{"id":1579,"date":"2014-04-07T08:30:50","date_gmt":"2014-04-07T12:30:50","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=1579"},"modified":"2017-01-17T14:30:20","modified_gmt":"2017-01-17T19:30:20","slug":"weep-now-or-weep-later-of-ropes-and-tubes","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/","title":{"rendered":"Weep Now or Weep Later: Of ropes and tubes"},"content":{"rendered":"<p><strong>by<\/strong><b> John H. Koester<br \/>\n<\/b>One of the first commonly employed weep details was the sash cord or \u2018rope\u2019 weep. In some cases, this detail was expanded with sections of the sash cord laid in the cavity and then extended through the wall, usually at a head joint. In other cases, the sash cord was fastened vertically up the backside of the cavity. In yet other instances, it would be pulled out of the wall, leaving a hole through the head joint or bed joint of mortar.<\/p>\n<p>How and when these sash cord sections were placed or embedded in the bed joint of mortar impacted whether they had any weeping capacity. If they were placed on the flashing and the bed joint of mortar was spread on top, the finished detail looked like Figure A. However, if the bed joint of mortar was spread and the sash cord section was laid or embedded into it, the finished detail looked like Figure B. The theory was the cotton sash cord (or a synthetic one) would \u2018wick\u2019 water out of the core or cavity and dry the units. However, if there is one takeaway from this article, let it be that one should not get into a wicking contest with mortar or masonry units\u2014how can a 9.5-mm (3\/8-in.) diameter sash cord compete against an entire masonry assembly?<\/p>\n<p>Many have seen an example of a rope weep that has moisture stains around the outside end of the cord; it appears to have moisture \u2018weeping\u2019 from it. What is really happening is a small amount of moisture is actually exiting the cavity through small voids in the bed joint of mortar at the 5 o\u2019clock and 7 o\u2019clock positions on the bottom radius of the sash cord.<\/p>\n<p>Various tube weeps\u2014pieces of plastic pipe cut to length\u2014have also been introduced to the masonry industry. Their installation procedure is virtually the same as the sash cord material and so are the shortcomings. Even when the tubes are correctly installed on the flashing\u2019s surface, the weep\u2019s wall thickness is still a water dam.<\/p>\n<figure id=\"attachment_1582\" aria-describedby=\"caption-attachment-1582\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-1582 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image-1000x508.jpg\" alt=\"All images courtesy Masonry Technology Inc.\" width=\"500\" height=\"254\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image-1000x508.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image-300x152.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image-624x317.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image.jpg 1454w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><figcaption id=\"caption-attachment-1582\" class=\"wp-caption-text\"><em>Image courtesy Masonry Technology Inc.<\/em><\/figcaption><\/figure>\n<p>To read the full article, &#8220;Weep Now or Weep Later: Moisture management and risk zones for masonry,&#8221; click <a href=\"http:\/\/www.constructionspecifier.com\/masterformat\/weep-now-or-weep-later-moisture-management-and-risk-zones-for-masonry\/\">here<\/a>.<b><br \/>\n<\/b><\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>One of the first commonly employed weep details was the sash cord or \u2018rope\u2019 weep. In some cases, this detail was expanded with sections of the sash cord laid in the cavity and then extended through the wall, usually at a head joint. <\/p>\n","protected":false},"author":4,"featured_media":1582,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,184,245,489,460],"tags":[532,533,523,156,534,535],"class_list":["post-1579","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-04-00-00-masonry","category-04-20-00-unit-masonry","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-04-05-23-19masonry-cavity-drainage","tag-04-26-13masonry-veneer","tag-b2010-10exterior-wall-veneer","tag-masonry-veneer","tag-moisture-management","tag-weep","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Weep Now or Weep Later: Of ropes and tubes - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Weep Now or Weep Later: Of ropes and tubes - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"One of the first commonly employed weep details was the sash cord or \u2018rope\u2019 weep. In some cases, this detail was expanded with sections of the sash cord laid in the cavity and then extended through the wall, usually at a head joint.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2014-04-07T12:30:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-17T19:30:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1454\" \/>\n\t<meta property=\"og:image:height\" content=\"739\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Molly Doyle\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Molly Doyle\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/\"},\"author\":{\"name\":\"Molly Doyle\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\"},\"headline\":\"Weep Now or Weep Later: Of ropes and tubes\",\"datePublished\":\"2014-04-07T12:30:50+00:00\",\"dateModified\":\"2017-01-17T19:30:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/\"},\"wordCount\":391,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/04\\\/sidebar-image.jpg\",\"keywords\":[\"04 05 23.19?Masonry Cavity Drainage\",\"04 26 13?Masonry Veneer\",\"B2010.10?Exterior Wall Veneer\",\"masonry veneer\",\"Moisture management\",\"Weep\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"04 00 00 Masonry\",\"04 20 00 Unit Masonry\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/\",\"name\":\"Weep Now or Weep Later: Of ropes and tubes - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/04\\\/sidebar-image.jpg\",\"datePublished\":\"2014-04-07T12:30:50+00:00\",\"dateModified\":\"2017-01-17T19:30:20+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/04\\\/sidebar-image.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/04\\\/sidebar-image.jpg\",\"width\":1454,\"height\":739,\"caption\":\"All images courtesy Masonry Technology Inc.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/weep-now-or-weep-later-of-ropes-and-tubes\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Weep Now or Weep Later: Of ropes and tubes\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\",\"name\":\"Molly Doyle\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"caption\":\"Molly Doyle\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/molly\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Weep Now or Weep Later: Of ropes and tubes - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/","og_locale":"en_US","og_type":"article","og_title":"Weep Now or Weep Later: Of ropes and tubes - The Construction Specifier","og_description":"One of the first commonly employed weep details was the sash cord or \u2018rope\u2019 weep. In some cases, this detail was expanded with sections of the sash cord laid in the cavity and then extended through the wall, usually at a head joint.","og_url":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/","og_site_name":"The Construction Specifier","article_published_time":"2014-04-07T12:30:50+00:00","article_modified_time":"2017-01-17T19:30:20+00:00","og_image":[{"width":1454,"height":739,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image.jpg","type":"image\/jpeg"}],"author":"Molly Doyle","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Molly Doyle","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/"},"author":{"name":"Molly Doyle","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294"},"headline":"Weep Now or Weep Later: Of ropes and tubes","datePublished":"2014-04-07T12:30:50+00:00","dateModified":"2017-01-17T19:30:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/"},"wordCount":391,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image.jpg","keywords":["04 05 23.19?Masonry Cavity Drainage","04 26 13?Masonry Veneer","B2010.10?Exterior Wall Veneer","masonry veneer","Moisture management","Weep"],"articleSection":["Features","MasterFormat","UniFormat","04 00 00 Masonry","04 20 00 Unit Masonry","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/","url":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/","name":"Weep Now or Weep Later: Of ropes and tubes - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image.jpg","datePublished":"2014-04-07T12:30:50+00:00","dateModified":"2017-01-17T19:30:20+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/04\/sidebar-image.jpg","width":1454,"height":739,"caption":"All images courtesy Masonry Technology Inc."},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/weep-now-or-weep-later-of-ropes-and-tubes\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Weep Now or Weep Later: Of ropes and tubes"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294","name":"Molly Doyle","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","caption":"Molly Doyle"},"url":"https:\/\/www.constructionspecifier.com\/author\/molly\/"}]}},"views":24660,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/1579","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=1579"}],"version-history":[{"count":10,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/1579\/revisions"}],"predecessor-version":[{"id":25265,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/1579\/revisions\/25265"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/1582"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=1579"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=1579"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=1579"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}