{"id":15443,"date":"2012-11-01T09:39:45","date_gmt":"2012-11-01T13:39:45","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=15443"},"modified":"2016-04-15T15:19:24","modified_gmt":"2016-04-15T19:19:24","slug":"establishing-critical-barriers-with-insulated-metal-panels","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/","title":{"rendered":"Establishing critical barriers with insulated metal panels"},"content":{"rendered":"<figure id=\"attachment_15445\" aria-describedby=\"caption-attachment-15445\" style=\"width: 798px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium.jpg\" rel=\"attachment wp-att-15445\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-15445 size-full\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615.jpg\" alt=\"All images courtesy Centria\" width=\"798\" height=\"255\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615.jpg 798w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615-300x96.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615-768x245.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615-624x199.jpg 624w\" sizes=\"auto, (max-width: 798px) 100vw, 798px\" \/><\/a><figcaption id=\"caption-attachment-15445\" class=\"wp-caption-text\">All images courtesy Centria<\/figcaption><\/figure>\n<p>&nbsp;<\/p>\n<p>Providing adequate rainwater management and control for air, vapor, and heat flow through the building enclosure is critical to long-term performance and durability. In contemporary wall assemblies with layered materials, the complexity of coordinating these various demands can be overwhelming.<\/p>\n<p>Historical developments of building enclosure design and construction evolved through the centuries from monolithic, load-bearing mass walls through transitional masonry to today\u2019s modern building enclosure systems. Thanks to technological advances over the last several decades, emerging construction materials, methods, and techniques have led to thinner, lighter, and more complex exterior walls consisting of multiple material layers.<\/p>\n<p>Contemporary building enclosures perform a multi-faceted role in managing what is typically referred to as \u2018environmental loads.\u2019 In addition to transferring dead and live loads, the enclosure must manage moisture in both liquid and vapor states\u2014transported through air leakage and diffusion\u2014as well as the flow of thermal energy. In design practice, these elements are controlled by using water, air, vapor, and thermal barriers.<\/p>\n<p>Each barrier function may be achieved with a dedicated material, but one can serve more than a single prescribed function. In one example, fiberglass-batt insulation functions as a thermal barrier in resisting the transfer of thermal energy across the wall assembly\u2014thus providing the thermal barrier. Above-grade waterproofing membrane, on the other hand, often serves multiple functions and can be used as drainage plane or vapor barrier and can comprise an integral part of the air barrier system (provided certain physical properties are met).<\/p>\n<p>Selecting the appropriate materials and their arrangement within the wall assembly may not always be a straightforward process. Nevertheless, it is essential in preventing moisture-related performance problems. A case in point being the use of low-permeable interior wall finishes in hotels in southern climates during the 1990s, which led to widespread moisture-related problems in exterior walls.<\/p>\n<figure id=\"attachment_15447\" aria-describedby=\"caption-attachment-15447\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Illustration.jpg\" rel=\"attachment wp-att-15447\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-15447\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Illustration-300x178.jpg\" alt=\"A proprietary insulated metal panel (IMP) assembly, paired with a metal-framed backup wall. IMP walls combine metal skins with foam insulation for optimal thermal, air, moisture, and vapor barriers in a single panelized component, providing quick and easy installation for all climates.\" width=\"300\" height=\"178\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Illustration-300x178.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Illustration-768x456.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Illustration-624x371.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Illustration.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-15447\" class=\"wp-caption-text\"><span style=\"font-size: 10pt;\">A proprietary insulated metal panel (IMP) assembly, paired with a metal-framed backup wall. IMP walls combine metal skins with foam insulation for optimal thermal, air, moisture, and vapor barriers in a single panelized component, providing quick and easy installation for all climates.<\/span><\/figcaption><\/figure>\n<p>Another example during the 1990s was the use of substandard exterior sheathing materials and improper detailing and installation of the waterproofing layer. This led to moisture-related failures in exterior insulation and finish systems (EIFS) in coastal regions of Canada and warm coastal climates in the United States. Such failures brought about extreme hardship to the owners, insurance companies, and financial institutions involved.<\/p>\n<p><b>Avoiding failures<\/b><br \/>\nThe examples of past failures emphasize two critical aspects in ensuring properly functioning building enclosures:<\/p>\n<ul>\n<li>During project design, proper material selection, sequencing, and integration (<i>i.e.<\/i> detailing) with adjacent materials in the assembly must be implemented.<\/li>\n<li>During construction, proper field installation is crucial.<\/li>\n<\/ul>\n<p>Building enclosures consisting of layered materials\u2014such as board stock insulation, rubberized asphalt membrane, or fluid-applied waterproofing\/air barrier and exterior-grade sheathing and porous claddings\u2014require a certain level of building science insight to ensure moisture does not condense and accumulate within the assembly.<\/p>\n<p>Specifying waterproofing\/air barrier products with an adequate range of water vapor permeance often necessitates use of advanced engineering analysis to verify the assembly\u2019s hygrothermal response. The general rule of thumb is to locate the vapor barrier toward the interior side of the insulation layer in cold climates and toward the exterior side in warm and humid regions.<\/p>\n<p>In moderate climate zones (where the net water vapor transport across the building enclosure is more balanced), a vapor barrier with low permeance may not be needed. Even with design requirements met on paper, proper field installation is critical to ensure the building enclosure performs well for years to come. With multiple trades involved in construction of a multi-layered wall system, the opportunity exists for mistakes and deficient installation.<\/p>\n<p>Using insulated composite metal panels (IMPs) in building enclosures can simplify the design of the barriers and their installation\u2014since all barriers are integrated into a single unitized component with flashings and sealants to provide a continuous waterproofing, air, vapor, and thermal barrier. From the installation standpoint, using IMPs eliminates the need for multiple trades as the systems are erected by a single trade.<\/p>\n<p>Two questions arise in relation to weather protection, as well as controlling the flow of air, water vapor, and thermal energy:<\/p>\n<ol>\n<li>What regulatory requirements apply?<\/li>\n<li>How do building enclosures with IMPs meet them?<\/li>\n<\/ol>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_15449\" aria-describedby=\"caption-attachment-15449\" style=\"width: 270px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Western-MD.jpg\" rel=\"attachment wp-att-15449\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-15449\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Western-MD-209x300.jpg\" alt=\"The Western Maryland Regional Medical Center (Cumberland) features more than 13,935 m2 (150,000 sf) of IMPs. Compared to systems with multiple barrier components, such assemblies can simplify the wall design when arranging and installing the water, air, vapor, and thermal performance barriers.\" width=\"270\" height=\"388\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Western-MD-209x300.jpg 209w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_Western-MD.jpg 558w\" sizes=\"auto, (max-width: 270px) 100vw, 270px\" \/><\/a><figcaption id=\"caption-attachment-15449\" class=\"wp-caption-text\"><span style=\"font-size: 10pt;\">The Western Maryland Regional Medical Center (Cumberland) features more than 13,935 m<sup>2<\/sup> (150,000 sf) of IMPs. Compared to systems with multiple barrier components, such assemblies can simplify the wall design when arranging and installing the water, air, vapor, and thermal performance barriers.<\/span><\/figcaption><\/figure>\n<p><b>Impact of the codes<\/b><br \/>\nMost new commercial buildings must be designed and constructed to comply with regulatory requirements in model codes. From the standpoint of environmental load control, the building enclosure must meet demands related to weather protection, energy efficiency, air leakage, and vapor diffusion control.<\/p>\n<p><i>Weather protection<\/i><br \/>\nWeather protection (more specifically, defense against rainwater penetration) is critical to a properly functioning enclosure. Performance requirements are listed in Section 1403 of the 2012\/2009 <i>International Building Code <\/i>(<i>IBC<\/i>). The provisions in this section require exterior walls to be designed and constructed to:<\/p>\n<ul>\n<li>prevent water accumulation within the assembly;<\/li>\n<li>provide a means for draining water through a water-resistive barrier (WRB) and flashings; and<\/li>\n<li>offer protection against condensation.<\/li>\n<\/ul>\n<p>The provisions for vapor flow control listed in <i>IBC<\/i> Section 1405.3 are highlighted in subsequent sections. The code provides exceptions to the requirements for means of drainage with WRBs in Section 1404.2 and flashings in Section 1405.4. Compliance to the exceptions can be met when the exterior wall assembly resists water penetration in accordance with ASTM E331, <i>Standard Test Method for Water Penetration of Exterior <\/i><i>Windows, Skylights, Doors, and Curtain Walls by Uniform <\/i><i>Static Air Pressure Difference<\/i>.<\/p>\n<p><i>Energy efficiency<\/i><br \/>\nEnergy performance requirements for new commercial buildings may be found in the model code, such as the <i>International Energy Conservation Code <\/i>(<i>IECC<\/i>) referenced in Chapter 13 of <i>IBC<\/i>. <i>IECC <\/i>establishes minimum levels for energy efficiency using prescriptive and performance-based provisions.<\/p>\n<p>A project need only comply with one method. The prescriptive approach is the easiest to apply and the most commonly used. The requirements for opaque thermal enclosure components are provided in a tabulated format and listed separately for each component and climate zone in terms of a maximum U-factor or a minimum R-value. The latter becomes applicable in cases when insulation materials are used in the assembly, such as board stock insulation in combination with cavity insulation. In instances when the insulation material is an integral part of a building enclosure component, the use of maximum U-factor criteria for the assembly is the correct approach in representing energy efficiency for the product. In Section C402 of the 2012\/2009 <i>IECC<\/i>, the code is clear\u2014the maximum U-factor can be used in lieu of the minimum R-value criteria:<\/p>\n<p>C402.1.2 U-factor alternative. An assembly with a U-factor, C-factor, or F-factor equal to or less than specified in Table C402.1.2 shall be permitted as an alternative to the R-value in Table C402.2.<\/p>\n<p><i>Air leakage<\/i><br \/>\nThe control of unintended airflow is of primary concern within an energy efficiency context. Air leakage typically occurs through any cracks, gaps, discontinuities between adjacent materials, and openings. It can have a negative impact on energy efficiency, as well as the envelope\u2019s long-term moisture performance and durability.<\/p>\n<p>Some consequences stemming from air leakage include degradation of materials resulting from interstitial condensation and moisture accumulation, thermal discomfort, and increased energy use. An understanding of air leakage\u2019s effect on the building\u2019s energy efficiency is growing in the design\/construction community. The codes followed suit and, during the last two cycles, <i>IECC<\/i> expanded its air barrier requirements. The current 2012 code defines the air barrier, along with construction requirements, compliance options, and applicable testing.<\/p>\n<p><i>Water vapor diffusion control<\/i><br \/>\nAs indicated, controlling air leakage is critical in achieving an optimal building enclosure. Unlike air leakage, which can transport a greater quantity of moisture, the transfer of water vapor via diffusion occurs through the material surface and across its porous matrix. The property that relates the quantity of water vapor diffusing through the material in question is called \u2018permeance.\u2019 In Section 1405, <i>IBC <\/i>list three types of vapor retarders:<\/p>\n<ul>\n<li>Class I: permeance below 0.1 perm;<\/li>\n<li>Class II: permeance between 0.1 and 1.0 perm; and<\/li>\n<li>Class III: permeance exceeding 1.0 perm.<\/li>\n<\/ul>\n<p>Additional language in this section requires Class I or II vapor retarders on the interior side of frame walls in Zones 5, 6, 7, 8, and Marine 4\u2014states positioned north of the Mason-Dixon Line.<\/p>\n<p><b>Achieving barriers with IMPs<\/b><br \/>\nInsulated composite metal panels are typically manufactured with metal facers on both sides of a closed-cell polyisocyanurate (polyiso) or polyurethane core. The formed facer edges connect the panels structurally and achieve panel-to-panel seals, leading to performance barrier continuity without thermal conductivity through the panel thickness.<\/p>\n<p>All the constituent materials of the IMPs are \u2018tight,\u2019 relative to moisture absorption and vapor diffusion. The metal is impervious to vapor diffusion, and the other components\u2014including a closed-cell foam core and non-curing butyl sealant\u2014have a permeance of less than 0.3 perms, as per ASTM E96-95, <i>Standard Test Methods for Water Vapor Transmission of Materials<\/i>. The moisture absorption of the foam is a 0.3 percent weight change when tested in accordance with ASTM C209-98, <i>Standard Test Methods for Cellulosic Fiber Insulating Board<\/i>.<\/p>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_15450\" aria-describedby=\"caption-attachment-15450\" style=\"width: 800px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_MetalWrap_BeforeAfter.jpg\" rel=\"attachment wp-att-15450\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-15450\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_MetalWrap_BeforeAfter.jpg\" alt=\"Insulated composite backup panels provide a high-performance IMP option for use with metal, brick, terra cotta, or mixed-medium building envelopes. Beneath the brick exterior of the Cardiovascular Consultants Medical Office Building (Cape Girardeau, Missouri) is more than 929 m2 (10,000 sf) of panels, featuring an air and vapor barrier, insulation, and a metal drain plane.\" width=\"800\" height=\"256\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_MetalWrap_BeforeAfter.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_MetalWrap_BeforeAfter-300x96.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_MetalWrap_BeforeAfter-768x246.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_MetalWrap_BeforeAfter-624x200.jpg 624w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-15450\" class=\"wp-caption-text\"><span style=\"font-size: 10pt;\">Insulated composite backup panels provide a high-performance IMP option for use with metal, brick, terra cotta, or mixed-medium building envelopes. Beneath the brick exterior of the Cardiovascular Consultants Medical Office Building (Cape Girardeau, Missouri) is more than 929 m<sup>2<\/sup>\u00a0(10,000 sf) of panels, featuring an air and vapor barrier, insulation, and a metal drain plane.<\/span><\/figcaption><\/figure>\n<p>When detailed and installed with a seal plane on the liner side, the product houses the air, water, and vapor seal on the liner side, with the thermal barrier to the exterior. In cold climates, the vapor barrier is on the wall\u2019s liner, or heated side, and easily resists the inside-to-outside vapor drive. This liner-side seal detail also functions in hot and humid climates\u2014where the vapor drive is reversed. Should condensation occur, it would take place on the exterior of the vapor barrier (liner) and drain to the outside. Since the foam exposed within the joint is closed-cell, it is resistant to holding water or vapor diffusion. Hence, the same product installation details can be used in all climates without a concern for moisture entrapment within the wall.<\/p>\n<p>IMP assemblies can achieve high performance levels for air infiltration and water penetration when they are tested in accordance with:<\/p>\n<ul>\n<li>ASTM E283, <i>Standard Test Method for Determining Rate of Air Leakage Through Exterior Windows, Curtain Walls, and Doors Under Specified Pressure Differences Across the Specimen;<\/i><\/li>\n<li>ASTM E331; and<\/li>\n<li>American Architectural Manufacturers Association (AAMA) 501.1, <i>Standard Test Method for Water Penetration of Windows, Curtain Walls, and Doors Using Dynamic Pressure<\/i>.<\/li>\n<\/ul>\n<p>Air infiltration levels that are less than 0.15 L\/s\/m<sup>2<\/sup> at 75 Pa (0.03 cfm\/sf at 6.24 psf) can be achieved, as well as passing a static or dynamic water test at 718 Pa (15 psf).<\/p>\n<figure id=\"attachment_15455\" aria-describedby=\"caption-attachment-15455\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_NSSI_Peterson.jpg\" rel=\"attachment wp-att-15455\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-15455\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_NSSI_Peterson-300x200.jpg\" alt=\"The new National Security Space Institute (NSSI) at Colorado\u2019s Peterson Air Force Base makes use of insulated metal panels. These particular products include a factory foamed-in-place core to minimize insulation gaps, thermal break between panel face and liner to minimize thermal conductivity, and pressure-equalized horizontal joinery.\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_NSSI_Peterson-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_NSSI_Peterson-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_NSSI_Peterson-624x416.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2012\/02\/envelope_NSSI_Peterson.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-15455\" class=\"wp-caption-text\"><span style=\"font-size: 10pt;\">The new National Security Space Institute (NSSI) at Colorado\u2019s Peterson Air Force Base makes use of insulated metal panels. These particular products include a factory foamed-in-place core to minimize insulation gaps, thermal break between panel face and liner to minimize thermal conductivity, and pressure-equalized horizontal joinery.<\/span><\/figcaption><\/figure>\n<p>IMP products are typically tested in accordance with ASTM C1363,<i> Standard Test Method for Thermal Performance of Building Materials and Envelope Assemblies by Means of a Hot Box Apparatus<\/i>, as per the assembly U-factors listed in Section A9.3.2 of American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE) 90.1-2010,<i> Energy Standard for Buildings Except Low-rise Residential Buildings<\/i>. This documents the efficiency of the panel-side joint. Subsequent modeling can be done to depict actual job conditions or assemblies as required.<\/p>\n<p><b>Conclusion<\/b><br \/>\nInsulated metal panels can achieve the high performance standards for water, air, vapor, and thermal barriers as required in codes today. Due to the non-absorbing properties of the panel materials, the same details using liner-side seals can be used in any climate, thus facilitating the complexities involved with multi-component wall systems, barrier selection, and location within the assembly.<\/p>\n<p><em>Keith Boyer, PE, is the director of architectural wall technology for Centria. He is involved with long-term product development for architectural wall products and participates with industry councils and professional organizations. Boyer has been with the company for more than 36 years. Extensively involved in the industry, he has served on several ASTM committees for standing-seam metal roofs, has recently been involved with an American Architectural Manufacturers Association (AAMA) task force to develop testing protocols for rainscreen wall systems, and holds numerous patents on wall and roof systems. Boyer can be reached at <a href=\"mailto:kboyer@centria.com\" target=\"_blank\">kboyer@centria.com<\/a>.<\/em><\/p>\n<p><em>Marcin Pazera, PhD, is a senior research and development associate with Centria. He has worked as a consultant on building science issues related to building enclosure design, performance, and durability. Pazera is a member of the editorial board for the Journal of Building Physics and has authored more than 30 publications in peer-reviewed journals, industry publications, and conference proceedings. He is a member of several committees in ASTM International, and chairs the Western Pennsylvania Building Envelope Council (BEC) Chapter. Pazera can be contacted via e-mail <\/em><br \/>\n<em> at <a href=\"mailto:mpazera@centria.com\" target=\"_blank\">mpazera@centria.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Providing adequate rainwater management and control for air, vapor, and heat flow through the building enclosure is critical to long-term performance and durability. In contemporary wall assemblies with layered materials, the complexity of coordinating these various demands can be overwhelming.<\/p>\n","protected":false},"author":10,"featured_media":15445,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,6,179,449,187,267,489,460],"tags":[66,1195,665,2393,2567,2566,831],"class_list":["post-15443","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-general","category-masterformat","category-uniformat","category-07-00-00-thermal-and-moisture-protection","category-07-40-00-roofing-and-siding-panels","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-building-envelope","tag-division-07","tag-iecc","tag-insulated-metal-panels","tag-keith-boyer","tag-marcin-pazera","tag-water-resistant-barrier","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Establishing critical barriers with insulated metal panels - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Establishing critical barriers with insulated metal panels - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Providing adequate rainwater management and control for air, vapor, and heat flow through the building enclosure is critical to long-term performance and durability. In contemporary wall assemblies with layered materials, the complexity of coordinating these various demands can be overwhelming.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2012-11-01T13:39:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-04-15T19:19:24+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"798\" \/>\n\t<meta property=\"og:image:height\" content=\"255\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Catherine Howlett\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Catherine Howlett\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/\"},\"author\":{\"name\":\"Catherine Howlett\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/26c86b4baf08f39a8684e1d14a8bc049\"},\"headline\":\"Establishing critical barriers with insulated metal panels\",\"datePublished\":\"2012-11-01T13:39:45+00:00\",\"dateModified\":\"2016-04-15T19:19:24+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/\"},\"wordCount\":2230,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/02\\\/envelope_UnivPhoenixStadium-e1456238538615.jpg\",\"keywords\":[\"building envelope\",\"Division 07\",\"IECC\",\"Insulated Metal Panels\",\"Keith Boyer\",\"Marcin Pazera\",\"Water-resistant barrier\"],\"articleSection\":[\"Features\",\"General\",\"MasterFormat\",\"UniFormat\",\"07 00 00 Thermal and Moisture Protection\",\"07 40 00 Roofing and Siding Panels\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/\",\"name\":\"Establishing critical barriers with insulated metal panels - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/02\\\/envelope_UnivPhoenixStadium-e1456238538615.jpg\",\"datePublished\":\"2012-11-01T13:39:45+00:00\",\"dateModified\":\"2016-04-15T19:19:24+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/establishing-critical-barriers-with-insulated-metal-panels\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/02\\\/envelope_UnivPhoenixStadium-e1456238538615.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/02\\\/envelope_UnivPhoenixStadium-e1456238538615.jpg\",\"width\":798,\"height\":255,\"caption\":\"All images courtesy Centria\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/26c86b4baf08f39a8684e1d14a8bc049\",\"name\":\"Catherine Howlett\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/83438974c404fdb0228df73d0965bdf6df5e5a153bd0283c7d2375da180a1582?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/83438974c404fdb0228df73d0965bdf6df5e5a153bd0283c7d2375da180a1582?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/83438974c404fdb0228df73d0965bdf6df5e5a153bd0283c7d2375da180a1582?s=96&d=mm&r=g\",\"caption\":\"Catherine Howlett\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/catherine-howlett\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Establishing critical barriers with insulated metal panels - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/","next":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/2\/","og_locale":"en_US","og_type":"article","og_title":"Establishing critical barriers with insulated metal panels - The Construction Specifier","og_description":"Providing adequate rainwater management and control for air, vapor, and heat flow through the building enclosure is critical to long-term performance and durability. In contemporary wall assemblies with layered materials, the complexity of coordinating these various demands can be overwhelming.","og_url":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/","og_site_name":"The Construction Specifier","article_published_time":"2012-11-01T13:39:45+00:00","article_modified_time":"2016-04-15T19:19:24+00:00","og_image":[{"width":798,"height":255,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615.jpg","type":"image\/jpeg"}],"author":"Catherine Howlett","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Catherine Howlett","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/"},"author":{"name":"Catherine Howlett","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/26c86b4baf08f39a8684e1d14a8bc049"},"headline":"Establishing critical barriers with insulated metal panels","datePublished":"2012-11-01T13:39:45+00:00","dateModified":"2016-04-15T19:19:24+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/"},"wordCount":2230,"commentCount":1,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615.jpg","keywords":["building envelope","Division 07","IECC","Insulated Metal Panels","Keith Boyer","Marcin Pazera","Water-resistant barrier"],"articleSection":["Features","General","MasterFormat","UniFormat","07 00 00 Thermal and Moisture Protection","07 40 00 Roofing and Siding Panels","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/","url":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/","name":"Establishing critical barriers with insulated metal panels - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615.jpg","datePublished":"2012-11-01T13:39:45+00:00","dateModified":"2016-04-15T19:19:24+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/establishing-critical-barriers-with-insulated-metal-panels\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/02\/envelope_UnivPhoenixStadium-e1456238538615.jpg","width":798,"height":255,"caption":"All images courtesy Centria"},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/26c86b4baf08f39a8684e1d14a8bc049","name":"Catherine Howlett","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/83438974c404fdb0228df73d0965bdf6df5e5a153bd0283c7d2375da180a1582?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/83438974c404fdb0228df73d0965bdf6df5e5a153bd0283c7d2375da180a1582?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/83438974c404fdb0228df73d0965bdf6df5e5a153bd0283c7d2375da180a1582?s=96&d=mm&r=g","caption":"Catherine Howlett"},"url":"https:\/\/www.constructionspecifier.com\/author\/catherine-howlett\/"}]}},"views":21122,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/15443","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/10"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=15443"}],"version-history":[{"count":7,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/15443\/revisions"}],"predecessor-version":[{"id":15456,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/15443\/revisions\/15456"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/15445"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=15443"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=15443"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=15443"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}