{"id":207713,"date":"2024-01-05T18:53:34","date_gmt":"2024-01-05T23:53:34","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=207713"},"modified":"2025-04-14T15:30:02","modified_gmt":"2025-04-14T19:30:02","slug":"back-to-basics-the-four-steps-to-creating-effective-concrete","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/","title":{"rendered":"Back to basics: The four steps to creating effective concrete"},"content":{"rendered":"<figure id=\"attachment_207715\" aria-describedby=\"caption-attachment-207715\" style=\"width: 385px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207715\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-300x169.jpg\" alt=\"Rendering by O\u2019Connell Robertson Architects\/courtesy Waco Independent School District.\" width=\"385\" height=\"217\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-300x169.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-500x281.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-768x432.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance.jpg 800w\" sizes=\"auto, (max-width: 385px) 100vw, 385px\" \/><\/a><figcaption id=\"caption-attachment-207715\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em>Rendering by O\u2019Connell Robertson Architects\/courtesy Waco Independent School District. <\/em><\/span><\/figcaption><\/figure>\n<p><strong>By Chris Bennett, iSCS, CDT and Keith Robinson, FCSC, FCSI, RSW, LEED AP<\/strong><\/p>\n<p>Just as successful specifications enjoy the four attributes of being clear, concise, correct, and complete, concrete also has four steps that are crucial to its success. Those steps are: mix design, consolidation, finishing, and curing. If the four steps work together in concert, the outcome is low porosity, strong, sustainable concrete. However, make changes to one step and not judicious adjustments to the others, and one will find themselves out of step, over budget, and in trouble.<\/p>\n<p>CSA A23.1 states it is the general contractor or construction management team&#8217;s responsibility to prepare a \u201cConcrete Plan\u201d that defines the expected roles and responsibilities of all parties contributing to the quality of concrete, including mix design, consolidating, finishing and curing. However, it is up to the entire team to understand and execute this process together, employing performance-driven methods, to successfully arrive at the design intent.<\/p>\n<p><strong>Mix design<\/strong><\/p>\n<p>The first step, mix design, is the process of determining the ideal proportions of cement, water, aggregates, and additives to produce concrete that meets a project\u2019s specific requirements.\u00a0 ASTM C 125, <em>Standard Definition of Terms Relating to Concrete and Concrete Aggregates<\/em>, explains concrete is a composite of cement and embedded fragments of aggregate (rock and sand). When combined with water, the cement binds the materials together, creating concrete. The quality and properties of raw materials, including supplementary cementitious materials (SCMs), can vary significantly, affecting the consistency and strength of the concrete mix. The mix design is critical for targeting desired strength, workability, and other properties.<\/p>\n<p>Then the mix design must be carefully adjusted to meet site-specific conditions, such as temperature, humidity, and wind. ASTM C94\/C94M, <em>Standard Specification for Ready-Mixed Concrete<\/em>, provides basic guidance on mixing concrete thoroughly to ensure uniformity and workability. A well-designed mix is essential to ensure the longevity and strength of the structure. It is important to bear in mind that new types of concrete mixes, such as those intended to reduce carbon dioxide emissions, may fundamentally change the behavior of concrete (<em>i.e.<\/em> water demands, workability, set times, etc.) and must be handled differently than traditional approaches to avoid dry-shrinkage, deflection, and other potential problems.<\/p>\n<figure id=\"attachment_207719\" aria-describedby=\"caption-attachment-207719\" style=\"width: 397px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Consolidation.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207719\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Consolidation-300x198.jpg\" alt=\"The American Concrete Institute (ACI) describes consolidation as necessary to freshly placed concrete to reduce air voids. If voids are not mitigated and the concrete is allowed to harden, the resulting concrete will suffer from high porosity, non-uniformity, weakness, and poor ability to bond to reinforcement.\" width=\"397\" height=\"262\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Consolidation-300x198.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Consolidation-500x331.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Consolidation-768x508.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Consolidation.jpg 800w\" sizes=\"auto, (max-width: 397px) 100vw, 397px\" \/><\/a><figcaption id=\"caption-attachment-207719\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">The American Concrete Institute (ACI) describes consolidation as necessary to freshly placed concrete to reduce air voids. If voids are not mitigated and the concrete is allowed to harden, the resulting concrete will suffer from high porosity, non-uniformity, weakness, and poor ability to bond to reinforcement. <\/span><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em>Photo courtesy Husqvarna Construction Products.<\/em><\/span><\/figcaption><\/figure>\n<p><strong>Consolidation<\/strong><\/p>\n<p>Consolidation (also called compaction) is the process of packing and molding the concrete within the forms and other structural elements, removing any trapped air pockets that can weaken the concrete\u2019s overall strength. Consolidation is critical because elimination of any gaps or voids in the concrete leads to more uniform strength and higher density. Improper consolidation results in a weaker concrete structure that can fail. ASTM C138\/C138M, <em>Standard Test Method for Density (Unit Weight), Yield, and Air Content (Gravimetric) of Concrete<\/em>, provides instructions for the consolidation needed to produce concrete that can withstand loads and stresses and limit cracks, defects, and avoid shorter lifecycles.<\/p>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_207720\" aria-describedby=\"caption-attachment-207720\" style=\"width: 359px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Puzzle-pieces-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207720\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Puzzle-pieces-1-300x268.jpg\" alt=\"When the four steps of concrete work harmoniously, the result is robust and sustainable concrete. However, should only one step be altered without corresponding adjustments to the others, one will find themselves out of step, over budget, and in trouble.\" width=\"359\" height=\"321\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Puzzle-pieces-1-300x268.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Puzzle-pieces-1-500x447.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Puzzle-pieces-1-768x686.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Puzzle-pieces-1.jpg 800w\" sizes=\"auto, (max-width: 359px) 100vw, 359px\" \/><\/a><figcaption id=\"caption-attachment-207720\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">When the four steps of concrete work harmoniously, the result is robust and sustainable concrete. However, should only one step be altered without corresponding adjustments to the others, one will find themselves out of step, over budget, and in trouble.<\/span><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em>Illustration courtesy Bennett Build. <\/em><\/span><\/figcaption><\/figure>\n<p>Concrete, especially high-consistency mixes, can be over-consolidated, usually from over-vibration. In these instances, a thick film of water will form on the surface. This water can negatively impact the concrete with reduced surface strength, lower permeability, and poor aesthetics. Seth Mailman, a project manager at Baker Concrete, says, \u201cConcrete placed without proper consolidation will not perform as expected. Understanding the relationship between design and construction with respect to concrete is necessary to ensure the final product performs as expected.\u201d<\/p>\n<p><strong>Finishing<\/strong><\/p>\n<p>The third phase, finishing, is the process of smoothing out the surface of the concrete to achieve a desired performance texture and appearance. The American Concrete Institute (ACI) 301-20: <em>Specifications for Concrete Construction<\/em> is a solid starting point for information on finishing to make attractive, durable concrete surfaces capable of resisting abrasion, weathering, and other physical stresses. Finishing helps with setting, prevents chipping, and is climacteric to both decorative and industrial polished concrete surfaces.<\/p>\n<p><strong>Types of finishes<\/strong><\/p>\n<ul>\n<li>Broom finish: Brushing a broom over the concrete\u2019s wet surface will create a noticeable textured groove. This is a long-accepted finish for exterior concrete.<\/li>\n<li>Bull float finish: A bull float is a tool used by a finisher to spread and smooth concrete before initial set is achieved. A bull full float finish is the texture left behind by the smooth paddle facing of the bull float without additional screening or trowel work.<\/li>\n<li>Sand finish: A sand finish involves removing the cream off the surface of the concrete so the sand just below is exposed to become the new surface. This can be beneficial for exterior locations in climates that deal with significant freeze-thaw swings.<\/li>\n<li>Salt finish: Rock salt can be rolled across\/into the surface of fresh concrete and then washed off after final set to create a subtle texture with enhanced skid resistance.<\/li>\n<li>Stamped finish: Stamped concrete has been imprinted to resemble brick, slate, flagstone, and other material types through texturing and pattern molds that are stamped into the concrete.<\/li>\n<li>Troweled finish: By using either a hand or power trowel, a trowel finish is executed by the smoothing and compacting of the unformed surface of<br \/>\nfresh concrete.<\/li>\n<li><figure id=\"attachment_207721\" aria-describedby=\"caption-attachment-207721\" style=\"width: 357px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Waco-Break-Data.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207721\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Waco-Break-Data-300x232.jpg\" alt=\"This graph includes breaks from three different pours of low carbon concrete (each with 30 percent cement reduction and zero supplementary cementitious materials [SCMs]). Design strength was achieved the first day, accelerating schedules by updating curing with nano modified cements (NMC).\" width=\"357\" height=\"276\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Waco-Break-Data-300x232.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Waco-Break-Data-500x386.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Waco-Break-Data-768x593.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Waco-Break-Data.jpg 800w\" sizes=\"auto, (max-width: 357px) 100vw, 357px\" \/><\/a><figcaption id=\"caption-attachment-207721\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">This graph includes breaks from three different pours of low carbon concrete (each with 30 percent cement reduction and zero supplementary cementitious materials [SCMs]). Design strength was achieved the first day, accelerating schedules by updating curing with nano modified cements (NMC).<\/span><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em>Illustration courtesy Bennett Build, Langerman Engineering, Structures Texas, and Waco ISD. <\/em><\/span><\/figcaption><\/figure>Polished finish: A polished finish is a higher degree of troweling in which the concrete is further refined for aesthetics and abrasion resistance. It is worth noting that polished concrete on existing slabs requires the concrete\u2019s surface to return to a semi-plastic state through the creation of slurry to achieve maximum refinement and maintain surface integrity.<\/li>\n<\/ul>\n<p>A polished concrete finish is most successfully achieved through the specification of surface micro texture (SMT) performance benchmarks in Part 3 of concrete specifications section. As an example, a hard trowel finish may be specified to meet an average 2 to 1 micrometer (\u00b5m) (80 to 40 microinches [\u00b5in]), as measured by ASME B46.1-2019, <em>Surface Texture (Surface Roughness, Waviness, and Lay)<\/em>, ahead of the polished concrete contractor\u2019s final benchmark (<em>i.e.<\/em> 0.7 to 0.2 \u00b5m [30 to 10 \u00b5in]).<\/p>\n<p><!--nextpage--><\/p>\n<div class=\"wonderpluginslider-container\" id=\"wonderpluginslider-container-340\" style=\"max-width:750px;margin:0 auto;padding-left:0px;padding-right:0px;padding-top:84px;padding-bottom:0px;\"><div class=\"wonderpluginslider\" id=\"wonderpluginslider-340\" data-sliderid=\"340\" data-width=\"750\" data-height=\"650\" data-skin=\"topcarousel\" data-usejsforfullbrowserwidth=\"false\" data-fullbrowserwidth=\"false\" data-playmutedandinlinewhenautoplay=\"false\" data-addextraattributes=\"false\" data-autoplay=\"false\" data-randomplay=\"false\" data-loadimageondemand=\"false\" data-transitiononfirstslide=\"false\" data-autoplayvideo=\"false\" data-isresponsive=\"true\" data-fullwidth=\"false\" data-isfullscreen=\"false\" data-ratioresponsive=\"false\" data-showtext=\"true\" data-showtimer=\"true\" data-showbottomshadow=\"false\" data-navshowpreview=\"false\" data-textautohide=\"false\" data-pauseonmouseover=\"false\" data-lightboxresponsive=\"true\" data-lightboxshownavigation=\"false\" data-lightboxshowtitle=\"true\" data-lightboxshowdescription=\"false\" data-texteffectresponsive=\"true\" data-donotinit=\"false\" data-addinitscript=\"false\" data-lightboxfullscreenmode=\"false\" data-lightboxcloseonoverlay=\"true\" data-lightboxvideohidecontrols=\"false\" data-lightboxnogroup=\"false\" data-shownav=\"true\" data-navthumbresponsive=\"false\" data-navshowfeaturedarrow=\"true\" data-inityoutube=\"true\" data-initvimeo=\"true\" data-navshowplaypause=\"true\" data-navshowarrow=\"false\" data-navshowbuttons=\"false\" data-lightboxshowsocial=\"false\" data-lightboxshowfacebook=\"true\" data-lightboxshowtwitter=\"true\" data-lightboxshowpinterest=\"true\" data-lightboxsocialrotateeffect=\"true\" data-showsocial=\"false\" data-showfacebook=\"true\" data-showtwitter=\"true\" data-showpinterest=\"true\" data-socialrotateeffect=\"true\" data-disableinlinecss=\"false\" data-triggerresize=\"false\" data-lightboxautoslide=\"false\" data-lightboxshowtimer=\"true\" data-lightboxshowplaybutton=\"true\" data-lightboxalwaysshownavarrows=\"false\" data-lightboxshowtitleprefix=\"true\" data-titleusealt=\"false\" data-outputtext=\"false\" data-titletag=\"h1\" data-descriptiontag=\"h2\" data-scalemode=\"fit\" data-arrowstyle=\"mouseover\" data-transition=\"fade\" data-loop=\"0\" data-border=\"0\" data-slideinterval=\"8000\" data-arrowimage=\"arrows-48-48-4.png\" data-arrowwidth=\"48\" data-arrowheight=\"48\" data-arrowtop=\"50\" data-arrowmargin=\"0\" data-ga4account=\"\" data-googleanalyticsaccount=\"\" data-navplaypauseimage=\"navplaypause-48-48-0.png\" data-navarrowimage=\"navarrows-28-28-0.png\" data-navstyle=\"thumbnails\" data-navimage=\"bullet-24-24-5.png\" data-navwidth=\"109\" data-navheight=\"72\" data-navspacing=\"4\" data-navmarginx=\"16\" data-navmarginy=\"-84\" data-navposition=\"top\" data-navthumbnavigationstyle=\"arrowinside\" data-navthumbnavigationarrowimage=\"carouselarrows-32-32-3.png\" data-navthumbnavigationarrowimagewidth=\"32\" data-navthumbnavigationarrowimageheight=\"32\" data-playvideoimage=\"playvideo-64-64-0.png\" data-playvideoimagewidth=\"64\" data-playvideoimageheight=\"64\" data-lightboxthumbwidth=\"90\" data-lightboxthumbheight=\"60\" data-lightboxthumbtopmargin=\"12\" data-lightboxthumbbottommargin=\"4\" data-lightboxbarheight=\"64\" data-lightboxtitlebottomcss=\"color:#333; font-size:14px; font-family:Armata,sans-serif,Arial; overflow:hidden; text-align:left;\" data-lightboxdescriptionbottomcss=\"color:#333; font-size:12px; font-family:Arial,Helvetica,sans-serif; overflow:hidden; text-align:left; margin:4px 0px 0px; padding: 0px;\" data-textformat=\"Underneath center\" data-textpositionstatic=\"bottomoutside\" data-textpositiondynamic=\"bottomleft\" data-paddingleft=\"0\" data-paddingright=\"0\" data-paddingtop=\"84\" data-paddingbottom=\"0\" data-texteffectresponsivesize=\"640\" data-textleftrightpercentforstatic=\"40\" data-fadeduration=\"1000\" data-crossfadeduration=\"1000\" data-fadeoutfadeinduration=\"2000\" data-slideduration=\"1000\" data-cssslideduration=\"1000\" data-elasticduration=\"1000\" data-sliceduration=\"1500\" data-blindsduration=\"1500\" data-blocksduration=\"1500\" data-shuffleduration=\"1500\" data-tilesduration=\"2000\" data-kenburnsduration=\"5000\" data-flipduration=\"1500\" data-flipwithzoomduration=\"2000\" data-threedduration=\"1500\" data-threedhorizontalduration=\"1500\" data-threedwithzoomduration=\"2500\" data-threedhorizontalwithzoomduration=\"2200\" data-threedflipduration=\"1500\" data-threedflipwithzoomduration=\"2000\" data-threedtilesduration=\"2000\" data-threedfallback=\"flip\" data-threedhorizontalfallback=\"flip\" data-threedwithzoomfallback=\"flipwithzoom\" data-threedhorizontalwithzoomfallback=\"flipwithzoom\" data-threedflipfallback=\"flip\" data-threedflipwithzoomfallback=\"flipwithzoom\" data-threedtilesfallback=\"tiles\" data-ratiomediumscreen=\"800\" data-ratiomediumheight=\"1.2\" data-ratiosmallscreen=\"480\" data-ratiosmallheight=\"1.6\" data-socialmode=\"mouseover\" data-socialposition=\"position:absolute;top:8px;right:8px;\" data-socialpositionsmallscreen=\"position:absolute;top:8px;right:8px;\" data-socialdirection=\"horizontal\" data-socialbuttonsize=\"32\" data-socialbuttonfontsize=\"18\" data-navthumbcolumn=\"5\" data-navthumbtitleheight=\"20\" data-navthumbtitlewidth=\"120\" data-navthumbresponsivemode=\"samesize\" data-navthumbstyle=\"imageonly\" data-navthumbmediumsize=\"900\" data-navthumbmediumwidth=\"64\" data-navthumbmediumheight=\"64\" data-navthumbmediumcolumn=\"4\" data-navthumbmediumtitleheight=\"18\" data-navthumbmediumtitlewidth=\"120\" data-navthumbsmallsize=\"600\" data-navthumbsmallwidth=\"48\" data-navthumbsmallheight=\"48\" data-navthumbsmallcolumn=\"3\" data-navthumbsmalltitleheight=\"18\" data-navthumbsmalltitlewidth=\"120\" data-lightboxsocialposition=\"position:absolute;top:100%;right:0;\" data-lightboxsocialpositionsmallscreen=\"position:absolute;top:100%;right:0;left:0;\" data-lightboxsocialdirection=\"horizontal\" data-lightboxsocialbuttonsize=\"32\" data-lightboxsocialbuttonfontsize=\"18\" data-lightboxtitlestyle=\"bottom\" data-lightboximagepercentage=\"75\" data-lightboxdefaultvideovolume=\"1\" data-lightboxoverlaybgcolor=\"#000\" data-lightboxoverlayopacity=\"0.9\" data-lightboxbgcolor=\"#fff\" data-lightboxtitleprefix=\"%NUM \/ %TOTAL\" data-lightboxtitleinsidecss=\"color:#fff; font-size:16px; font-family:Arial,Helvetica,sans-serif; overflow:hidden; text-align:left;\" data-lightboxdescriptioninsidecss=\"color:#fff; font-size:12px; font-family:Arial,Helvetica,sans-serif; overflow:hidden; text-align:left; margin:4px 0px 0px; padding: 0px;\" data-lightboxtitleoutsidecss=\"color:#fff; font-size:18px; font-family:Arial,Helvetica,sans-serif; overflow:hidden; text-align:center; margin: 8px;\" data-lightboxdescriptionoutsidecss=\"color:#fff; font-size:14px; font-family:Arial,Helvetica,sans-serif; overflow:hidden; text-align:center; margin:8px; padding: 0px;\" data-triggerresizedelay=\"100\" data-lightboxslideinterval=\"5000\" data-lightboxtimerposition=\"bottom\" data-lightboxtimercolor=\"#dc572e\" data-lightboxtimeropacity=\"1\" data-lightboxbordersize=\"8\" data-lightboxborderradius=\"0\" data-textcss=\"display:block; padding:12px 0px; text-align:center; margin-top:4px;\" data-textbgcss=\"display:none;\" data-titlecss=\"display:block; position:relative; font:bold 16px Georgia,serif,Arial; color:#333;\" data-descriptioncss=\"display:block; position:relative; font:14px Georgia,serif,Arial; color:#333; margin-top:8px;\" data-buttoncss=\"display:block; position:relative; margin-top:8px;\" data-titlecssresponsive=\"font-size:12px;\" data-descriptioncssresponsive=\"display:none !important;\" data-buttoncssresponsive=\"\" data-jsfolder=\"https:\/\/www.constructionspecifier.com\/wp-content\/plugins\/wonderplugin-slider\/engine\/\" style=\"display:none;\" ><ul class=\"amazingslider-slides\"  style=\"display:none;\"><li><img decoding=\"async\" class=\"amazingslider-img-elem amazingsliderimg\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Collage-1.jpg\" alt=\"Teams from Miller Sierra and Bomanite Texas place, finish, and install large aggregate exposed polish finishes on low carbon concrete\u2014within  an 18-hour window.\" title=\"\" data-description=\"Caption for the slider: Teams from Miller Sierra and Bomanite Texas place, finish, and install large aggregate exposed polish finishes on low carbon concrete\u2014within an 18-hour window. Photos courtesy Bennett Build, BWC Education, and Built Wright Construction.\" \/><\/li><li><img decoding=\"async\" class=\"amazingslider-img-elem amazingsliderimg\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Collage-2.jpg\" alt=\"Collage-2\" title=\"Collage-2\" data-description=\"\" \/><\/li><li><img decoding=\"async\" class=\"amazingslider-img-elem amazingsliderimg\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Collage-3.jpg\" alt=\"Collage-3\" title=\"Collage-3\" data-description=\"\" \/><\/li><\/ul><ul class=\"amazingslider-thumbnails\"  style=\"display:none;\"><li><img decoding=\"async\" class=\"amazingslider-thumbnail-elem amazingsliderthumbnailimg\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Collage-1-300x225.jpg\" alt=\"Teams from Miller Sierra and Bomanite Texas place, finish, and install large aggregate exposed polish finishes on low carbon concrete\u2014within  an 18-hour window.\" title=\"\" data-description=\"Caption for the slider: Teams from Miller Sierra and Bomanite Texas place, finish, and install large aggregate exposed polish finishes on low carbon concrete\u2014within an 18-hour window. Photos courtesy Bennett Build, BWC Education, and Built Wright Construction.\" \/><\/li><li><img decoding=\"async\" class=\"amazingslider-thumbnail-elem amazingsliderthumbnailimg\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Collage-2-300x225.jpg\" alt=\"Collage-2\" title=\"Collage-2\" data-description=\"\" \/><\/li><li><img decoding=\"async\" class=\"amazingslider-thumbnail-elem amazingsliderthumbnailimg\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Collage-3-225x300.jpg\" alt=\"Collage-3\" title=\"Collage-3\" data-description=\"\" \/><\/li><\/ul><\/div><\/div><div id=\"amazingslider_customtexteffect_340\" style=\"display:none;\" data-texteffect=\"{&quot;Underneath center&quot;:{&quot;textstyle&quot;:&quot;static&quot;,&quot;textpositionstatic&quot;:&quot;bottomoutside&quot;,&quot;textautohide&quot;:false,&quot;textpositionmarginstatic&quot;:0,&quot;textpositiondynamic&quot;:&quot;bottomleft&quot;,&quot;textpositionmarginleft&quot;:24,&quot;textpositionmarginright&quot;:24,&quot;textpositionmargintop&quot;:24,&quot;textpositionmarginbottom&quot;:24,&quot;texteffect&quot;:&quot;slide&quot;,&quot;texteffecteasing&quot;:&quot;easeOutCubic&quot;,&quot;texteffectduration&quot;:600,&quot;texteffectslidedirection&quot;:&quot;left&quot;,&quot;texteffectslidedistance&quot;:30,&quot;texteffectdelay&quot;:500,&quot;texteffectseparate&quot;:false,&quot;texteffect1&quot;:&quot;slide&quot;,&quot;texteffectslidedirection1&quot;:&quot;right&quot;,&quot;texteffectslidedistance1&quot;:120,&quot;texteffecteasing1&quot;:&quot;easeOutCubic&quot;,&quot;texteffectduration1&quot;:600,&quot;texteffectdelay1&quot;:1000,&quot;texteffect2&quot;:&quot;slide&quot;,&quot;texteffectslidedirection2&quot;:&quot;right&quot;,&quot;texteffectslidedistance2&quot;:120,&quot;texteffecteasing2&quot;:&quot;easeOutCubic&quot;,&quot;texteffectduration2&quot;:600,&quot;texteffectdelay2&quot;:1500,&quot;textcss&quot;:&quot;display:block; padding:12px 0px; text-align:center; margin-top:4px;&quot;,&quot;textbgcss&quot;:&quot;display:none;&quot;,&quot;titlecss&quot;:&quot;display:block; position:relative; font:bold 16px Georgia,serif,Arial; color:#333;&quot;,&quot;descriptioncss&quot;:&quot;display:block; position:relative; font:14px Georgia,serif,Arial; color:#333; margin-top:8px;&quot;,&quot;buttoncss&quot;:&quot;display:block; position:relative; margin-top:8px;&quot;,&quot;texteffectresponsive&quot;:true,&quot;texteffectresponsivesize&quot;:640,&quot;titlecssresponsive&quot;:&quot;font-size:12px;&quot;,&quot;descriptioncssresponsive&quot;:&quot;display:none !important;&quot;,&quot;buttoncssresponsive&quot;:&quot;&quot;,&quot;addgooglefonts&quot;:false,&quot;googlefonts&quot;:&quot;&quot;,&quot;textleftrightpercentforstatic&quot;:40}}\"><\/div><script>function wonderslider_340_appendcss(csscode) {var head=document.head || document.getElementsByTagName(\"head\")[0];var style=document.createElement(\"style\");head.appendChild(style);style.type=\"text\/css\";if (style.styleSheet){style.styleSheet.cssText=csscode;} else {style.appendChild(document.createTextNode(csscode));}};wonderslider_340_appendcss(\"#wonderpluginslider-340 .star-rating { \tdisplay: inline-block; }\");<\/script>\n<p>For readers unfamiliar with surface micro texture performance, the average roughness (Ra) is a measure of the surface roughness (micro texture) of a material, such as concrete. A higher Ra value indicates a rougher surface, and a lower Ra value means a smoother surface. This can affect appearance, durability, and other performance aspects of the concrete. Ra can also be useful in evaluating other concrete surface qualities to ensure proper surface preparation, treatments, and performance of applied systems.<\/p>\n<p>Owner of Premier Concrete contracting, Eric Traffic, says, \u201cIt is eye-opening to measure Ra after final troweling on a floor. There are differences between finishers, equipment, and blades. A concrete slab can be finished with more precise Ra tolerances using proper finishing aids and logical mix designs, and paying attention to blade and tool selection. This leads to denser slabs with higher abrasion resistance and lower porosity.\u201d<\/p>\n<p>Finishing requires skilled and experienced professionals to oversee and execute the work. A well-finished concrete surface will reduce the need for maintenance and repairs over time, increase the structure\u2019s lifespan, and produce a strong, good-looking surface. Contractors must be required to attend necessary training to ensure their skill set aligns with performance demands. Failure to do so may result in defaulting to old routines, which can compromise the harmony of finishing tasks with other important steps.<\/p>\n<p><strong>Curing<\/strong><\/p>\n<p>Curing, the final and culminating phase, is the process of allowing the concrete to harden and reach its full strength by controlling temperature and preventing the loss of moisture. Proper curing is essential, as it affects the final strength, durability, and quality of the concrete. Curing should be reviewed and updated with each project, not simply doing whatever has been done before.<\/p>\n<p>The approach to curing will be informed by the needs of the individual components of the mix (<em>i.e. <\/em>slag, limestone cement, calcined clay, reclaimed versus standard fly ash types, etc.) to ensure water demands, alkalinity, milling quality, and other factors are accounted for. All too often, this last step is under considered and creates most of the problems with volume change (<em>i.e.<\/em> cracking, curling, etc.). As Tyler Ley, PhD, a civil engineering professor at Oklahoma State University, says, \u201cThe most common curing of all is not curing.\u201d<sup>1<\/sup><\/p>\n<p>The curing process starts right after placing and finishing (including consolidation) and helps maintain the right moisture and temperature levels to ensure the desired strength of the concrete. If executed properly, curing will aid in developing the concrete\u2019s full strength and durability. If done incorrectly (<em>e.g.<\/em> allowing the concrete to dry too quickly as is common in North America), it can weaken the structure and lead to cracking and other malformations. In addition, insufficient curing can lower abrasion resistance and lead to early deterioration of the concrete surface. How long the concrete will need to cure depends on several critical factors. They include the following:<\/p>\n<ul>\n<li>Mix design (mixture proportions)<\/li>\n<li>Specified strength<\/li>\n<li>Weather conditions<\/li>\n<li>Current and future exposure conditions<\/li>\n<li>Size and shape of the concrete system produced<\/li>\n<\/ul>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_207728\" aria-describedby=\"caption-attachment-207728\" style=\"width: 296px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/image-for-back-to-basics-concrete.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207728\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/image-for-back-to-basics-concrete-199x300.jpg\" alt=\"\" width=\"296\" height=\"446\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/image-for-back-to-basics-concrete-199x300.jpg 199w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/image-for-back-to-basics-concrete-332x500.jpg 332w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/image-for-back-to-basics-concrete.jpg 333w\" sizes=\"auto, (max-width: 296px) 100vw, 296px\" \/><\/a><figcaption id=\"caption-attachment-207728\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">Prebid education for Waco ISD\u2019s AEC teams were critical to understanding how to take advantage of schedule gains and learn the benchmarks that provide wayfinding in meeting conditions of the contract. Here, project team members attend a class on measuring and recording surface texture roughness average (Ra), coefficient of friction (COF), and distinctness of image (DOI) gloss readings to hit specification benchmarks.<\/span><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em>Photo courtesy Bennett Build. <\/em><\/span><\/figcaption><\/figure>\n<p>Recommendations for minimum periods of curing from the ACI are generally around the time concrete reaches 70 percent of the specified compressive strength. This minimum level can take shorter or longer periods of time, depending on the aforementioned factors, as well as what manner of curing the team uses. There are many different approaches to curing. They vary in cost of application as well as effectiveness. Wet curing has long been the gold standard for concrete among many contractors, but its cost and schedule demands often lead project teams to choose lesser performing methods. In recent years, internally cured concrete (ICC) used in various projects, such as California\u2019s 415 Natoma by Brookfield Properties, Virginia\u2019s Amazon HQ2, Florida\u2019s DuraMag plant, and Waco ISD\u2019s Kendrick Elementary School in Texas, has developed beyond lightweight clay and shale aggregates to include cellulose fibers (CF), nano modified cements (NMC), certain nano silicas, and other technologies that are proving more cost effective while delivering wet cure-like results in more time effective manners.<\/p>\n<p>Higher curing temperatures can assist in achieving early strength gains, but certain temperatures can also decrease strength. Curing in extreme hot or cold weather requires additional care and preparation. ACI 306.1, <em>Standard Specification for Cold Weather Concreting<\/em> and ACI 306R, <em>Guide to Cold Weather Concreting,<\/em> are reliable sources for this issue.<\/p>\n<p><strong>Low-carbon concrete curing<\/strong><\/p>\n<p>While ASTM C31\/C31M, <em>Standard Test Practice for Making and Curing Concrete Test Specimens in the Field,<\/em> provides a starting point for traditional concrete placement, it has not, as of yet, been sufficiently updated for low-carbon concrete, respecting the impact to massive cement reductions and the changing qualities of supplementary cementitious materials.<\/p>\n<p>Low-carbon concrete is a new material. Treating it like old concrete (<em>i.e.<\/em> using older curing, consolidating, and finishing methods) will manifest a variety of problems including delayed day of strength requirements, more change orders for repairs, and increased potential for ironically shorter lifecycles, therefore defeating sustainability objectives. A simple indicator that a plan\u2019s low carbon curing might be insufficient are longer than normal curing schedules. Delayed day of strength requirements are not necessary and add significant budget increases that may push owners away from opting for low carbon concrete solutions.<\/p>\n<p>Approaches such as ICC are proving promising in meeting the challenges of low carbon concrete, including earlier strength gains, but also it creates the need for substantial updates to documentation and planning. Construction professionals should also update themselves, setting aside earlier experiences and habits to approach low carbon concrete as a new subject and allow them to learn and become students again.<\/p>\n<p>Architect Kristina Abrams, notes, \u201cIf we, as Architects, treat low-carbon concrete the same way we approach traditional concrete, we will not truly benefit from innovation and cost savings.\u201d Teams should research which approaches are most beneficial for their circumstances and keep in mind that low-carbon concrete field is still relatively new. Supplier teams must take responsibility for providing products and materials that can meet the requirements of each of the four steps of concrete production. This is crucial to prevent extended cure times and ensure the production of high-performing concrete.<\/p>\n<p><strong>Protection and usage<\/strong><\/p>\n<p>Finally, the often overlooked and essential component is protection of concrete once it is cured. Cured does not mean concrete is \u201cgood to go,\u201d strength gain can be greatly impaired by leaving concrete to the elements, being wetted by inclement weather, freezing conditions, or high heat. The Concrete Plan must account for and provide equipment and materials necessary to protect concrete during delivery, placing and finishing, and curing from heat\/cold, wind, precipitation\u2014anticipating that these conditions could change throughout a scheduled placement.<\/p>\n<p>In addition, the Concrete Plan has to account for the proposed usage of the concrete\u2014based on the needs of floor covering trades, or special finishes applied to the concrete (polished, stained, ground, high performance coatings); or the way the floors will be used, which could require a level of performance for ultimate floor flatness\/floor levelness (Ff\/Fl) that exceeds normal work practices.<\/p>\n<p><!--nextpage--><\/p>\n<p><strong>Conclusion<\/strong><\/p>\n<p>It is worth nothing, these recommendations are just a starting point and will vary depending on project-specific requirements. It is proper to consult with<br \/>\na qualified engineer or concrete specialty group to determine the appropriate standards and specifications for each project, and be aware of local building codes and regulations which may impact the course of action. At the same time, materials must adhere to established standards, meet the desired results outlined in building codes, and fulfill owner requirements, all supported by scientific data verification.<\/p>\n<p>An informed concrete crew is a treasure to be protected and coddled, a band of disparate workers poking away at the concrete can lead to expensive rework. There is nothing more expensive to a project than pulling out the concrete (<em>i.e.<\/em> demolition and start over). It is better to make mistakes on paper than in the final work result.<\/p>\n<p>At the same time, designers need to understand that the many recipes and ideas marketed to them may look good on paper, but they also just might be creating hardships on the job site. Each step (mix design, consolidation, finishing, and curing) must be carried out with care and precision, and all teams on the project must understand the four steps are related and that success (or lack thereof) in one step can affect the others. Brandon Godbey of Tao Group believes individuals throughout the architecture, engineering, and design process are increasingly recognizing that concrete, despite being produced on-site, can adhere to scientific standards and contribute to the meticulous crafting of high-quality concrete in all aspects.<\/p>\n<p>A well-designed mix with proper consolidation, finishing, and curing can create an attractive and robust concrete structure that can withstand various forms of stress and damage, and offset potential budget increases. Data is the only way to protect design intent and collaboration between all team members is paramount to success and increases the likelihood of all four steps concrete working together.<\/p>\n<p>Gloria Barrera, chief officer of operations and facilities, at Waco ISD notes, \u201cGiven the increasing complexity of concrete and guaranteeing our curing, and finishing match new mix designs, we must find other ways to ensure that the owner is getting what is specified and paid for. Data is one way to protect design intent.\u201d<\/p>\n<p><strong>References<\/strong><\/p>\n<ul>\n<li>Waco ISD concrete innovation, <a href=\"https:\/\/www.kwtx.com\/2023\/10\/11\/waco-isd-holds-demonstration-introducing-new-construction-method\/\" target=\"_blank\" rel=\"noopener\">www.kwtx.com\/2023\/10\/11\/waco-isd-holds-demonstration-introducing-new-construction-method<\/a>.<\/li>\n<li>Waco internally cured concrete (ICC) concrete, <a href=\"https:\/\/www.fox44news.com\/news\/local-news\/mclennan-county\/waco-isd-hosts-showcase-for-innovative-construction-methods\/\" target=\"_blank\" rel=\"noopener\">www.fox44news.com\/news\/local-news\/mclennan-county\/waco-isd-hosts-showcase<\/a><br \/>\n-for-innovative-construction-methods.<\/li>\n<li>Renovated Waco ISD elementary schools, <a href=\"https:\/\/wacotrib.com\/news\/local\/education\/kendrick-south-waco-new-school-designs\/article_bb6d0618-2d8c-11ee-8db8-071220f8948f.html\" target=\"_blank\" rel=\"noopener\">wacotrib.com\/news\/local\/education\/kendrick-south-waco-new-school-designs\/article_bb6d0618-2d8c-11ee-8db8-071220f8948f.html<\/a>.<\/li>\n<li>Internally Cured Concrete at 415 Natoma <a href=\"https:\/\/www.constructionspecifier.com\/concretes-cobra-effect-unintended-results-of-embodied-carbon-reduction\/#:~:text=Concrete's%20cobra%20effect%3A%20unintended%20results%20of%20embodied%20carbon%20reduction,-January%2013%2C%202023&amp;text=Recent%20efforts%20in%20North%20America,they%20were%20trying%20to%20solve\" target=\"_blank\" rel=\"noopener\">www.constructionspecifier.com\/concretes-cobra-effect-unintended-results-of-embodied-carbon-reduction\/#:~:text=Concrete&#8217;s%20cobra%20effect%3A%20unintended%20results%20of%20embodied%20carbon%20reduction,-January%2013%2C%202023&amp;text=Recent%20efforts%20in%20North%20America,they%20were%20trying%20to%20solve<\/a>.<\/li>\n<li>Healthy Concrete Systems: <a href=\"https:\/\/www.constructionspecifier.com\/healthy-concrete-systems-defending-design-intent\/\" target=\"_blank\" rel=\"noopener\">www.constructionspecifier.com\/healthy-concrete-systems-defending-design-intent<\/a>.<\/li>\n<\/ul>\n<p><a href=\"https:\/\/www.constructionspecifier.com\/test-your-knowledge-of-the-four-steps-to-effective-concrete\/\">Take our quiz!<\/a><\/p>\n<p class=\"Sidebar-Bold\"><strong>Authors<\/strong><\/p>\n<p class=\"Sidebar-BodyText\"><span style=\"letter-spacing: -.1pt;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-207730 alignleft\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Bennett_Headshot-f.jpg\" alt=\"\" width=\"90\" height=\"90\" \/> Chris Bennett is the founder and CEO of Bennett Build, an industry-recognized leader in concrete consulting. His firm represents owners and assists their project teams in decreasing overall concrete costs and risk, reducing the most embodied carbon possible, and providing the highest quality concrete available. Bennett has led innovation in concrete education and research by facilitating such programs as Concrete North with University of Alberta and Edmonton CSC, the University of Akron NCERCAMP, the International Society for Construction Sciences (iSCS), the National Concrete &amp; Corrosion Symposium (NCCS).<\/span><\/p>\n<p class=\"Sidebar-BodyText\"><span style=\"letter-spacing: -.1pt;\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-207731 alignright\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Robinson_Headshot-f.jpg\" alt=\"\" width=\"90\" height=\"90\" \/>Keith Robinson, RSW, FCSC, FCSI, is a retired architectural technologist and specifier based in Edmonton, Alberta. Robinson instructs courses for the University of Alberta, acts as an advisor to several construction groups, and sits on many standards review committees for ASTM and the National Fire Protection Association (NFPA). Robinson was a key driver in the hands-on research at University of Alberta\u2019s Concrete North with the Donadeo Innovation Centre for Engineering Excellence (ICE), as well as early field testing of commercial internally cured concrete in North America.<\/span><\/p>\n<p class=\"Sidebar-BodyText\"><strong><span style=\"letter-spacing: -.1pt;\">Note\u00a0<\/span><\/strong><\/p>\n<p class=\"Sidebar-BodyText\"><span style=\"letter-spacing: -.1pt;\">Together, Bennett and Robinson have developed specification <\/span><span style=\"letter-spacing: -.25pt;\">improvements within the concrete scope, written numerous articles <\/span><span style=\"letter-spacing: -.15pt;\">on concrete, and presented at CSI Construct, World of <\/span><span style=\"letter-spacing: -.2pt;\">Concrete, Concrete North with University of Alberta, Praxis Events <\/span><span style=\"letter-spacing: -.1pt;\">Live!, as well as the National Concrete and Corrosion Symposium with Kent State University and University of Akron NCERCAMP.<\/span><\/p>\n<p class=\"Sidebar-BodyText\">\n","protected":false},"excerpt":{"rendered":"<p>Just as successful specifications enjoy the four attributes of being clear, concise, correct, and complete, concrete also has four steps that are crucial to its success. Those steps are: mix design, consolidation, finishing, and curing.<\/p>\n","protected":false},"author":29853,"featured_media":207716,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,183,243,184],"tags":[752,649,1240,6926,9188,1065,9189],"class_list":["post-207713","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-03-00-00-concrete","category-03-70-00-mass-concrete","category-04-00-00-masonry","tag-concrete","tag-concrete-finishing","tag-division-03","tag-features","tag-low-carbon-concrete","tag-mix-design","tag-net-zero-concrete","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Back to basics: The four steps to creating effective concrete - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"Successful specifications are clear, concise, correct, and complete; similarly, concrete success requires four essential steps.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Back to basics: The four steps to creating effective concrete - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Successful specifications are clear, concise, correct, and complete; similarly, concrete success requires four essential steps.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2024-01-05T23:53:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-04-14T19:30:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-f.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"arslan_ahmed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"arslan_ahmed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/\"},\"author\":{\"name\":\"arslan_ahmed\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\"},\"headline\":\"Back to basics: The four steps to creating effective concrete\",\"datePublished\":\"2024-01-05T23:53:34+00:00\",\"dateModified\":\"2025-04-14T19:30:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/\"},\"wordCount\":3101,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Kendrick-Entrance-f.jpg\",\"keywords\":[\"Concrete\",\"Concrete finishing\",\"Division 03\",\"features\",\"Low-carbon concrete\",\"Mix design\",\"Net-zero concrete\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"03 00 00 Concrete\",\"03 70 00 Mass Concrete\",\"04 00 00 Masonry\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/\",\"name\":\"Back to basics: The four steps to creating effective concrete - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Kendrick-Entrance-f.jpg\",\"datePublished\":\"2024-01-05T23:53:34+00:00\",\"dateModified\":\"2025-04-14T19:30:02+00:00\",\"description\":\"Successful specifications are clear, concise, correct, and complete; similarly, concrete success requires four essential steps.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/back-to-basics-the-four-steps-to-creating-effective-concrete\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Kendrick-Entrance-f.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Kendrick-Entrance-f.jpg\",\"width\":400,\"height\":200},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\",\"name\":\"arslan_ahmed\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"caption\":\"arslan_ahmed\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/arslan_ahmed\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Back to basics: The four steps to creating effective concrete - The Construction Specifier","description":"Successful specifications are clear, concise, correct, and complete; similarly, concrete success requires four essential steps.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/","next":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/2\/","og_locale":"en_US","og_type":"article","og_title":"Back to basics: The four steps to creating effective concrete - The Construction Specifier","og_description":"Successful specifications are clear, concise, correct, and complete; similarly, concrete success requires four essential steps.","og_url":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/","og_site_name":"The Construction Specifier","article_published_time":"2024-01-05T23:53:34+00:00","article_modified_time":"2025-04-14T19:30:02+00:00","og_image":[{"width":400,"height":200,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-f.jpg","type":"image\/jpeg"}],"author":"arslan_ahmed","twitter_card":"summary_large_image","twitter_misc":{"Written by":"arslan_ahmed","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/"},"author":{"name":"arslan_ahmed","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502"},"headline":"Back to basics: The four steps to creating effective concrete","datePublished":"2024-01-05T23:53:34+00:00","dateModified":"2025-04-14T19:30:02+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/"},"wordCount":3101,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-f.jpg","keywords":["Concrete","Concrete finishing","Division 03","features","Low-carbon concrete","Mix design","Net-zero concrete"],"articleSection":["Features","MasterFormat","03 00 00 Concrete","03 70 00 Mass Concrete","04 00 00 Masonry"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/","url":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/","name":"Back to basics: The four steps to creating effective concrete - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-f.jpg","datePublished":"2024-01-05T23:53:34+00:00","dateModified":"2025-04-14T19:30:02+00:00","description":"Successful specifications are clear, concise, correct, and complete; similarly, concrete success requires four essential steps.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/back-to-basics-the-four-steps-to-creating-effective-concrete\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-f.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Kendrick-Entrance-f.jpg","width":400,"height":200},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502","name":"arslan_ahmed","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","caption":"arslan_ahmed"},"url":"https:\/\/www.constructionspecifier.com\/author\/arslan_ahmed\/"}]}},"views":29724,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/207713","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/29853"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=207713"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/207713\/revisions"}],"predecessor-version":[{"id":211540,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/207713\/revisions\/211540"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/207716"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=207713"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=207713"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=207713"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}