{"id":207524,"date":"2023-12-18T08:29:43","date_gmt":"2023-12-18T13:29:43","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=207524"},"modified":"2023-12-18T16:21:30","modified_gmt":"2023-12-18T21:21:30","slug":"adaptive-reuse-nyc-heritage-ferry-terminal","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/","title":{"rendered":"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal"},"content":{"rendered":"<figure id=\"attachment_207531\" aria-describedby=\"caption-attachment-207531\" style=\"width: 411px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1.gif\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207531\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1-300x211.gif\" alt=\"A view of the Battery Maritime Building \" width=\"411\" height=\"289\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1-300x211.gif 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1-500x352.gif 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1-768x540.gif 768w\" sizes=\"auto, (max-width: 411px) 100vw, 411px\" \/><\/a><figcaption id=\"caption-attachment-207531\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">The design firm, Marvel, served as the lead architect on the transformation of the terminal into a historically sensitive multi-use event and hospitality venue. <\/span><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em> Photo courtesy \u00a9Marvel <\/em><\/span><\/figcaption><\/figure>\n<p>New York City&#8217;s Battery Maritime Building (BMB), the city&#8217;s last working historic ferry terminal\u2014dating back to 1909 and enjoying heritage status since 1976\u2014has been transformed into a luxury hospitality destination, preserving its unique historical charm through meticulous restoration.<\/p>\n<p>The design firm, Marvel, served as the lead architect on the transformation of the terminal into a historically sensitive multi-use event and hospitality venue. Today, the 15,050-m<sup>2<\/sup> (162,000-sf) facility is reinvigorated by its various new functions.<\/p>\n<p>Situated at the foot of Broadway, the BMB is one of the most iconic sites on the Manhattan Island. Constructed in 1909, the Beaux-Arts Structural Expressionist structure, conceived by Walker &amp; Morris as a public ferry terminal, gained recognition early in its existence. In 1966, the BMB was nominated as an individual landmark by the Landmark Preservation Commission, and later, in 1976, it was added to the National Register of Historic Places.<\/p>\n<figure id=\"attachment_207530\" aria-describedby=\"caption-attachment-207530\" style=\"width: 409px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding2.gif\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207530\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding2-300x203.gif\" alt=\"A view of the fifth floor\" width=\"409\" height=\"276\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding2-300x203.gif 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding2-500x339.gif 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding2-768x521.gif 768w\" sizes=\"auto, (max-width: 409px) 100vw, 409px\" \/><\/a><figcaption id=\"caption-attachment-207530\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">The addition of a modern glass fifth floor, reflecting the sky, allows the cupolas and pergolas to stand out, faithfully reconstructing the original silhouette of the Battery Maritime Building (BMB). <\/span><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em> Photo courtesy \u00a9Marvel <\/em><\/span><\/figcaption><\/figure>\n<p>Marvel&#8217;s approach aimed not only to recreate the lost historic elements like the cupola, spire, and pergola features of the front fa\u00e7ade, but also to restore their visual impact on the skyline. The addition of a modern glass fifth floor, reflecting the sky, allows the cupolas and pergolas to stand out, faithfully reconstructing the original silhouette of the building.<\/p>\n<p>The Great Hall, initially a waiting room for ferry passengers, has undergone a complete restoration, including the reconstruction of its centerpiece 39.6-m (130-ft)-long historic glass laylight. Today, it serves as an event space.<\/p>\n<p>The ground floor now accommodates ferry access, a port cochere driveway, and elegant new lobbies with a ceremonial stair. The second floor has been transformed into an events venue, featuring the 836 m\u00b2 (9,000-sf) Great Hall. The third and fourth floors were rebuilt to house a 47-room boutique hotel. Finally, the fifth floor hosts a membership club with a jazz club, bars, and a restaurant, offering sweeping views of the Upper Hudson Bay.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>New York City&#8217;s Battery Maritime Building (BMB), the city&#8217;s last working historic ferry terminal\u2014dating back to 1909 and enjoying heritage status since 1976\u2014has been transformed into a luxury hospitality destination, preserving its unique historical charm through meticulous restoration. <\/p>\n","protected":false},"author":33412,"featured_media":207531,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[175,9136,9135,4704,9134,8963,2458,6722,9132,9133],"class_list":["post-207524","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-adaptive-reuse","tag-battery-maritime-building","tag-beaux-arts-structural-expressionist","tag-great-hall","tag-heritage-ferry-terminal","tag-marvel","tag-new-york-city","tag-news","tag-pergola","tag-spire","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"NYC&#039;s Battery Maritime Building, the city&#039;s last working historic ferry terminal, has been transformed into a luxury hospitality destination.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"NYC&#039;s Battery Maritime Building, the city&#039;s last working historic ferry terminal, has been transformed into a luxury hospitality destination.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-18T13:29:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-18T21:21:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1.gif\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/gif\" \/>\n<meta name=\"author\" content=\"marika_gabriel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"marika_gabriel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/\"},\"author\":{\"name\":\"marika_gabriel\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/c96c7b921cb74234841a846a50023f89\"},\"headline\":\"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal\",\"datePublished\":\"2023-12-18T13:29:43+00:00\",\"dateModified\":\"2023-12-18T21:21:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/\"},\"wordCount\":397,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/AA_BatteryMaritimeBuilding1.gif\",\"keywords\":[\"adaptive reuse\",\"Battery Maritime Building\",\"Beaux-Arts Structural Expressionist\",\"Great Hall\",\"heritage ferry terminal\",\"MARVEL\",\"New York City\",\"News\",\"pergola\",\"spire\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/\",\"name\":\"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/AA_BatteryMaritimeBuilding1.gif\",\"datePublished\":\"2023-12-18T13:29:43+00:00\",\"dateModified\":\"2023-12-18T21:21:30+00:00\",\"description\":\"NYC's Battery Maritime Building, the city's last working historic ferry terminal, has been transformed into a luxury hospitality destination.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/AA_BatteryMaritimeBuilding1.gif\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2023\\\/12\\\/AA_BatteryMaritimeBuilding1.gif\",\"width\":1024,\"height\":720},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-nyc-heritage-ferry-terminal\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/c96c7b921cb74234841a846a50023f89\",\"name\":\"marika_gabriel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9520dd056c830158e320b42362c78cd7acdb6694671a38b03cc4dacbce45fad4?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9520dd056c830158e320b42362c78cd7acdb6694671a38b03cc4dacbce45fad4?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9520dd056c830158e320b42362c78cd7acdb6694671a38b03cc4dacbce45fad4?s=96&d=mm&r=g\",\"caption\":\"marika_gabriel\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/marika_gabriel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal - The Construction Specifier","description":"NYC's Battery Maritime Building, the city's last working historic ferry terminal, has been transformed into a luxury hospitality destination.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/","og_locale":"en_US","og_type":"article","og_title":"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal - The Construction Specifier","og_description":"NYC's Battery Maritime Building, the city's last working historic ferry terminal, has been transformed into a luxury hospitality destination.","og_url":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/","og_site_name":"The Construction Specifier","article_published_time":"2023-12-18T13:29:43+00:00","article_modified_time":"2023-12-18T21:21:30+00:00","og_image":[{"width":1024,"height":720,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1.gif","type":"image\/gif"}],"author":"marika_gabriel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"marika_gabriel","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/"},"author":{"name":"marika_gabriel","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/c96c7b921cb74234841a846a50023f89"},"headline":"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal","datePublished":"2023-12-18T13:29:43+00:00","dateModified":"2023-12-18T21:21:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/"},"wordCount":397,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1.gif","keywords":["adaptive reuse","Battery Maritime Building","Beaux-Arts Structural Expressionist","Great Hall","heritage ferry terminal","MARVEL","New York City","News","pergola","spire"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/","url":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/","name":"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1.gif","datePublished":"2023-12-18T13:29:43+00:00","dateModified":"2023-12-18T21:21:30+00:00","description":"NYC's Battery Maritime Building, the city's last working historic ferry terminal, has been transformed into a luxury hospitality destination.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1.gif","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2023\/12\/AA_BatteryMaritimeBuilding1.gif","width":1024,"height":720},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-nyc-heritage-ferry-terminal\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Adaptive reuse breathes new life into NYC\u2019s heritage ferry terminal"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/c96c7b921cb74234841a846a50023f89","name":"marika_gabriel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9520dd056c830158e320b42362c78cd7acdb6694671a38b03cc4dacbce45fad4?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9520dd056c830158e320b42362c78cd7acdb6694671a38b03cc4dacbce45fad4?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9520dd056c830158e320b42362c78cd7acdb6694671a38b03cc4dacbce45fad4?s=96&d=mm&r=g","caption":"marika_gabriel"},"url":"https:\/\/www.constructionspecifier.com\/author\/marika_gabriel\/"}]}},"views":6921,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/207524","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/33412"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=207524"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/207524\/revisions"}],"predecessor-version":[{"id":207566,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/207524\/revisions\/207566"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/207531"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=207524"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=207524"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=207524"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}