{"id":17270,"date":"2016-06-30T15:03:21","date_gmt":"2016-06-30T19:03:21","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=17270"},"modified":"2017-01-20T12:21:46","modified_gmt":"2017-01-20T17:21:46","slug":"hiding-hvac-in-plain-sight","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/","title":{"rendered":"Hiding HVAC in plain sight"},"content":{"rendered":"<figure id=\"attachment_17272\" aria-describedby=\"caption-attachment-17272\" style=\"width: 287px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17272\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A-1000x714.jpg\" alt=\"The three large beige boxes in the middle of the \u2018K\u2019-shape building\u2019s roof are plenums that also aesthetically cover the newly installed energy-recovery ventilation (ERV) units from street view. Photos courtesy SEMCO\" width=\"287\" height=\"205\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A-1000x714.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A-300x214.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A-768x549.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A-624x446.jpg 624w\" sizes=\"auto, (max-width: 287px) 100vw, 287px\" \/><\/a><figcaption id=\"caption-attachment-17272\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">The three large beige boxes in the middle of the \u2018K\u2019-shaped building\u2019s roof are plenums that also aesthetically cover the newly installed energy-recovery ventilation (ERV) units from street view.<\/span><br \/> <em>Photos courtesy SEMCO<\/em><\/figcaption><\/figure>\n<p>What do you do when there\u2019s no room to retrofit an HVAC exhaust air system inside a building? Take it outside and hide it behind architectural accoutrement.<\/p>\n<p>This was the solution implemented at Saint Thomas West Hospital in Nashville.<\/p>\n<p>Instead of space-consuming conventional indoor HVAC ductwork, the retrofit created return-air distribution to new rooftop energy-recovery ventilators (ERV) through ducts constructed of acoustical panels on the hospital\u2019s exterior. To hide the ductwork from the building\u2019s fa\u00e7ade, the design team came up with a support mount system.<\/p>\n<p>Built in 1973, the hospital\u2019s seven-story K Tower required an upgrade to its HVAC system that provided cost-cutting energy recovery, preheated increased outdoor air, and enhanced indoor air quality (IAQ).<\/p>\n<p>The HVAC project was part of a four-year, multi-phase $95-million renovation of the 195,096-m<sup>2<\/sup> (2.1 million-sf) campus. The retrofit also helps the building meet current American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE) 170, <em>Ventilation for Health Care Facilities<\/em>, enhancing IAQ for patients and employees.<\/p>\n<figure id=\"attachment_17273\" aria-describedby=\"caption-attachment-17273\" style=\"width: 246px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/E.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17273 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/E-e1475607444431.jpg\" alt=\"A ground-level view of the side of the building. The middle track is aesthetic acoustic panels used as ductwork to collect air from each floor and transport it to the roof.\" width=\"246\" height=\"260\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/E-e1475607444431.jpg 1196w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/E-e1475607444431-284x300.jpg 284w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/E-e1475607444431-768x812.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/E-e1475607444431-946x1000.jpg 946w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/E-e1475607444431-624x659.jpg 624w\" sizes=\"auto, (max-width: 246px) 100vw, 246px\" \/><\/a><figcaption id=\"caption-attachment-17273\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">A ground-level view of the side of the building. The middle track is aesthetic acoustic panels used as ductwork to collect air from each floor and transport it to the roof.<\/span><\/figcaption><\/figure>\n<p>Maintaining the building\u2019s aesthetics was a priority. The panels\u2019 custom factory powder-coated sandalwood color matches the building\u2019s exterior and blends into the fa\u00e7ade\u2019s exterior. The panels also have custom factory-designed 3.8-m (12.6-ft) lengths. When combined with a 152.4-mm (six-in.) wide metal support band, the panels match up with the building\u2019s precast concrete seams, which are spaced at 4-m (13-ft) increments. As a result, the panel and building seams match and appear continuous.<\/p>\n<p>Custom-designed to remain unseen, the riser suspension system also allows for seismic and wind loads using hidden wedge anchors drilled into the precast concrete. Unseen 127 x 127-mm (5 x 5-in.) tubular steel stubs incorporated into the building-side of the panels connect to the wedge anchors. The result is a riser with no visible support structure.<\/p>\n<p>Collecting the exhaust air from each wing riser is a 1.8 x 3.7 x 19-m (6 x 12 x 63-ft) plenum, also constructed of acoustical panels. The plenum aesthetically appears as a rooftop architectural fa\u00e7ade and hides the three packaged ERV units from street-level view.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>What do you do when there\u2019s no room to retrofit an HVAC exhaust air system inside a building? Take it outside and hide it behind architectural accoutrement. That\u2019s the solution implemented at Saint Thomas West Hospital in Nashville.<\/p>\n","protected":false},"author":6,"featured_media":17272,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,449,197,336,460,461,466],"tags":[3289,103,3266],"class_list":["post-17270","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-uniformat","category-23-00-00-heating-ventilating-and-air-conditioning-hvac","category-23-30-00-hvac-air-distribution","category-b20exterior-vertical-enclosures","category-b30exterior-horizontal-enclosures","category-d30heating-ventilation-and-air-conditioning","tag-erv","tag-hvac","tag-tennessee","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hiding HVAC in plain sight - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hiding HVAC in plain sight - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"What do you do when there\u2019s no room to retrofit an HVAC exhaust air system inside a building? Take it outside and hide it behind architectural accoutrement. That\u2019s the solution implemented at Saint Thomas West Hospital in Nashville.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2016-06-30T19:03:21+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-20T17:21:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2100\" \/>\n\t<meta property=\"og:image:height\" content=\"1500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Erik Missio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erik Missio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/\"},\"author\":{\"name\":\"Erik Missio\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\"},\"headline\":\"Hiding HVAC in plain sight\",\"datePublished\":\"2016-06-30T19:03:21+00:00\",\"dateModified\":\"2017-01-20T17:21:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/\"},\"wordCount\":420,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/06\\\/A.jpg\",\"keywords\":[\"ERV\",\"HVAC\",\"Tennessee\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"UniFormat\",\"23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)\",\"23 30 00 HVAC Air Distribution\",\"B20\u2212Exterior Vertical Enclosures\",\"B30\u2212Exterior Horizontal Enclosures\",\"D30\u2212Heating, Ventilation, and Air-conditioning\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/\",\"name\":\"Hiding HVAC in plain sight - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/06\\\/A.jpg\",\"datePublished\":\"2016-06-30T19:03:21+00:00\",\"dateModified\":\"2017-01-20T17:21:46+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/06\\\/A.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/06\\\/A.jpg\",\"width\":2100,\"height\":1500,\"caption\":\"The three large beige boxes in the middle of the \u2018K\u2019-shape building\u2019s roof are plenums that also aesthetically cover the newly installed energy-recovery ventilation (ERV) units from street view. Photos courtesy SEMCO\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/hiding-hvac-in-plain-sight\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Hiding HVAC in plain sight\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\",\"name\":\"Erik Missio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"caption\":\"Erik Missio\"},\"sameAs\":[\"http:\\\/\\\/www.constructionspecifier.com\"],\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/erik-missio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hiding HVAC in plain sight - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/","og_locale":"en_US","og_type":"article","og_title":"Hiding HVAC in plain sight - The Construction Specifier","og_description":"What do you do when there\u2019s no room to retrofit an HVAC exhaust air system inside a building? Take it outside and hide it behind architectural accoutrement. That\u2019s the solution implemented at Saint Thomas West Hospital in Nashville.","og_url":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/","og_site_name":"The Construction Specifier","article_published_time":"2016-06-30T19:03:21+00:00","article_modified_time":"2017-01-20T17:21:46+00:00","og_image":[{"width":2100,"height":1500,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A.jpg","type":"image\/jpeg"}],"author":"Erik Missio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Erik Missio","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/"},"author":{"name":"Erik Missio","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b"},"headline":"Hiding HVAC in plain sight","datePublished":"2016-06-30T19:03:21+00:00","dateModified":"2017-01-20T17:21:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/"},"wordCount":420,"commentCount":1,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A.jpg","keywords":["ERV","HVAC","Tennessee"],"articleSection":["Form+Function","MasterFormat","UniFormat","23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)","23 30 00 HVAC Air Distribution","B20\u2212Exterior Vertical Enclosures","B30\u2212Exterior Horizontal Enclosures","D30\u2212Heating, Ventilation, and Air-conditioning"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/","url":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/","name":"Hiding HVAC in plain sight - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A.jpg","datePublished":"2016-06-30T19:03:21+00:00","dateModified":"2017-01-20T17:21:46+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/06\/A.jpg","width":2100,"height":1500,"caption":"The three large beige boxes in the middle of the \u2018K\u2019-shape building\u2019s roof are plenums that also aesthetically cover the newly installed energy-recovery ventilation (ERV) units from street view. Photos courtesy SEMCO"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/hiding-hvac-in-plain-sight\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Hiding HVAC in plain sight"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b","name":"Erik Missio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","caption":"Erik Missio"},"sameAs":["http:\/\/www.constructionspecifier.com"],"url":"https:\/\/www.constructionspecifier.com\/author\/erik-missio\/"}]}},"views":6838,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/17270","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=17270"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/17270\/revisions"}],"predecessor-version":[{"id":25711,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/17270\/revisions\/25711"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/17272"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=17270"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=17270"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=17270"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}