic voice-detection capability\u2014optional for each preset setting\u2014creates the proper amount of reverberation when speech or singing is detected.<\/p>\n<p>For this particular proprietary assembly, between six and eight different settings are programmed by system engineers; settings are fine-tuned to meet customer satisfaction and to maximize acoustical flexibility. Once programmed, the settings are inaccessible to users to help ensure proper system performance. When a user selects any preset setting, more than 5000 parameters are activated, including gain, equalization, input from active microphones, active acoustics parameters, and information on delays and routing for each of the 32 output channels wired to amplifiers.<\/p>\n<p><strong>New possibilities<br \/>\n<\/strong>With this active acoustic system installed, Neumann Auditorium has been transformed from a dated, problematic facility to a showplace for Wartburg College\u2019s music programs. For the first time in years, the band, orchestra, and choir can put on shows like their annual homecoming and Christmas programs together in the same venue.<\/p>\n<p>The active acoustic system also makes it possible to perform classical pieces composed for choir and orchestra, which were avoided in the past due to concerns about sound quality. Further, unlike traditional, passive acoustical treatments, this new system provides the flexibility to creatively embrace new music programming options.<\/p>\n<p>\u201cYou can create a choral\/orchestral performance setting, a choral setting for cathedral performances, and a setting for a piano concerto\u2014all within the same concert if you wish,\u201d explains Nelson. \u201cAnd all settings can be stored and recalled at any time.\u201d<\/p>\n<figure id=\"attachment_14093\" aria-describedby=\"caption-attachment-14093\" style=\"width: 305px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1j_Transcend_DC.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-14093 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1j_Transcend_DC.jpg\" alt=\"acoustics_1j_Transcend_DC\" width=\"305\" height=\"203\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1j_Transcend_DC.jpg 480w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1j_Transcend_DC-300x200.jpg 300w\" sizes=\"auto, (max-width: 305px) 100vw, 305px\" \/><\/a><figcaption id=\"caption-attachment-14093\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">Speakers were installed throughout Neumann Auditorium\u201437 on the walls, 43 in the ceiling, and four sub-woofers located near the ceiling.<\/span><\/figcaption><\/figure>\n<p>It is now possible to create a choral\/orchestral performance setting, a choral setting for cathedral performances, and a setting for a piano concerto all within the same concert, with the settings stored for later recall.<\/p>\n<p>This new system has also become a selling point in the battle to attract talented student performers, events, and concerts. Prior to the installation, Neumann Auditorium\u2019s less-than-ideal acoustics were a drag on recruiting efforts, and made it impossible to host concerts by certain artists and bands.<\/p>\n<p>\u201cWe\u2019d rarely show our prospective music majors the space,\u201d said Nelson, \u201cbecause it wasn\u2019t a good place to perform.\u201d<\/p>\n<p>After the installation, Nelson is eager to show off the system\u2019s capabilities.<\/p>\n<p>\u201cBefore, we had ensembles, festivals, and competitions that didn\u2019t look at Wartburg simply because there wasn\u2019t an appropriate performance venue,\u201d he said. \u201cOne of our biggest competitors has a great performance venue. Now, we can compete with that. It puts Wartburg in a different league.\u201d<\/p>\n<p><em>Ron Freiheit, FASA, is director of design engineering at Minnesota-based Wenger Corp., a manufacturer of specialized products for music education, performing arts, and athletic markets around the world. Freiheit is a fellow of the Acoustical Society of America and has presented at ASA meetings nationally and internationally. He is also a member of the Audio Engineering Society (AES) and the Institute of Noise Control Engineers (INCE). Freiheit received a U.S. patent for acoustic virtual environments. He led Wenger\u2019s creation of an anechoic choral recording to support auralization demonstrations; these free recordings are provided to research groups and institutions globally. Freiheit holds a bachelor\u2019s degree in electrical engineering from Southern Polytechnic Institute and completed graduate studies in acoustics at Penn State. He can be contacted at <a href=\"mailto:ron.freiheit@wengercorp.com\" target=\"_blank\">ron.freiheit@wengercorp.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Superior musicians demand the best from themselves. Facilities with the proper acoustics can support musicians\u2019 artistry, helping to elevate performances to the highest level. To improve the sound quality of its chapel-auditorium, Wartburg College chose a new technological solution\u2014an active acoustics system. <\/p>\n","protected":false},"author":5,"featured_media":14080,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,189,286,200,354,469],"tags":[2336,2332,2333,2337,1259,1215,2334,2335],"class_list":["post-14075","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-09-00-00-finishes","category-09-80-00-acoustic-treatment","category-27-00-00-communications","category-27-40-00-audio-video-communications","category-d60communications","tag-27-41-00audio-video-systems","tag-active-acoustics","tag-audiovisual","tag-d6030-audio-video-communication","tag-division-09","tag-division-27","tag-performing-arts","tag-theatres","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Providing Acoustical Flexibility: Getting \u2018active\u2019 at Wartburg College - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Providing Acoustical Flexibility: Getting \u2018active\u2019 at Wartburg College - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Superior musicians demand the best from themselves. Facilities with the proper acoustics can support musicians\u2019 artistry, helping to elevate performances to the highest level. To improve the sound quality of its chapel-auditorium, Wartburg College chose a new technological solution\u2014an active acoustics system.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2015-12-30T14:52:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-12-15T16:34:47+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"480\" \/>\n\t<meta property=\"og:image:height\" content=\"320\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katie Daniel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katie Daniel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/\"},\"author\":{\"name\":\"Katie Daniel\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/34e59e3f0bf081d4b975ae9b2c1764f3\"},\"headline\":\"Providing Acoustical Flexibility: Getting \u2018active\u2019 at Wartburg College\",\"datePublished\":\"2015-12-30T14:52:27+00:00\",\"dateModified\":\"2016-12-15T16:34:47+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/\"},\"wordCount\":2062,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/acoustics_1M9A3015.jpg\",\"keywords\":[\"27 41 00\u2212Audio-Video Systems\",\"Active Acoustics\",\"Audiovisual\",\"D6030\u2013Audio-Video Communication\",\"Division 09\",\"Division 27\",\"Performing Arts\",\"Theatres\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"09 00 00 Finishes\",\"09 80 00 Acoustic Treatment\",\"27 00 00 Communications\",\"27 40 00 Audio-Video Communications\",\"D60\u2212Communications\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/\",\"name\":\"Providing Acoustical Flexibility: Getting \u2018active\u2019 at Wartburg College - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/acoustics_1M9A3015.jpg\",\"datePublished\":\"2015-12-30T14:52:27+00:00\",\"dateModified\":\"2016-12-15T16:34:47+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/providing-acoustical-flexibility-getting-active-at-wartburg-college\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/acoustics_1M9A3015.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/12\\\/acoustics_1M9A3015.jpg\",\"width\":480,\"height\":320},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/34e59e3f0bf081d4b975ae9b2c1764f3\",\"name\":\"Katie Daniel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g\",\"caption\":\"Katie Daniel\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/katie-daniel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Providing Acoustical Flexibility: Getting \u2018active\u2019 at Wartburg College - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/","next":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/2\/","og_locale":"en_US","og_type":"article","og_title":"Providing Acoustical Flexibility: Getting \u2018active\u2019 at Wartburg College - The Construction Specifier","og_description":"Superior musicians demand the best from themselves. Facilities with the proper acoustics can support musicians\u2019 artistry, helping to elevate performances to the highest level. To improve the sound quality of its chapel-auditorium, Wartburg College chose a new technological solution\u2014an active acoustics system.","og_url":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/","og_site_name":"The Construction Specifier","article_published_time":"2015-12-30T14:52:27+00:00","article_modified_time":"2016-12-15T16:34:47+00:00","og_image":[{"width":480,"height":320,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015.jpg","type":"image\/jpeg"}],"author":"Katie Daniel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Katie Daniel","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/"},"author":{"name":"Katie Daniel","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/34e59e3f0bf081d4b975ae9b2c1764f3"},"headline":"Providing Acoustical Flexibility: Getting \u2018active\u2019 at Wartburg College","datePublished":"2015-12-30T14:52:27+00:00","dateModified":"2016-12-15T16:34:47+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/"},"wordCount":2062,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015.jpg","keywords":["27 41 00\u2212Audio-Video Systems","Active Acoustics","Audiovisual","D6030\u2013Audio-Video Communication","Division 09","Division 27","Performing Arts","Theatres"],"articleSection":["Features","MasterFormat","UniFormat","09 00 00 Finishes","09 80 00 Acoustic Treatment","27 00 00 Communications","27 40 00 Audio-Video Communications","D60\u2212Communications"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/","url":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/","name":"Providing Acoustical Flexibility: Getting \u2018active\u2019 at Wartburg College - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015.jpg","datePublished":"2015-12-30T14:52:27+00:00","dateModified":"2016-12-15T16:34:47+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/providing-acoustical-flexibility-getting-active-at-wartburg-college\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/12\/acoustics_1M9A3015.jpg","width":480,"height":320},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/34e59e3f0bf081d4b975ae9b2c1764f3","name":"Katie Daniel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g","caption":"Katie Daniel"},"url":"https:\/\/www.constructionspecifier.com\/author\/katie-daniel\/"}]}},"views":12849,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/14075","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=14075"}],"version-history":[{"count":15,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/14075\/revisions"}],"predecessor-version":[{"id":23030,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/14075\/revisions\/23030"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/14080"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=14075"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=14075"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=14075"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}