{"id":17427,"date":"2016-07-08T09:22:41","date_gmt":"2016-07-08T13:22:41","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=17427"},"modified":"2017-01-19T15:59:34","modified_gmt":"2017-01-19T20:59:34","slug":"concrete-solutions-to-restoring-dealership-parking-garage","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/","title":{"rendered":"Concrete solutions to restoring dealership parking garage"},"content":{"rendered":"<figure id=\"attachment_17430\" aria-describedby=\"caption-attachment-17430\" style=\"width: 279px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-17430\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford.jpg\" alt=\"Crews repaired, restored, and protected each of the levels of this three-level concrete parking garage in Sandy Springs, Georgia. Photo courtesy Western Specialty Contractors\" width=\"279\" height=\"208\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford.jpg 792w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford-300x224.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford-768x574.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford-624x466.jpg 624w\" sizes=\"auto, (max-width: 279px) 100vw, 279px\" \/><figcaption id=\"caption-attachment-17430\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Crews repaired, restored, and protected each of the levels of this three-level concrete parking garage in Sandy Springs, Georgia<\/span>.<br \/> <em>Photo courtesy Western Specialty Contractors<\/em><\/figcaption><\/figure>\n<p>Applying a clear penetrating sealer and urethane sealant are just two of the steps that went into restoring Nalley Ford\u2019s three-level concrete parking garage.<\/p>\n<p>Based in Sandy Springs, Georgia, the dealership\u2019s garage required repair, restoration, and protection of its surfaces\u2014each of the levels with their own specific damage.<\/p>\n<p>Exposed to the elements, the garage\u2019s top level required cleaning using a high-pressure 20,684-kPA (3000-psi) water-blaster. Once the pressure washing was complete, crews saturated the concrete surfaces with a clear penetrating sealer. Next, they routed and sealed approximately 1700 m (5580 ft) of existing cracks and control joints using a urethane sealant. Additionally, workers removed 97 m (318 ft) of existing sealant around the perimeter joint, then lightly grinded the joint edges to remove any loose residual sealant. A new urethane sealant was then applied. To allow for expansion\/contraction of the concrete intersections, 121 m<sup>2<\/sup> (1300 sf) of new pour strips were installed.<\/p>\n<p>At the exterior wall joints, approximately 168 m (550 ft) of existing sealant was removed, ground down, and replaced with a new urethane sealant. Workers also removed oxidation at the exterior wall weld plates, and applied an epoxy chromate primer and urethane topcoat. To complete the top-level restoration, crews applied two coats of elastomeric coating to approximately 758 m<sup>2 <\/sup>(8160 sf) of wall substrate, as well as a traffic-deck coating system.<\/p>\n<p>On the intermediate level, all concrete surfaces were cleaned using a high-pressure water-blaster, before approximately 1700 m (5580 ft) of existing cracks and control joints were routed and sealed with a urethane sealant.<\/p>\n<p>Crews also removed about 164 m (540 ft) of existing sealant around the perimeter joints and replaced it with a urethane sealant. Oxidation on corbal bearing plates and double-tee bearing plates was removed and refinished with an alphatic urethane top coat. The precast wall perimeter was also resealed and repairs were made to damaged columns, which were resealed with two coats of an anti-corrosion bond inhibitor. Workers saw-cut and chipped out damaged concrete on the slab floor and replaced it with new concrete.<\/p>\n<p>The parking garage\u2019s lower level also required restoration and repair. Specifically, crews removed oxidation on the gusseted steel corbels, spanning plates, and double-tee bearing plates; they then applied an alphatic urethane topcoat. Next, the crew removed deteriorated concrete around the beams, replacing damaged steel and patching the beams with new concrete.<\/p>\n<p>On areas where steel web was showing as a result of deteriorating concrete, the surrounding concrete was removed, the damaged steel was replaced, and the area patched with new concrete.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Applying a clear penetrating sealer and urethane sealant are just two of the steps that went into restoring a Georgia Ford\u2019 dealership&#8217;s three-level concrete parking garage.<\/p>\n","protected":false},"author":6,"featured_media":17430,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,449,183,489,460,514,478],"tags":[752,3278,79],"class_list":["post-17427","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-uniformat","category-03-00-00-concrete","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","category-g2020parking-lots","category-g20site-improvements","tag-concrete","tag-georgia","tag-repair","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Concrete solutions to restoring dealership parking garage - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Concrete solutions to restoring dealership parking garage - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Applying a clear penetrating sealer and urethane sealant are just two of the steps that went into restoring a Georgia Ford\u2019 dealership&#039;s three-level concrete parking garage.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2016-07-08T13:22:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-19T20:59:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"792\" \/>\n\t<meta property=\"og:image:height\" content=\"592\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Erik Missio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erik Missio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/\"},\"author\":{\"name\":\"Erik Missio\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\"},\"headline\":\"Concrete solutions to restoring dealership parking garage\",\"datePublished\":\"2016-07-08T13:22:41+00:00\",\"dateModified\":\"2017-01-19T20:59:34+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/\"},\"wordCount\":449,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/07\\\/IMG_0593-Ford.jpg\",\"keywords\":[\"Concrete\",\"Georgia\",\"repair\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"UniFormat\",\"03 00 00 Concrete\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\",\"G2020\u2212Parking Lots\",\"G20\u2212Site Improvements\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/\",\"name\":\"Concrete solutions to restoring dealership parking garage - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/07\\\/IMG_0593-Ford.jpg\",\"datePublished\":\"2016-07-08T13:22:41+00:00\",\"dateModified\":\"2017-01-19T20:59:34+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/07\\\/IMG_0593-Ford.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/07\\\/IMG_0593-Ford.jpg\",\"width\":792,\"height\":592,\"caption\":\"Crews repaired, restored, and protected each of the levels of this three-level concrete parking garage in Sandy Springs, Georgia. Photo courtesy Western Specialty Contractors\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/concrete-solutions-to-restoring-dealership-parking-garage\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Concrete solutions to restoring dealership parking garage\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\",\"name\":\"Erik Missio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"caption\":\"Erik Missio\"},\"sameAs\":[\"http:\\\/\\\/www.constructionspecifier.com\"],\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/erik-missio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Concrete solutions to restoring dealership parking garage - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/","og_locale":"en_US","og_type":"article","og_title":"Concrete solutions to restoring dealership parking garage - The Construction Specifier","og_description":"Applying a clear penetrating sealer and urethane sealant are just two of the steps that went into restoring a Georgia Ford\u2019 dealership's three-level concrete parking garage.","og_url":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/","og_site_name":"The Construction Specifier","article_published_time":"2016-07-08T13:22:41+00:00","article_modified_time":"2017-01-19T20:59:34+00:00","og_image":[{"width":792,"height":592,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford.jpg","type":"image\/jpeg"}],"author":"Erik Missio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Erik Missio","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/"},"author":{"name":"Erik Missio","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b"},"headline":"Concrete solutions to restoring dealership parking garage","datePublished":"2016-07-08T13:22:41+00:00","dateModified":"2017-01-19T20:59:34+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/"},"wordCount":449,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford.jpg","keywords":["Concrete","Georgia","repair"],"articleSection":["Form+Function","MasterFormat","UniFormat","03 00 00 Concrete","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures","G2020\u2212Parking Lots","G20\u2212Site Improvements"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/","url":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/","name":"Concrete solutions to restoring dealership parking garage - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford.jpg","datePublished":"2016-07-08T13:22:41+00:00","dateModified":"2017-01-19T20:59:34+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/07\/IMG_0593-Ford.jpg","width":792,"height":592,"caption":"Crews repaired, restored, and protected each of the levels of this three-level concrete parking garage in Sandy Springs, Georgia. Photo courtesy Western Specialty Contractors"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/concrete-solutions-to-restoring-dealership-parking-garage\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Concrete solutions to restoring dealership parking garage"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b","name":"Erik Missio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","caption":"Erik Missio"},"sameAs":["http:\/\/www.constructionspecifier.com"],"url":"https:\/\/www.constructionspecifier.com\/author\/erik-missio\/"}]}},"views":4619,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/17427","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=17427"}],"version-history":[{"count":4,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/17427\/revisions"}],"predecessor-version":[{"id":18967,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/17427\/revisions\/18967"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/17430"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=17427"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=17427"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=17427"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}