{"id":202799,"date":"2022-12-12T17:45:39","date_gmt":"2022-12-12T22:45:39","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=202799"},"modified":"2022-12-13T12:08:06","modified_gmt":"2022-12-13T17:08:06","slug":"20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/","title":{"rendered":"$20B Intel Ohio project to utilize extensive quantities of steel and concrete"},"content":{"rendered":"<figure id=\"attachment_202801\" aria-describedby=\"caption-attachment-202801\" style=\"width: 334px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-202801\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1-300x188.jpg\" alt=\"\" width=\"334\" height=\"209\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1-300x188.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1-500x313.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1-768x480.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1.jpg 1024w\" sizes=\"auto, (max-width: 334px) 100vw, 334px\" \/><\/a><figcaption id=\"caption-attachment-202801\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> A rendering of the $20 billion Intel Ohio project, a total of 232,258 m2 (2.5 m sf) of Intel Corporation\u2019s semiconductor manufacturing facilities, including 55,742 m2 (600,000 sf) of cleanrooms, in New Albany, Licking County, Ohio.<\/span> <em><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">Photo courtesy Intel Corporation. <\/span><\/em><\/figcaption><\/figure>\n<p>The construction of two semiconductor manufacturing facilities under the $20 billion Intel Ohio project, in New Albany, Licking County, Ohio, will require as much steel as eight Eiffel Towers and as much concrete as the world\u2019s tallest skyscrapers.<\/p>\n<p>Phase 1 of the construction of the two new facilities, spanning over a total of 232,258 m<sup><strong>2<\/strong><\/sup> (2.5 m sf), including 55,742 m<sup>2<\/sup> (600,000 sf) of cleanrooms, will be managed by the engineering, construction, and project management (EPC) firm Bechtel Corporation. The facilities will produce Intel\u2019s leading-edge chips, boosting production to meet increasing demand for advanced semiconductors.<\/p>\n<p>Intel\u2019s investment will strengthen future economic development in the region and transform it into the \u201cSilicon Heartland\u201d as an entire supply chain is developed to deliver these facilities, including engineers, construction leadership, and craft professionals.<\/p>\n<figure id=\"attachment_202800\" aria-describedby=\"caption-attachment-202800\" style=\"width: 360px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-202800\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_2-300x200.jpg\" alt=\"\" width=\"360\" height=\"240\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_2-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_2-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_2-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_2.jpg 1024w\" sizes=\"auto, (max-width: 360px) 100vw, 360px\" \/><\/a><figcaption id=\"caption-attachment-202800\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> President Joe Biden attended the ground-breaking ceremony of the Intel Ohio Project Phase 1. <\/span> <em><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">Photo courtesy Intel Coporation. <\/span><\/em><\/figcaption><\/figure>\n<p>Bechtel will partner with the North America&#8217;s Building Trades Unions and suppliers to create new construction jobs, and work with local education organizations to implement training programs.<\/p>\n<p>\u201cBechtel is proud to work with Intel and the people of Ohio to reclaim U.S. semiconductor manufacturing,\u201d said Catherine Hunt Ryan, president of Bechtel\u2019s manufacturing and technology business. \u201cA project of this complexity and magnitude\u2014with an outsized impact on the community and economy\u2014is the type of work Bechtel is uniquely positioned to deliver. We are honored to be chosen by Intel as its partner and we are ready to build their most advanced semiconductor facilities in the world.\u201d<\/p>\n<p>\u201cIntel has chosen Bechtel to deliver our largest construction project to date, advancing our mission to create a more sustainable, resilient, and geographically balanced supply of silicon,\u201d said Jackie Sturm corporate vice president, global supply chain operations at Intel Corporation. \u201cBechtel has decades of world class expertise in complex global construction projects, leveraging a deeply experienced team, critical craft support and robust analytics platforms. Their relentless focus on safety, quality and innovation aligns with Intel key values. We look forward to building the future of U.S. semiconductor manufacturing together.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Construction of two semiconductor manufacturing facilities under the $20 billion Intel Ohio project, in New Albany, Licking County, Ohio, will require as much steel as eight Eiffel Towers and as much concrete as the world\u2019s tallest skyscrapers.<\/p>\n","protected":false},"author":29853,"featured_media":202803,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[7817,1337,1301,1338,7819,7820,7815,1248,7816,3310,7813,1384,7814,7818,6669],"class_list":["post-202799","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-bechtel","tag-construction","tag-design","tag-engineering","tag-epc","tag-intel-ohio","tag-licking-county","tag-manufacturing","tag-new-albany","tag-ohio","tag-phase-1","tag-project-management","tag-semiconductor","tag-silicon","tag-u-s","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>$20B Intel Ohio project to utilize extensive quantities of steel and concrete - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"Phase 1 of the $20 B Intel Ohio project will require as much steel as eight Eiffel Towers and as much concrete as the tallest skyscrapers.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"$20B Intel Ohio project to utilize extensive quantities of steel and concrete - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Phase 1 of the $20 B Intel Ohio project will require as much steel as eight Eiffel Towers and as much concrete as the tallest skyscrapers.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2022-12-12T22:45:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-12-13T17:08:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1_F.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"arslan_ahmed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"arslan_ahmed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/\"},\"author\":{\"name\":\"arslan_ahmed\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\"},\"headline\":\"$20B Intel Ohio project to utilize extensive quantities of steel and concrete\",\"datePublished\":\"2022-12-12T22:45:39+00:00\",\"dateModified\":\"2022-12-13T17:08:06+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/\"},\"wordCount\":406,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/AA_IntelChipOhio_1_F.jpg\",\"keywords\":[\"Bechtel\",\"Construction\",\"Design\",\"Engineering\",\"EPC\",\"Intel Ohio\",\"Licking County\",\"Manufacturing\",\"New Albany\",\"Ohio\",\"Phase 1\",\"project management\",\"semiconductor\",\"silicon\",\"U.S.\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/\",\"name\":\"$20B Intel Ohio project to utilize extensive quantities of steel and concrete - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/AA_IntelChipOhio_1_F.jpg\",\"datePublished\":\"2022-12-12T22:45:39+00:00\",\"dateModified\":\"2022-12-13T17:08:06+00:00\",\"description\":\"Phase 1 of the $20 B Intel Ohio project will require as much steel as eight Eiffel Towers and as much concrete as the tallest skyscrapers.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/AA_IntelChipOhio_1_F.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2022\\\/12\\\/AA_IntelChipOhio_1_F.jpg\",\"width\":400,\"height\":200,\"caption\":\"A rendering shows plans for two new leading-edge Intel processor factories in Licking County, Ohio. Announced in January 2022, the $20 billion project spans nearly 1,000 acres and is the largest single private-sector investment in Ohio history. Production may begin as soon as 2025. (Credit: Intel Corporation)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"$20B Intel Ohio project to utilize extensive quantities of steel and concrete\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\",\"name\":\"arslan_ahmed\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"caption\":\"arslan_ahmed\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/arslan_ahmed\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"$20B Intel Ohio project to utilize extensive quantities of steel and concrete - The Construction Specifier","description":"Phase 1 of the $20 B Intel Ohio project will require as much steel as eight Eiffel Towers and as much concrete as the tallest skyscrapers.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/","og_locale":"en_US","og_type":"article","og_title":"$20B Intel Ohio project to utilize extensive quantities of steel and concrete - The Construction Specifier","og_description":"Phase 1 of the $20 B Intel Ohio project will require as much steel as eight Eiffel Towers and as much concrete as the tallest skyscrapers.","og_url":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/","og_site_name":"The Construction Specifier","article_published_time":"2022-12-12T22:45:39+00:00","article_modified_time":"2022-12-13T17:08:06+00:00","og_image":[{"width":400,"height":200,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1_F.jpg","type":"image\/jpeg"}],"author":"arslan_ahmed","twitter_card":"summary_large_image","twitter_misc":{"Written by":"arslan_ahmed","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/"},"author":{"name":"arslan_ahmed","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502"},"headline":"$20B Intel Ohio project to utilize extensive quantities of steel and concrete","datePublished":"2022-12-12T22:45:39+00:00","dateModified":"2022-12-13T17:08:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/"},"wordCount":406,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1_F.jpg","keywords":["Bechtel","Construction","Design","Engineering","EPC","Intel Ohio","Licking County","Manufacturing","New Albany","Ohio","Phase 1","project management","semiconductor","silicon","U.S."],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/","url":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/","name":"$20B Intel Ohio project to utilize extensive quantities of steel and concrete - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1_F.jpg","datePublished":"2022-12-12T22:45:39+00:00","dateModified":"2022-12-13T17:08:06+00:00","description":"Phase 1 of the $20 B Intel Ohio project will require as much steel as eight Eiffel Towers and as much concrete as the tallest skyscrapers.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1_F.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2022\/12\/AA_IntelChipOhio_1_F.jpg","width":400,"height":200,"caption":"A rendering shows plans for two new leading-edge Intel processor factories in Licking County, Ohio. Announced in January 2022, the $20 billion project spans nearly 1,000 acres and is the largest single private-sector investment in Ohio history. Production may begin as soon as 2025. (Credit: Intel Corporation)"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/20b-intel-ohio-project-to-utilize-extensive-quantities-of-steel-and-concrete\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"$20B Intel Ohio project to utilize extensive quantities of steel and concrete"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502","name":"arslan_ahmed","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","caption":"arslan_ahmed"},"url":"https:\/\/www.constructionspecifier.com\/author\/arslan_ahmed\/"}]}},"views":7561,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/202799","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/29853"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=202799"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/202799\/revisions"}],"predecessor-version":[{"id":202810,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/202799\/revisions\/202810"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/202803"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=202799"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=202799"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=202799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}