{"id":16181,"date":"2016-04-08T09:28:08","date_gmt":"2016-04-08T13:28:08","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=16181"},"modified":"2017-01-24T12:48:50","modified_gmt":"2017-01-24T17:48:50","slug":"lowering-the-flaps-at-boston-airport","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/","title":{"rendered":"Lowering the flaps at Boston airport"},"content":{"rendered":"<figure id=\"attachment_16193\" aria-describedby=\"caption-attachment-16193\" style=\"width: 275px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16193\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1-1000x667.jpg\" alt=\"The fa\u00e7ade of Boston Logan International Airport\u2019s new 10-story West Garage Extension comprises more than 48,000 aluminum flapper panels that move with the wind. Photos courtesy EXTECH and Linetec.\" width=\"275\" height=\"183\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1-1000x667.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1-624x416.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1.jpg 2048w\" sizes=\"auto, (max-width: 275px) 100vw, 275px\" \/><\/a><figcaption id=\"caption-attachment-16193\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">The fa\u00e7ade of Boston Logan International Airport\u2019s new 10-story West Garage Extension comprises more than 48,000 aluminum flapper panels that move with the wind.<\/span><br \/> <em>Photos courtesy EXTECH and Linetec<\/em><\/figcaption><\/figure>\n<p>More than 48,000 aluminum flapper panels that move in response to wind currents comprise the fa\u00e7ade of Boston Logan International Airport\u2019s new 10-story West Garage Extension, designed by Arrowstreet Inc.<\/p>\n<p>Finished in Class I clear anodize, the 152.4-mm (6-in.) square curved flapper panels are set within 353 extruded aluminum framing support assemblies spanning eight stories high by 88 m (290 ft) wide.<\/p>\n<p>Subjected to 209-km\/h (130-mph) winds to test resiliency, the system\u2019s high-performance anodize finish also contributes to its durability. This material is commonly used for exterior building design features and other products that must withstand continuous outdoor exposure.<\/p>\n<p>\u201cVarious shapes, material thickness, and finishes were tested, resulting in the curved anodized aluminum pieces that reflect light and ripple with the breeze,\u201d noted David Bois, principal at Arrowstreet.<\/p>\n<p>The 6392-m<sup>2<\/sup> (68,880-sf) garage extension is part of a $4.4-billion investment over the last 10 years by Massachusetts Port Authority (Massport) to build a new runway, roadways, terminals, taxiways, and garages for the airport.<\/p>\n<figure id=\"attachment_16194\" aria-describedby=\"caption-attachment-16194\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-16194 size-medium\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan3-300x200.jpg\" alt=\"Designed by Arrowstreet, the garage optimizes the experience for passengers and its dynamic fa\u00e7ade enhances the view for the traveling public and visitors of the nearby 9\/11 Memorial and Hilton Hotel.\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan3-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan3-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan3-1000x667.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan3-624x416.jpg 624w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-16194\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Designed by Arrowstreet, the garage optimizes the experience for passengers and its dynamic fa\u00e7ade enhances the view for the traveling public and visitors of the nearby 9\/11 Memorial.<\/span><\/figcaption><\/figure>\n<p>The new garage is integrated into the airport\u2019s existing central parking, walkways, and adjacent terminals. Situated over the existing Hilton Hotel parking lot, it is the airport\u2019s tallest parking structure and offers 1700 more parking spaces. According to the design team, the garage optimizes the experience for passengers and its dynamic fa\u00e7ade enhances the view for the traveling public and visitors of the nearby 9\/11 Memorial and Hilton Hotel.<\/p>\n<p>Installation of the custom-made fa\u00e7ade began in November 2015 and was completed in January 2016. (Turner Construction Company and WSP | Parsons Brinckerhoff served respectively as the general contractor and engineer for the building. Massachusetts-based glazing contractor, Ipswich Bay Glass Company, installed the dynamic fa\u00e7ade.)<\/p>\n<p>\u201cThe move from the mass-produced to a more custom approach in design and construction provides for new possibilities, which parallel clients\u2019 rising expectations,\u201d Bois said. \u201cWithout the collaborative process, this unique installation could not have occurred within the budget or the project schedule. Simple, common components come together to form an uncommon result.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>More than 48,000 aluminum flapper panels that move in response to wind currents comprise the fa\u00e7ade of Boston Logan International Airport\u2019s new 10-story West Garage Extension, designed by Arrowstreet Inc.<\/p>\n","protected":false},"author":6,"featured_media":16193,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,449,185,188,279,489,460,514,478],"tags":[3064],"class_list":["post-16181","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-uniformat","category-05-00-00-metals","category-08-00-00-openings","category-08-80-00-glazing","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","category-g2020parking-lots","category-g20site-improvements","tag-massachusetts","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Lowering the flaps at Boston airport - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Lowering the flaps at Boston airport - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"More than 48,000 aluminum flapper panels that move in response to wind currents comprise the fa\u00e7ade of Boston Logan International Airport\u2019s new 10-story West Garage Extension, designed by Arrowstreet Inc.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2016-04-08T13:28:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-24T17:48:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1365\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Erik Missio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erik Missio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/\"},\"author\":{\"name\":\"Erik Missio\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\"},\"headline\":\"Lowering the flaps at Boston airport\",\"datePublished\":\"2016-04-08T13:28:08+00:00\",\"dateModified\":\"2017-01-24T17:48:50+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/\"},\"wordCount\":406,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/04\\\/Logan1.jpg\",\"keywords\":[\"Massachusetts\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"UniFormat\",\"05 00 00 Metals\",\"08 00 00 Openings\",\"08 80 00 Glazing\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\",\"G2020\u2212Parking Lots\",\"G20\u2212Site Improvements\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/\",\"name\":\"Lowering the flaps at Boston airport - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/04\\\/Logan1.jpg\",\"datePublished\":\"2016-04-08T13:28:08+00:00\",\"dateModified\":\"2017-01-24T17:48:50+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/04\\\/Logan1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/04\\\/Logan1.jpg\",\"width\":2048,\"height\":1365,\"caption\":\"The fa\u00e7ade of Boston Logan International Airport\u2019s new 10-story West Garage Extension comprises more than 48,000 aluminum flapper panels that move with the wind. Photos courtesy EXTECH and Linetec.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/lowering-the-flaps-at-boston-airport\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Lowering the flaps at Boston airport\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\",\"name\":\"Erik Missio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"caption\":\"Erik Missio\"},\"sameAs\":[\"http:\\\/\\\/www.constructionspecifier.com\"],\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/erik-missio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Lowering the flaps at Boston airport - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/","og_locale":"en_US","og_type":"article","og_title":"Lowering the flaps at Boston airport - The Construction Specifier","og_description":"More than 48,000 aluminum flapper panels that move in response to wind currents comprise the fa\u00e7ade of Boston Logan International Airport\u2019s new 10-story West Garage Extension, designed by Arrowstreet Inc.","og_url":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/","og_site_name":"The Construction Specifier","article_published_time":"2016-04-08T13:28:08+00:00","article_modified_time":"2017-01-24T17:48:50+00:00","og_image":[{"width":2048,"height":1365,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1.jpg","type":"image\/jpeg"}],"author":"Erik Missio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Erik Missio","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/"},"author":{"name":"Erik Missio","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b"},"headline":"Lowering the flaps at Boston airport","datePublished":"2016-04-08T13:28:08+00:00","dateModified":"2017-01-24T17:48:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/"},"wordCount":406,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1.jpg","keywords":["Massachusetts"],"articleSection":["Form+Function","MasterFormat","UniFormat","05 00 00 Metals","08 00 00 Openings","08 80 00 Glazing","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures","G2020\u2212Parking Lots","G20\u2212Site Improvements"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/","url":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/","name":"Lowering the flaps at Boston airport - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1.jpg","datePublished":"2016-04-08T13:28:08+00:00","dateModified":"2017-01-24T17:48:50+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/04\/Logan1.jpg","width":2048,"height":1365,"caption":"The fa\u00e7ade of Boston Logan International Airport\u2019s new 10-story West Garage Extension comprises more than 48,000 aluminum flapper panels that move with the wind. Photos courtesy EXTECH and Linetec."},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/lowering-the-flaps-at-boston-airport\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Lowering the flaps at Boston airport"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b","name":"Erik Missio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","caption":"Erik Missio"},"sameAs":["http:\/\/www.constructionspecifier.com"],"url":"https:\/\/www.constructionspecifier.com\/author\/erik-missio\/"}]}},"views":7805,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/16181","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=16181"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/16181\/revisions"}],"predecessor-version":[{"id":18984,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/16181\/revisions\/18984"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/16193"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=16181"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=16181"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=16181"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}