{"id":203262,"date":"2023-01-16T14:41:16","date_gmt":"2023-01-16T19:41:16","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=203262"},"modified":"2023-01-16T14:41:16","modified_gmt":"2023-01-16T19:41:16","slug":"firm-lands-100m-maine-museum-project-after-winning-international-design-competition","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/","title":{"rendered":"Firm lands $100M Maine museum project after winning international design competition"},"content":{"rendered":"<figure id=\"attachment_203264\" aria-describedby=\"caption-attachment-203264\" style=\"width: 356px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-203264\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_1-300x200.jpg\" alt=\"\" width=\"356\" height=\"237\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_1-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_1-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_1-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_1.jpg 1024w\" sizes=\"auto, (max-width: 356px) 100vw, 356px\" \/><\/a><figcaption id=\"caption-attachment-203264\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> LEVER Architecture, based in Portland and Los Angeles, has been selected as the design architect for the $100 million campus expansion and unification project for the Portland Museum of Art (PMA) in Maine. <\/span><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em> Renderings courtesy DarcStudio <\/em><\/span><\/figcaption><\/figure>\n<p>LEVER Architecture, based in Portland and Los Angeles, has been selected as the design architect for the $100 million campus expansion and unification project for the Portland Museum of Art (PMA) in Maine.<\/p>\n<p>LEVER Architecture was selected through a juried international design competition, led by Dovetail Design Strategists, attracting submissions from 104 teams representing 20 countries. The submissions were narrowed down to four finalists who developed concept designs for a public concept design gallery and comment period. In addition to LEVER, the finalists were: Adjaye Associates, MVRDV and Toshiko Mori Architects + Johnston Marklee + Preston Scott Cohen.<\/p>\n<div class=\"mceTemp\"><\/div>\n<p>LEVER Architecture\u2019s winning concept imagines the PMA campus unified through an innovative, sustainable building, knitting together the already-existing campus of four architecturally significant downtown Portland properties. The design\u2014proposed primarily from sustainable mass timber, one of LEVER\u2019s defining characteristics\u2014will add 5574 m<sup>2<\/sup> (60,000 sf) of flexible, community, gallery, and public space, enabling 300,000 to 500,000 visitors per year.<\/p>\n<figure id=\"attachment_203265\" aria-describedby=\"caption-attachment-203265\" style=\"width: 353px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-203265\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_2-300x200.jpg\" alt=\"\" width=\"353\" height=\"235\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_2-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_2-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_2-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_2.jpg 1024w\" sizes=\"auto, (max-width: 353px) 100vw, 353px\" \/><\/a><figcaption id=\"caption-attachment-203265\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> LEVER\u2019s concept imagines a new building made from mass timber, terracotta, and glass, and includes nods to Maine communities, history, and culture. The curved roofline is designed to frame the sun as it rises and sets, in honor of Maine\u2019s Wabanaki communities and the land they call Wabanakik, or Dawnland.<\/span><\/figcaption><\/figure>\n<p>LEVER\u2019s concept imagines a new building made from mass timber, terracotta, and glass, and includes nods to Maine communities, history, and culture. The curved roofline is designed to frame the sun as it rises and sets, in honor of Maine\u2019s Wabanaki communities and the land they call Wabanakik, or Dawnland.<\/p>\n<div class=\"mceTemp\"><\/div>\n<p>The timber used in LEVER\u2019s design speaks to the state\u2019s lumber industry heritage, while reimagining its future as a hallmark of environmental stewardship; much in the same way the PMA\u2019s other buildings embody their time and place and reflect other aspects of Maine\u2019s history. Other sustainable building materials and practices, such as geothermal energy, will be explored as the project moves into future phases.<\/p>\n<figure id=\"attachment_203266\" aria-describedby=\"caption-attachment-203266\" style=\"width: 340px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-203266\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_3-300x300.jpg\" alt=\"\" width=\"340\" height=\"340\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_3-300x300.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_3-500x500.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_3-150x150.jpg 150w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_3-768x768.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_3.jpg 1024w\" sizes=\"auto, (max-width: 340px) 100vw, 340px\" \/><\/a><figcaption id=\"caption-attachment-203266\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"> Rendering of the interior of the museum expansion.<\/span><\/figcaption><\/figure>\n<p>\u201cThis is one of the most significant moments in the PMA\u2019s 140-year history,\u201d says Mark Bessire, the Judy and Leonard Lauder director of the Portland Museum of Art. \u201cLEVER, and the team they have assembled, have demonstrated that they care deeply about our region\u2019s future, our unique arts culture, and the needs of our community. They share our values of courage, equity, service, sustainability, and trust, and we can\u2019t wait to get to work with LEVER and our communities to imagine Maine\u2019s next great landmark.\u201d<\/p>\n<p>The full design team includes:<\/p>\n<ul>\n<li>LEVER Architecture: Design architect<\/li>\n<li>Simons Architects: Executive architect<\/li>\n<li>Unknown Studio: Landscape architect<\/li>\n<li>Chris Newell, Akomawt Educational Initiative: Indigenous inclusion advisor<\/li>\n<li>Openbox: Equity, inclusion, and cultural consultant<\/li>\n<li>Once-Future Office: Signage, graphics, and wayfinding consultant<\/li>\n<li>Studio Pacifica: accessibility and universal design consultant<\/li>\n<li>Atelier Ten: Sustainability consultant<\/li>\n<li>Guy Nordenson and Associates: Structural design engineer<\/li>\n<li>Thornton Tomasetti: Structural engineer of record and sustainability\/LCA Modeling<\/li>\n<li>Altieri Sebor Wieber: MEP\/FP engineer<\/li>\n<li>Arup: Lighting, acoustical, theater, security, and AV\/IT engineer<\/li>\n<li>Woodard and Curran: Civil engineer<\/li>\n<li>Simpson Gumpertz and Heger: Building enclosure consultan<\/li>\n<li>Stuart Lynn: Cost consultant<\/li>\n<li>Openbox: Video production<\/li>\n<li>Darcstudio: Renderings<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>LEVER Architecture, based in Portland and Los Angeles, has been selected as the design architect for the $100 million campus expansion and unification project for the Portland Museum of Art (PMA) in Maine.<\/p>\n","protected":false},"author":29853,"featured_media":203268,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[3167,4896,3016,1301,3075,7961,6635,7960,3258,3175,2478,7959,3637,601],"class_list":["post-203262","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-architect","tag-campus","tag-carbon","tag-design","tag-expansion","tag-geothermal-energy","tag-history","tag-lever-architecture","tag-lumber","tag-maine","tag-mass-timber","tag-portland-museum-of-art","tag-renovation","tag-sustainability","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Firm lands $100M Maine museum project after winning international design competition - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"LEVER Architecture has been selected for the $100 million campus expansion and unification project for the Portland Museum of Art in Maine.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Firm lands $100M Maine museum project after winning international design competition - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"LEVER Architecture has been selected for the $100 million campus expansion and unification project for the Portland Museum of Art in Maine.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-16T19:41:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_F.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"arslan_ahmed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"arslan_ahmed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/\"},\"author\":{\"name\":\"arslan_ahmed\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\"},\"headline\":\"Firm lands $100M Maine museum project after winning international design competition\",\"datePublished\":\"2023-01-16T19:41:16+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/\"},\"wordCount\":588,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/AA_PortlandMuseumMaine_F.jpg\",\"keywords\":[\"Architect\",\"campus\",\"carbon\",\"Design\",\"Expansion\",\"geothermal energy\",\"history\",\"LEVER Architecture\",\"lumber\",\"Maine\",\"Mass Timber\",\"Portland Museum of Art\",\"Renovation\",\"Sustainability\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/\",\"name\":\"Firm lands $100M Maine museum project after winning international design competition - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/AA_PortlandMuseumMaine_F.jpg\",\"datePublished\":\"2023-01-16T19:41:16+00:00\",\"description\":\"LEVER Architecture has been selected for the $100 million campus expansion and unification project for the Portland Museum of Art in Maine.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/AA_PortlandMuseumMaine_F.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/01\\\/AA_PortlandMuseumMaine_F.jpg\",\"width\":400,\"height\":200},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Firm lands $100M Maine museum project after winning international design competition\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\",\"name\":\"arslan_ahmed\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"caption\":\"arslan_ahmed\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/arslan_ahmed\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Firm lands $100M Maine museum project after winning international design competition - The Construction Specifier","description":"LEVER Architecture has been selected for the $100 million campus expansion and unification project for the Portland Museum of Art in Maine.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/","og_locale":"en_US","og_type":"article","og_title":"Firm lands $100M Maine museum project after winning international design competition - The Construction Specifier","og_description":"LEVER Architecture has been selected for the $100 million campus expansion and unification project for the Portland Museum of Art in Maine.","og_url":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/","og_site_name":"The Construction Specifier","article_published_time":"2023-01-16T19:41:16+00:00","og_image":[{"width":400,"height":200,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_F.jpg","type":"image\/jpeg"}],"author":"arslan_ahmed","twitter_card":"summary_large_image","twitter_misc":{"Written by":"arslan_ahmed","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/"},"author":{"name":"arslan_ahmed","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502"},"headline":"Firm lands $100M Maine museum project after winning international design competition","datePublished":"2023-01-16T19:41:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/"},"wordCount":588,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_F.jpg","keywords":["Architect","campus","carbon","Design","Expansion","geothermal energy","history","LEVER Architecture","lumber","Maine","Mass Timber","Portland Museum of Art","Renovation","Sustainability"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/","url":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/","name":"Firm lands $100M Maine museum project after winning international design competition - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_F.jpg","datePublished":"2023-01-16T19:41:16+00:00","description":"LEVER Architecture has been selected for the $100 million campus expansion and unification project for the Portland Museum of Art in Maine.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_F.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/01\/AA_PortlandMuseumMaine_F.jpg","width":400,"height":200},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/firm-lands-100m-maine-museum-project-after-winning-international-design-competition\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Firm lands $100M Maine museum project after winning international design competition"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502","name":"arslan_ahmed","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","caption":"arslan_ahmed"},"url":"https:\/\/www.constructionspecifier.com\/author\/arslan_ahmed\/"}]}},"views":4773,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/203262","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/29853"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=203262"}],"version-history":[{"count":4,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/203262\/revisions"}],"predecessor-version":[{"id":203270,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/203262\/revisions\/203270"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/203268"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=203262"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=203262"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=203262"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}