{"id":144622,"date":"2022-04-11T18:13:08","date_gmt":"2022-04-11T22:13:08","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=144622"},"modified":"2022-04-11T18:13:08","modified_gmt":"2022-04-11T22:13:08","slug":"larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/","title":{"rendered":"Larkin Street Substation addition one of the first to achieve net-zero rating"},"content":{"rendered":"<figure id=\"attachment_144623\" aria-describedby=\"caption-attachment-144623\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-144623 size-medium\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F-300x150.jpg\" alt=\"\" width=\"300\" height=\"150\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F-300x150.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F.jpg 400w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-144623\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Construction has wrapped on the Larkin Street Substation addition in San Francisco, California. The net-zero energy (NZE) targeted project is designed to meet the practical needs of the utility building while enhancing the surrounding community.<\/span> <em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photo courtesy Mikiko Kikuyama <\/span><\/em><\/figcaption><\/figure>\n<p>Construction has wrapped on the Larkin Street Substation addition in San Francisco, California. The net-zero energy (NZE) targeted project is designed to meet the practical needs of the utility building while enhancing the surrounding community.<\/p>\n<p>The steel frame concrete structure by TEF Design is a modern addition to the existing historic 1962 substation building designed by Pacific Gas and Electric (PG&amp;E) to supply power to the northeastern part of the city.<\/p>\n<p>The constrained property and need to accommodate crane and equipment lift access prescribed the expansion\u2019s perpendicular orientation to the existing substation. The structure features street-facing fa\u00e7ades which integrate three types of glass fiber reinforced polymer (GFRP) panels\u2014sloped, perforated, and ribbed\u2014to form a surface that contradicts its materiality.<\/p>\n<p>Sloped panels embedded with lighting fixtures expand across the building at night, expressing the city\u2019s electrical power grid. The west-facing green wall, planted in a geometric pattern which echoes the faceted concrete walls, provides biophilic relief to the urban block while asserting its contribution to green values. A fine-grained metal mesh provides a transition between the existing structure and its new addition and is also used to bookend the fa\u00e7ade.<\/p>\n<p>On top, 60 kilowatt (kW) solar panel arrays offset the building\u2019s energy consumption. Large vents at the base of the building exploit the city\u2019s cool temperatures through natural ventilation to help eliminate the need for artificial cooling and reduce the building\u2019s energy load by nearly 40 percent. Inside, supplemental fans, triggered only at high temperatures, help to cool the building only when needed.<\/p>\n<p>The PG&amp;E Larkin Substation addition is one of the first targeted net-zero electrical switchgear utility buildings to get a rating from the International Living Future Institute\u2019s (ILFI) Living Building Challenge. The design team collaborated with ILFI to establish a rating system for registering the unprecedented building type.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The net-zero energy (NZE) targeted project is designed to meet the practical needs of the utility building while enhancing the surrounding community.<\/p>\n","protected":false},"author":27272,"featured_media":144623,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[4204,1337,3075,45,3015,170,7047],"class_list":["post-144622","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-building","tag-construction","tag-expansion","tag-lighting","tag-nze","tag-panels","tag-substation","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Larkin Street Substation addition one of the first to achieve net-zero rating - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"The NZE targeted project is designed to meet the practical needs of the utility building while enhancing the surrounding community.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Larkin Street Substation addition one of the first to achieve net-zero rating - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"The NZE targeted project is designed to meet the practical needs of the utility building while enhancing the surrounding community.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2022-04-11T22:13:08+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"brittney_cutler\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"brittney_cutler\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/\"},\"author\":{\"name\":\"brittney_cutler\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/200d4bb41f6db45d2b2a42d63843521b\"},\"headline\":\"Larkin Street Substation addition one of the first to achieve net-zero rating\",\"datePublished\":\"2022-04-11T22:13:08+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/\"},\"wordCount\":367,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/BC_LarkinExpansion-F.jpg\",\"keywords\":[\"building\",\"Construction\",\"Expansion\",\"lighting\",\"NZE\",\"panels\",\"substation\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/\",\"name\":\"Larkin Street Substation addition one of the first to achieve net-zero rating - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/BC_LarkinExpansion-F.jpg\",\"datePublished\":\"2022-04-11T22:13:08+00:00\",\"description\":\"The NZE targeted project is designed to meet the practical needs of the utility building while enhancing the surrounding community.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/BC_LarkinExpansion-F.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/04\\\/BC_LarkinExpansion-F.jpg\",\"width\":400,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Larkin Street Substation addition one of the first to achieve net-zero rating\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/200d4bb41f6db45d2b2a42d63843521b\",\"name\":\"brittney_cutler\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g\",\"caption\":\"brittney_cutler\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/brittney_cutler\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Larkin Street Substation addition one of the first to achieve net-zero rating - The Construction Specifier","description":"The NZE targeted project is designed to meet the practical needs of the utility building while enhancing the surrounding community.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/","og_locale":"en_US","og_type":"article","og_title":"Larkin Street Substation addition one of the first to achieve net-zero rating - The Construction Specifier","og_description":"The NZE targeted project is designed to meet the practical needs of the utility building while enhancing the surrounding community.","og_url":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/","og_site_name":"The Construction Specifier","article_published_time":"2022-04-11T22:13:08+00:00","og_image":[{"width":400,"height":200,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F.jpg","type":"image\/jpeg"}],"author":"brittney_cutler","twitter_card":"summary_large_image","twitter_misc":{"Written by":"brittney_cutler","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/"},"author":{"name":"brittney_cutler","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/200d4bb41f6db45d2b2a42d63843521b"},"headline":"Larkin Street Substation addition one of the first to achieve net-zero rating","datePublished":"2022-04-11T22:13:08+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/"},"wordCount":367,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F.jpg","keywords":["building","Construction","Expansion","lighting","NZE","panels","substation"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/","url":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/","name":"Larkin Street Substation addition one of the first to achieve net-zero rating - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F.jpg","datePublished":"2022-04-11T22:13:08+00:00","description":"The NZE targeted project is designed to meet the practical needs of the utility building while enhancing the surrounding community.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/04\/BC_LarkinExpansion-F.jpg","width":400,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/larkin-street-substation-addition-one-of-the-first-to-achieve-net-zero-rating\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Larkin Street Substation addition one of the first to achieve net-zero rating"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/200d4bb41f6db45d2b2a42d63843521b","name":"brittney_cutler","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/65c3c8231291f7b7ce4f3311dec51b8bea9b7dea87d774988c9699e2f350e07b?s=96&d=mm&r=g","caption":"brittney_cutler"},"url":"https:\/\/www.constructionspecifier.com\/author\/brittney_cutler\/"}]}},"views":4833,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/144622","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/27272"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=144622"}],"version-history":[{"count":1,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/144622\/revisions"}],"predecessor-version":[{"id":144624,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/144622\/revisions\/144624"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/144623"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=144622"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=144622"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=144622"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}