{"id":19248,"date":"2016-10-24T10:13:50","date_gmt":"2016-10-24T14:13:50","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=19248"},"modified":"2016-12-07T11:53:49","modified_gmt":"2016-12-07T16:53:49","slug":"one-thing-leads-to-another","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/","title":{"rendered":"One thing leads to another&#8230;"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-569 alignleft\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2013\/08\/slaton.jpg\" alt=\"slaton\" width=\"100\" height=\"104\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-571 alignleft\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2013\/08\/patterson.jpg\" alt=\"patterson\" width=\"100\" height=\"104\" \/> <img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-570 alignleft\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2013\/08\/sutterlin.jpg\" alt=\"sutterlin\" width=\"100\" height=\"104\" \/><span style=\"font-size: large;\"><strong><span style=\"color: #808080;\">FAILURES<\/span><\/strong><\/span><br \/>\n<strong>Deborah Slaton, David S. Patterson, AIA, and Jeffrey N. Sutterlin, PE<\/strong><i><br \/>\n<\/i>During a visit to review curtain wall assemblies on a project under construction, we noticed something unrelated\u2014brick ties supporting a cantilevered through-wall flashing drip plate at a window opening in the exterior masonry. This unusual condition invited further examination of the cavity wall construction.<\/p>\n<p>The inventive use of brick ties raised concerns about whether the drip plate can be self-supporting (without the ties) and, more importantly, whether the shelf angle below the drip plate was positioned to provide sufficient support for the brick above. (Both American Concrete Institute\/American Society of Civil Engineers\/The Masonry Society [ACI\/ASCE\/TMS] 530\/530.1, Building Code Requirements and Specification for Masonry Structures and Companion Commentaries, and Brick Industry Association [BIA] Technical Note 21, Brick Masonry Cavity Walls, recommend a minimum of two-thirds bearing for brick veneers.) Extending the metal drip plate beyond the toe of the shelf angle also exposed the adhered foam pad at the underside of the horizontal leg of the metal drip edge to view.<\/p>\n<p><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/photo-1-mod.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-19251 alignright\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/photo-1-mod-e1481129498884.jpg\" width=\"306\" height=\"165\" \/><\/a>While it was not clear if the membrane flashing continued above the stone piers at each jamb of the masonry opening, the metal drip plate stopped short of the stone piers, and end dams were not provided at terminations in the drip plate. BIA recommends use of a ultraviolet (UV)-stable flashing drip edge (pan or plate) that extends beyond the exterior face of the masonry veneer; there should also be vertical end dams at flashing terminations to prevent lateral water migration from bypassing the flashing plane.<\/p>\n<p>The steel shelf angle (which was anchored to the building structure) also stopped short of the stone piers at the jambs of the opening, resulting in a section of unsupported brick masonry and membrane flashing.<\/p>\n<figure id=\"attachment_19250\" aria-describedby=\"caption-attachment-19250\" style=\"width: 307px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/Photo-2-mod.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-19250\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/Photo-2-mod.jpg\" alt=\"Brick ties (1) used to support the cantilevered portion of the through-wall flashing drip plate at an opening in the wall drew attention to the construction of the entire wall assembly. Further review of the wall assembly revealed the drip plate was not only cantilevered, exposing the foam pad, but also discontinuous at the stone piers (2); the shelf angle stopped short of the stone pier, resulting in an unsupported masonry and flashing condition (3); and the membrane through-wall flashing was exposed to UV light (4). Photos courtesy WJE\" width=\"307\" height=\"230\" \/><\/a><figcaption id=\"caption-attachment-19250\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Brick ties (1) used to support the cantilevered portion of the through-wall flashing drip plate at an opening in the wall drew attention to the construction of the entire wall assembly. Further review of the wall assembly revealed the drip plate was not only cantilevered, exposing the foam pad, but also discontinuous at the stone piers (2); the shelf angle stopped short of the stone pier, resulting in an unsupported masonry and flashing condition (3); and the membrane through-wall flashing was exposed to UV light (4). <\/span><br \/> <em>Photos courtesy WJE<\/em><\/figcaption><\/figure>\n<p>Further, a flexible flashing membrane was used to integrate the weather-resistive barrier on the backup wall with the metal drip plate. However, the aforementioned discontinuities in the shelf angle resulted in the unsupported portion of flexible membrane flashing being exposed to environmental conditions. Flexible flashings require continuous support and typically need to be fully concealed, due to their susceptibility to UV degradation.<\/p>\n<p>For this project, investigation of an odd as-built condition led to discovery of a host of conditions bringing into question the long-term serviceability and stability of the exterior masonry above the window. Removal of the brick cladding above the opening will likely be required to properly address the support and flashing issues discovered. Proper development of details, coordination, and execution during exterior wall construction, and a diligent and effective quality assurance\/control (QA\/QC) program, could have avoided this creative, yet problematic, construction detail.<\/p>\n<p><span style=\"color: #606060;\">The opinions expressed in Failures are based on the authors\u2019 experiences and do not necessarily reflect those of the CSI or <em>The Construction Specifier<\/em>.<\/span><\/p>\n<p><span style=\"color: #000000;\"><em>Deborah Slaton is an architectural conservator and principal with Wiss, Janney, Elstner Associates (WJE) in Northbrook, Illinois, specializing in historic preservation and materials conservation. She can be reached at <span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"mailto:dslaton@wje.com\">dslaton@wje.com<\/a><\/span>.<\/em><\/span><\/p>\n<p><span style=\"color: #000000;\"><em>David S. Patterson, AIA, is an architect and senior principal with the Princeton, New Jersey, office of WJE, specializing in investigation and repair of the building envelope. He can be contacted at <span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"mailto:dpatterson@wje.com\">dpatterson@wje.com<\/a><\/span>.<\/em><\/span><\/p>\n<p><span style=\"color: #000000;\"><em>Jeffrey N. Sutterlin, PE, is an architectural engineer and senior associate with WJE\u2019s Princeton office, specializing in investigation and repair of the building envelope. He can be reached at <span style=\"color: #ff0000;\"><a style=\"color: #ff0000;\" href=\"mailto:jsutterlin@wje.com\">jsutterlin@wje.com<\/a><\/span>.<\/em><\/span><\/p>\n","protected":false},"excerpt":{"rendered":"<p>During a visit to review curtain wall assemblies on a project under construction, we noticed something unrelated\u2014brick ties supporting a cantilevered through-wall flashing drip plate at a window opening in the exterior masonry. This unusual condition invited further examination of the cavity wall construction.<\/p>\n","protected":false},"author":6,"featured_media":19251,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,24],"tags":[2289,2656,113,67],"class_list":["post-19248","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-columns","category-failures","tag-brick-ties","tag-flashing","tag-masonry","tag-moisture","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>One thing leads to another... - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"One thing leads to another... - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"During a visit to review curtain wall assemblies on a project under construction, we noticed something unrelated\u2014brick ties supporting a cantilevered through-wall flashing drip plate at a window opening in the exterior masonry. This unusual condition invited further examination of the cavity wall construction.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2016-10-24T14:13:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2016-12-07T16:53:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/photo-1-mod-e1481129498884.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"430\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Erik Missio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erik Missio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/\"},\"author\":{\"name\":\"Erik Missio\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\"},\"headline\":\"One thing leads to another&#8230;\",\"datePublished\":\"2016-10-24T14:13:50+00:00\",\"dateModified\":\"2016-12-07T16:53:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/\"},\"wordCount\":664,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/photo-1-mod-e1481129498884.jpg\",\"keywords\":[\"brick ties\",\"Flashing\",\"Masonry\",\"moisture\"],\"articleSection\":[\"Columns\",\"Failures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/\",\"name\":\"One thing leads to another... - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/photo-1-mod-e1481129498884.jpg\",\"datePublished\":\"2016-10-24T14:13:50+00:00\",\"dateModified\":\"2016-12-07T16:53:49+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/photo-1-mod-e1481129498884.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/10\\\/photo-1-mod-e1481129498884.jpg\",\"width\":800,\"height\":430,\"caption\":\"Brick ties (1) used to support the cantilevered portion of the through-wall flashing drip plate at an opening in the wall drew attention to the construction of the entire wall assembly. Further review of the wall assembly revealed the drip plate was not only cantilevered, exposing the foam pad, but also discontinuous at the stone piers (2); the shelf angle stopped short of the stone pier, resulting in an unsupported masonry and flashing condition (3); and the membrane through-wall flashing was exposed to UV light (4). Photos courtesy WJE\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/one-thing-leads-to-another\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"One thing leads to another&#8230;\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\",\"name\":\"Erik Missio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"caption\":\"Erik Missio\"},\"sameAs\":[\"http:\\\/\\\/www.constructionspecifier.com\"],\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/erik-missio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"One thing leads to another... - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/","og_locale":"en_US","og_type":"article","og_title":"One thing leads to another... - The Construction Specifier","og_description":"During a visit to review curtain wall assemblies on a project under construction, we noticed something unrelated\u2014brick ties supporting a cantilevered through-wall flashing drip plate at a window opening in the exterior masonry. This unusual condition invited further examination of the cavity wall construction.","og_url":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/","og_site_name":"The Construction Specifier","article_published_time":"2016-10-24T14:13:50+00:00","article_modified_time":"2016-12-07T16:53:49+00:00","og_image":[{"width":800,"height":430,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/photo-1-mod-e1481129498884.jpg","type":"image\/jpeg"}],"author":"Erik Missio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Erik Missio","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/"},"author":{"name":"Erik Missio","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b"},"headline":"One thing leads to another&#8230;","datePublished":"2016-10-24T14:13:50+00:00","dateModified":"2016-12-07T16:53:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/"},"wordCount":664,"commentCount":1,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/photo-1-mod-e1481129498884.jpg","keywords":["brick ties","Flashing","Masonry","moisture"],"articleSection":["Columns","Failures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/","url":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/","name":"One thing leads to another... - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/photo-1-mod-e1481129498884.jpg","datePublished":"2016-10-24T14:13:50+00:00","dateModified":"2016-12-07T16:53:49+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/photo-1-mod-e1481129498884.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/10\/photo-1-mod-e1481129498884.jpg","width":800,"height":430,"caption":"Brick ties (1) used to support the cantilevered portion of the through-wall flashing drip plate at an opening in the wall drew attention to the construction of the entire wall assembly. Further review of the wall assembly revealed the drip plate was not only cantilevered, exposing the foam pad, but also discontinuous at the stone piers (2); the shelf angle stopped short of the stone pier, resulting in an unsupported masonry and flashing condition (3); and the membrane through-wall flashing was exposed to UV light (4). Photos courtesy WJE"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/one-thing-leads-to-another\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"One thing leads to another&#8230;"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b","name":"Erik Missio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","caption":"Erik Missio"},"sameAs":["http:\/\/www.constructionspecifier.com"],"url":"https:\/\/www.constructionspecifier.com\/author\/erik-missio\/"}]}},"views":5320,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/19248","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=19248"}],"version-history":[{"count":9,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/19248\/revisions"}],"predecessor-version":[{"id":22182,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/19248\/revisions\/22182"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/19251"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=19248"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=19248"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=19248"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}