{"id":203250,"date":"2023-01-16T14:09:58","date_gmt":"2023-01-16T19:09:58","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=203250"},"modified":"2023-01-16T14:09:58","modified_gmt":"2023-01-16T19:09:58","slug":"portland-housing-project-opts-for-sustainability-first-design-strategies","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/","title":{"rendered":"Portland housing project opts for sustainability-first design strategies"},"content":{"rendered":"<figure id=\"attachment_203251\" aria-describedby=\"caption-attachment-203251\" style=\"width: 382px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-203251\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_1-300x200.jpg\" alt=\"\" width=\"382\" height=\"254\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_1-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_1-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_1-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_1.jpg 800w\" sizes=\"auto, (max-width: 382px) 100vw, 382px\" \/><\/a><figcaption id=\"caption-attachment-203251\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> Aimed at receiving Earth Advantage Platinum certification\u2014based on energy efficiency, optimal land use, sensible water technology, and sustainable materials benchmarks\u2014a housing project in Portland has incorporated cost-saving and cost-efficient methods into its design. <\/span><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em>Renderings courtesy Hacker Architects <\/em><\/span><\/figcaption><\/figure>\n<p>Aimed at receiving Earth Advantage Platinum certification\u2014based on energy efficiency, optimal land use, sensible water technology, and sustainable materials benchmarks\u2014a housing project in Portland has incorporated cost-saving and cost-efficient methods into its design.<\/p>\n<p>The strategies include optimizing building plan dimensions and floor-to-floor heights to minimize wood-framing and gyp-board waste, structural design eliminating the need for a more expensive post-tensioned concrete slab, and thoughtful placement of exterior glazing to optimize the overall window-to-wall ratio.<\/p>\n<p>The project, located in Cully Neighborhood on Killingsworth Street, is a collaboration between Portland Community College (PCC) and Home Forward, a public corporation contracted with the federal government to administer housing programs. Hacker Architects completed the design of the four-story, 8152-m<sup>2<\/sup> (87,742-sf) housing development. Other collaborators on the project are the contractor, O\u2019Neill\/Walsh Construction, the landscape designer, PLACE, the civil engineer, VEGA Civil Engineering LLC, structural engineer, ABHT Structural Engineers, mechanical and plumbing engineer; as well as electrical engineer, lighting designer, O-LLC, acoustical engineer, Listen Acoustics, signage and wayfinding designer, Ambrosini Design, code and accessibility consultant, Code Unlimited, and specifier firm, m.thrailkill.architect.llc<\/p>\n<figure id=\"attachment_203252\" aria-describedby=\"caption-attachment-203252\" style=\"width: 363px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-203252\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_2-300x198.jpg\" alt=\"\" width=\"363\" height=\"240\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_2-300x198.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_2-500x330.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_2-768x507.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_2.jpg 800w\" sizes=\"auto, (max-width: 363px) 100vw, 363px\" \/><\/a><figcaption id=\"caption-attachment-203252\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> The interior lobby area of the apartment building. <\/span><\/figcaption><\/figure>\n<p>The project will provide 84 economically and family-friendly apartments, serving a resident population at or below 60 percent median family income. The units will prioritize flexibility and comfort, and support a variety of living situations for tenants with different needs, including adequate room for families and single parents, as well as bedroom schemes for multiple adult roommates.<\/p>\n<p>The site also houses PCC\u2019s new Opportunity Center and a childcare center\u2014both of which will be resources for residents. The 1.21-ha (3-acre) site design strives to balance the sensitive transition of a larger housing project with the surrounding neighborhoods, while simultaneously maintaining an active public scale and providing a civic permanence.<\/p>\n<p>A public plaza will connect the two centers with a space to host community gardens, job fairs, farmer\u2019s markets, and other neighborhood gatherings serving residents and PCC students.<\/p>\n<figure id=\"attachment_203253\" aria-describedby=\"caption-attachment-203253\" style=\"width: 355px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-203253\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_3-300x191.jpg\" alt=\"\" width=\"355\" height=\"226\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_3-300x191.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_3-500x318.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_3-768x489.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_3.jpg 800w\" sizes=\"auto, (max-width: 355px) 100vw, 355px\" \/><\/a><figcaption id=\"caption-attachment-203253\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> Aerial view showing the layout of the housing with a courtyard in between. The layout aims to activate the street fronts. <\/span><\/figcaption><\/figure>\n<p>Simple gabled forms are arranged to create a pair of private courtyards and to activate Killingsworth Street, along with a \u2018plaza street\u2019 shared with the new Opportunity Center. These agrarian and unassuming forms, combined with a playful pattern of textured metal siding, will break down the overall massing and add visual interest referencing the unique character of the neighborhood.<\/p>\n<p>The project\u2019s expected completion date is August 2024.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Aimed at receiving Earth Advantage Platinum certification\u2014based on energy efficiency, optimal land use, sensible water technology, and sustainable materials benchmarks\u2014a housing project in Portland has incorporated cost-saving and cost-efficient methods into its design.<\/p>\n","protected":false},"author":29853,"featured_media":203255,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[6688,906,7954,1301,7955,5639,3534,3312,3081,6611,601],"class_list":["post-203250","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-apartments","tag-certification","tag-cully-neighborhood","tag-design","tag-earth-advantage-platinum","tag-hacker-architects","tag-housing","tag-oregon","tag-portland","tag-project","tag-sustainability","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Portland housing project opts for sustainability-first design strategies - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"Aimed at Earth Advantage Platinum certification, a housing project design in Portland has incorporated cost-saving, cost-efficient methods.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Portland housing project opts for sustainability-first design strategies - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Aimed at Earth Advantage Platinum certification, a housing project design in Portland has incorporated cost-saving, cost-efficient methods.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-16T19:09:58+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_F.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"arslan_ahmed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"arslan_ahmed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/\"},\"author\":{\"name\":\"arslan_ahmed\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\"},\"headline\":\"Portland housing project opts for sustainability-first design strategies\",\"datePublished\":\"2023-01-16T19:09:58+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/\"},\"wordCount\":483,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/AA_PortlandApartments_F.jpg\",\"keywords\":[\"apartments\",\"certification\",\"Cully Neighborhood\",\"Design\",\"Earth Advantage Platinum\",\"Hacker Architects\",\"housing\",\"Oregon\",\"Portland\",\"project\",\"Sustainability\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/\",\"name\":\"Portland housing project opts for sustainability-first design strategies - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/AA_PortlandApartments_F.jpg\",\"datePublished\":\"2023-01-16T19:09:58+00:00\",\"description\":\"Aimed at Earth Advantage Platinum certification, a housing project design in Portland has incorporated cost-saving, cost-efficient methods.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/AA_PortlandApartments_F.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/AA_PortlandApartments_F.jpg\",\"width\":400,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-housing-project-opts-for-sustainability-first-design-strategies\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Portland housing project opts for sustainability-first design strategies\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\",\"name\":\"arslan_ahmed\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"caption\":\"arslan_ahmed\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/arslan_ahmed\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Portland housing project opts for sustainability-first design strategies - The Construction Specifier","description":"Aimed at Earth Advantage Platinum certification, a housing project design in Portland has incorporated cost-saving, cost-efficient methods.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/","og_locale":"en_US","og_type":"article","og_title":"Portland housing project opts for sustainability-first design strategies - The Construction Specifier","og_description":"Aimed at Earth Advantage Platinum certification, a housing project design in Portland has incorporated cost-saving, cost-efficient methods.","og_url":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/","og_site_name":"The Construction Specifier","article_published_time":"2023-01-16T19:09:58+00:00","og_image":[{"width":400,"height":200,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_F.jpg","type":"image\/jpeg"}],"author":"arslan_ahmed","twitter_card":"summary_large_image","twitter_misc":{"Written by":"arslan_ahmed","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/"},"author":{"name":"arslan_ahmed","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502"},"headline":"Portland housing project opts for sustainability-first design strategies","datePublished":"2023-01-16T19:09:58+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/"},"wordCount":483,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_F.jpg","keywords":["apartments","certification","Cully Neighborhood","Design","Earth Advantage Platinum","Hacker Architects","housing","Oregon","Portland","project","Sustainability"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/","url":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/","name":"Portland housing project opts for sustainability-first design strategies - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_F.jpg","datePublished":"2023-01-16T19:09:58+00:00","description":"Aimed at Earth Advantage Platinum certification, a housing project design in Portland has incorporated cost-saving, cost-efficient methods.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_F.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandApartments_F.jpg","width":400,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/portland-housing-project-opts-for-sustainability-first-design-strategies\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Portland housing project opts for sustainability-first design strategies"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502","name":"arslan_ahmed","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","caption":"arslan_ahmed"},"url":"https:\/\/www.constructionspecifier.com\/author\/arslan_ahmed\/"}]}},"views":5206,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/203250","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/29853"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=203250"}],"version-history":[{"count":2,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/203250\/revisions"}],"predecessor-version":[{"id":203256,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/203250\/revisions\/203256"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/203255"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=203250"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=203250"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=203250"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}