{"id":202369,"date":"2022-11-07T17:21:18","date_gmt":"2022-11-07T22:21:18","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=202369"},"modified":"2022-11-08T15:53:38","modified_gmt":"2022-11-08T20:53:38","slug":"uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/","title":{"rendered":"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime"},"content":{"rendered":"<figure id=\"attachment_202371\" aria-describedby=\"caption-attachment-202371\" style=\"width: 333px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-202371\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1-300x225.jpg\" alt=\"\" width=\"333\" height=\"250\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1-768x576.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1.jpg 1024w\" sizes=\"auto, (max-width: 333px) 100vw, 333px\" \/><\/a><figcaption id=\"caption-attachment-202371\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> A photo of the fa\u00e7ade of the Founders Hall at the Foster School of Business at Washington University (UW), which incorporates high performance glazing exposing the timber inside the building while providing views of the historical Douglas firs. <\/span> <em><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">Photo courtesy Tim Griffith <\/span><\/em><\/figcaption><\/figure>\n<p>The newly built Founders Hall in the Foster School of Business at Washington University (UW), Seattle, is a six-story mass timber building that will store more than 1000 tons (2000 lbs) of CO<sub>2<\/sub> for decades, keeping carbon out of the atmosphere for the lifetime of the building.<\/p>\n<p>Aureus Earth, the world\u2019s leading provider of carbon offsetting incentive programs for the construction industry, announced a couple of months back its first transaction valuing the long-term biogenic carbon storage in a mass timber building. The transaction was accomplished in partnership with the Foster School of Business, using the newly completed Founders Hall mass timber building as a proof of concept.<\/p>\n<p>Designed by LMN Architects, the building is spread over 7878-m<sup>2<\/sup> (84,800 sf), and it incorporates a mass timber structure\u2014cross-laminated timber floors with glulam post and beam\u2014reducing the carbon emissions by over 90 percent, and embodied carbon by almost 60 percent (in the structure, envelope, and interiors).<\/p>\n<figure id=\"attachment_202372\" aria-describedby=\"caption-attachment-202372\" style=\"width: 331px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-202372\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_2-300x225.jpg\" alt=\"\" width=\"331\" height=\"248\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_2-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_2-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_2-768x576.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_2.jpg 1024w\" sizes=\"auto, (max-width: 331px) 100vw, 331px\" \/><\/a><figcaption id=\"caption-attachment-202372\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> The interior of the building showing the mass timber structure\u2014cross-laminated timber floors with glulam post and beam\u2014and the stainless steel and wood staircase. <\/span> <em><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">Photo courtesy Tim Griffith <\/span><\/em><\/figcaption><\/figure>\n<p>The building\u2019s design takes advantage of Seattle\u2019s weather by integrating natural and mechanical ventilation, with night flush in office spaces, to provide a comfortable environment for the building\u2019s users with minimal reliance on air conditioning. The peeled-away brick fa\u00e7ade paired with carefully placed high performance glazing (with low air infiltration, 0.06 cfm\/sf) exposes the timber inside the building while providing views of the historical Douglas firs, giving the higher floors of the building an immersive experience with the northwest forest character of the site.<\/p>\n<p>Other materials used in the building are the concrete shear cores, and steel long-span beams in classrooms. Further sustainability features are reliance on fossil-fuel-free operations, by not using the campus steam system, 79 percent projected energy use reduction, 53 percent water use reduction, native and drought-resistance plantings, bike commuting facilities, and a solar-ready roof.<br \/>\n\u201cFounders Hall \u2026 adds a significant focus on operational and environmental performance with a 92 percent reduction in operational carbon. This achievement is a testament to the strong shared vision that we developed with the University of Washington, Foster School of Business leadership, our design-build team led by Hoffman Construction, and the amazing collaboration with users, university staff, designers, and trade partners,\u201d comments Robert Smith, principal, LMN Architects.<\/p>\n<p>Some of the other firms involved in the project were Magnusson Klemencic Associates with Katerra, Carla Keel, and Autoscan for structural engineering services; the civil engineer, Mayfly Engineering &amp; Design, PLLC; lighting designer, HLB Lighting Design; mechanical and electrical engineer, PAE Consulting Engineers, Inc.; plumbing engineer, Burman Design; accessibility designer, Studio Pacifica; and envelope consultants Morrison Hershfield with McClintock Fa\u00e7ade Consulting.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The newly built Founders Hall in the Foster School of Business at Washington University (UW), Seattle, is a six-story mass timber building that will store more than 1000 tons (2000 lbs) of CO2 for decades, keeping carbon out of the atmosphere for the lifetime of the building.<\/p>\n","protected":false},"author":29853,"featured_media":202373,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[7644,7646,2064,5616,7645,2478,6073,3325,7647,6904,601,3309,7648],"class_list":["post-202369","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-carbon-storage","tag-co2","tag-cross-laminated-timber","tag-embodied-carbon","tag-founders-hall","tag-mass-timber","tag-operational-carbon","tag-seattle","tag-staircase","tag-structure","tag-sustainability","tag-washington","tag-washington-university","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"Washington University (UW)&#039;s new mass timber building will store more than 1000 tons (2000 lbs) of CO2 for decades.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Washington University (UW)&#039;s new mass timber building will store more than 1000 tons (2000 lbs) of CO2 for decades.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2022-11-07T22:21:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-11-08T20:53:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1_F.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"arslan_ahmed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"arslan_ahmed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/\"},\"author\":{\"name\":\"arslan_ahmed\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\"},\"headline\":\"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime\",\"datePublished\":\"2022-11-07T22:21:18+00:00\",\"dateModified\":\"2022-11-08T20:53:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/\"},\"wordCount\":519,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/AA_LMNArchitectsWashington_1_F.jpg\",\"keywords\":[\"carbon storage\",\"CO2\",\"Cross-laminated timber\",\"Embodied carbon\",\"Founders Hall\",\"Mass Timber\",\"Operational carbon\",\"Seattle\",\"staircase\",\"structure\",\"Sustainability\",\"Washington\",\"Washington University\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/\",\"name\":\"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/AA_LMNArchitectsWashington_1_F.jpg\",\"datePublished\":\"2022-11-07T22:21:18+00:00\",\"dateModified\":\"2022-11-08T20:53:38+00:00\",\"description\":\"Washington University (UW)'s new mass timber building will store more than 1000 tons (2000 lbs) of CO2 for decades.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/AA_LMNArchitectsWashington_1_F.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/11\\\/AA_LMNArchitectsWashington_1_F.jpg\",\"width\":400,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\",\"name\":\"arslan_ahmed\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"caption\":\"arslan_ahmed\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/arslan_ahmed\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime - The Construction Specifier","description":"Washington University (UW)'s new mass timber building will store more than 1000 tons (2000 lbs) of CO2 for decades.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/","og_locale":"en_US","og_type":"article","og_title":"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime - The Construction Specifier","og_description":"Washington University (UW)'s new mass timber building will store more than 1000 tons (2000 lbs) of CO2 for decades.","og_url":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/","og_site_name":"The Construction Specifier","article_published_time":"2022-11-07T22:21:18+00:00","article_modified_time":"2022-11-08T20:53:38+00:00","og_image":[{"width":400,"height":200,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1_F.jpg","type":"image\/jpeg"}],"author":"arslan_ahmed","twitter_card":"summary_large_image","twitter_misc":{"Written by":"arslan_ahmed","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/"},"author":{"name":"arslan_ahmed","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502"},"headline":"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime","datePublished":"2022-11-07T22:21:18+00:00","dateModified":"2022-11-08T20:53:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/"},"wordCount":519,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1_F.jpg","keywords":["carbon storage","CO2","Cross-laminated timber","Embodied carbon","Founders Hall","Mass Timber","Operational carbon","Seattle","staircase","structure","Sustainability","Washington","Washington University"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/","url":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/","name":"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1_F.jpg","datePublished":"2022-11-07T22:21:18+00:00","dateModified":"2022-11-08T20:53:38+00:00","description":"Washington University (UW)'s new mass timber building will store more than 1000 tons (2000 lbs) of CO2 for decades.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1_F.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/11\/AA_LMNArchitectsWashington_1_F.jpg","width":400,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/uws-new-mass-timber-hall-will-store-carbon-through-buildings-lifetime\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"UW\u2019s new mass timber hall will store carbon through building\u2019s lifetime"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502","name":"arslan_ahmed","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","caption":"arslan_ahmed"},"url":"https:\/\/www.constructionspecifier.com\/author\/arslan_ahmed\/"}]}},"views":6352,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/202369","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/29853"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=202369"}],"version-history":[{"count":2,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/202369\/revisions"}],"predecessor-version":[{"id":202374,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/202369\/revisions\/202374"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/202373"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=202369"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=202369"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=202369"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}