{"id":196832,"date":"2022-08-22T14:37:05","date_gmt":"2022-08-22T18:37:05","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=196832"},"modified":"2022-08-23T16:09:30","modified_gmt":"2022-08-23T20:09:30","slug":"seattle-offices-adaptive-reuse-revision-breaks-down-silos","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/","title":{"rendered":"Seattle office\u2019s adaptive reuse revision breaks down silos"},"content":{"rendered":"<figure id=\"attachment_196834\" aria-describedby=\"caption-attachment-196834\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-196834 size-medium\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_2-300x200.jpg\" alt=\"\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_2-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_2-500x334.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_2-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_2.jpg 1000w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-196834\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\"> The dining area in the Cushing Terrell\u2019s new 836-m2 (9,000-sf) Seattle office, housed in a warehouse of historical value. <\/span> <em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photo courtesy Mark Woods Photography <\/span><\/em><\/figcaption><\/figure>\n<p>Cushing Terrell\u2019s architecture and design teams reconfigured the existing floor plan of the company\u2019s new Seattle office to allow for greater workforce flow and opportunities for collaboration by motivating employees to break free from quieter, focused workspaces.<\/p>\n<p>The firm recently relocated from Lower Queen Anne to the 836-m<sup>2 <\/sup>(9,000-sf) penthouse of the Agen Warehouse building\u2014listed on the National Register of Historic Places\u2014at Seattle Waterfront. The penthouse was added to the building in a 1980s renovation. It offers beautiful views of the Puget Sound and the Olympic Mountains.<\/p>\n<div class=\"mceTemp\"><\/div>\n<p>The renovation employed the services of the contractor Abbott Construction. The emphasis of the renovation was to optimize the existing space to create an efficient flow of employees and activities, and to designate areas where team members could hold conversations without regard to organizational hierarchies.<\/p>\n<figure id=\"attachment_196833\" aria-describedby=\"caption-attachment-196833\" style=\"width: 283px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-196833 \" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_1-300x240.jpg\" alt=\"\" width=\"283\" height=\"226\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_1-300x240.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_1-500x400.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_1-768x614.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/SeattleOffice_1.jpg 1000w\" sizes=\"auto, (max-width: 283px) 100vw, 283px\" \/><\/a><figcaption id=\"caption-attachment-196833\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\"> Cushing Terrell\u2019s new Seattle office\u2019s entrance is designed as a welcoming space. <\/span> <em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photo courtesy Mark Woods Photography<\/span><\/em><\/figcaption><\/figure>\n<p>As guests come from the elevator bay to the office floor, they see a welcoming company sign which leads them into a series of meeting places, including a living room, a private 111-m<sup>2<\/sup> (1,200-sf) rooftop deck, dining room, and open kitchen space.<\/p>\n<p>The open kitchen and dining room have replaced the small, private offices. Floor-to-ceiling windows have taken over the separating walls to maximize the scenic views of the building\u2019s surroundings.<\/p>\n<p>One of the key areas in the office is the design lab, which lies, encased in large, sliding glass doors, adjacent to the open-layout break room. It serves as a crucial gathering space for the community, fostering an environment conducive to collaborative, creative problem-solving.<\/p>\n<p>The motivation behind relocating to an old warehouse building was to make adaptive reuse of a site with historical value. Moreover, conference tables and workspace caddies were considerately brought from the previous office.<\/p>\n<p>A repaint on a series of workstation storage units from the previous office allowed them to blend with the new desks. Some of the furniture was resold, while material samples received from industry partners were returned. Reuse also extended to some of the new furniture items and fixtures as well. For instance, the dining table was saved from a decommissioned showroom closed during the pandemic, and a Living Product Challenge-certified woven rug made from 100 percent-recycled plastic water bottles was spread in the dining room.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Cushing Terrell\u2019s architecture and design teams reconfigured the existing floor plan of the company\u2019s new Seattle office to allow for greater workforce flow and opportunities for collaboration by motivating employees to break free from quieter, focused workspaces. <\/p>\n","protected":false},"author":29853,"featured_media":196835,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[7356,3137,6449,7357,7359,7358,3637,3325,6170],"class_list":["post-196832","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-adaptive-resuse","tag-collaboration","tag-cushing-terrell","tag-olympic-mountains","tag-open-layout","tag-puget-sound","tag-renovation","tag-seattle","tag-waterfront","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Seattle office\u2019s adaptive reuse revision breaks down silos - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"Cushing Terrell\u2019s teams reconfigured the existing floor plan of the company\u2019s new Seattle office to allow for greater flow and collaboration.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Seattle office\u2019s adaptive reuse revision breaks down silos - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Cushing Terrell\u2019s teams reconfigured the existing floor plan of the company\u2019s new Seattle office to allow for greater flow and collaboration.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2022-08-22T18:37:05+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-23T20:09:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/AA_SeattleOffice_2_F.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"arslan_ahmed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"arslan_ahmed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/\"},\"author\":{\"name\":\"arslan_ahmed\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\"},\"headline\":\"Seattle office\u2019s adaptive reuse revision breaks down silos\",\"datePublished\":\"2022-08-22T18:37:05+00:00\",\"dateModified\":\"2022-08-23T20:09:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/\"},\"wordCount\":436,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/AA_SeattleOffice_2_F.jpg\",\"keywords\":[\"adaptive resuse\",\"Collaboration\",\"Cushing Terrell\",\"Olympic Mountains\",\"open-layout\",\"Puget Sound\",\"Renovation\",\"Seattle\",\"Waterfront\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/\",\"name\":\"Seattle office\u2019s adaptive reuse revision breaks down silos - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/AA_SeattleOffice_2_F.jpg\",\"datePublished\":\"2022-08-22T18:37:05+00:00\",\"dateModified\":\"2022-08-23T20:09:30+00:00\",\"description\":\"Cushing Terrell\u2019s teams reconfigured the existing floor plan of the company\u2019s new Seattle office to allow for greater flow and collaboration.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/AA_SeattleOffice_2_F.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/08\\\/AA_SeattleOffice_2_F.jpg\",\"width\":400,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Seattle office\u2019s adaptive reuse revision breaks down silos\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\",\"name\":\"arslan_ahmed\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"caption\":\"arslan_ahmed\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/arslan_ahmed\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Seattle office\u2019s adaptive reuse revision breaks down silos - The Construction Specifier","description":"Cushing Terrell\u2019s teams reconfigured the existing floor plan of the company\u2019s new Seattle office to allow for greater flow and collaboration.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/","og_locale":"en_US","og_type":"article","og_title":"Seattle office\u2019s adaptive reuse revision breaks down silos - The Construction Specifier","og_description":"Cushing Terrell\u2019s teams reconfigured the existing floor plan of the company\u2019s new Seattle office to allow for greater flow and collaboration.","og_url":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/","og_site_name":"The Construction Specifier","article_published_time":"2022-08-22T18:37:05+00:00","article_modified_time":"2022-08-23T20:09:30+00:00","og_image":[{"width":400,"height":200,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/AA_SeattleOffice_2_F.jpg","type":"image\/jpeg"}],"author":"arslan_ahmed","twitter_card":"summary_large_image","twitter_misc":{"Written by":"arslan_ahmed","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/"},"author":{"name":"arslan_ahmed","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502"},"headline":"Seattle office\u2019s adaptive reuse revision breaks down silos","datePublished":"2022-08-22T18:37:05+00:00","dateModified":"2022-08-23T20:09:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/"},"wordCount":436,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/AA_SeattleOffice_2_F.jpg","keywords":["adaptive resuse","Collaboration","Cushing Terrell","Olympic Mountains","open-layout","Puget Sound","Renovation","Seattle","Waterfront"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/","url":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/","name":"Seattle office\u2019s adaptive reuse revision breaks down silos - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/AA_SeattleOffice_2_F.jpg","datePublished":"2022-08-22T18:37:05+00:00","dateModified":"2022-08-23T20:09:30+00:00","description":"Cushing Terrell\u2019s teams reconfigured the existing floor plan of the company\u2019s new Seattle office to allow for greater flow and collaboration.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/AA_SeattleOffice_2_F.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/08\/AA_SeattleOffice_2_F.jpg","width":400,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/seattle-offices-adaptive-reuse-revision-breaks-down-silos\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Seattle office\u2019s adaptive reuse revision breaks down silos"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502","name":"arslan_ahmed","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","caption":"arslan_ahmed"},"url":"https:\/\/www.constructionspecifier.com\/author\/arslan_ahmed\/"}]}},"views":4335,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/196832","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/29853"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=196832"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/196832\/revisions"}],"predecessor-version":[{"id":196847,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/196832\/revisions\/196847"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/196835"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=196832"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=196832"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=196832"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}