{"id":207796,"date":"2024-01-12T16:00:54","date_gmt":"2024-01-12T21:00:54","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=207796"},"modified":"2024-01-11T15:05:08","modified_gmt":"2024-01-11T20:05:08","slug":"how-modern-building-enclosures-are-redefining-commercial-design","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/","title":{"rendered":"How modern building enclosures are redefining commercial design"},"content":{"rendered":"<figure id=\"attachment_207799\" aria-describedby=\"caption-attachment-207799\" style=\"width: 397px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207799\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-300x192.jpg\" alt=\"Photos courtesy Documodern LLC.\" width=\"397\" height=\"254\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-300x192.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-500x320.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-768x492.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300.jpg 800w\" sizes=\"auto, (max-width: 397px) 100vw, 397px\" \/><\/a><figcaption id=\"caption-attachment-207799\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\"><em>Photos courtesy Documodern LLC. <\/em><\/span><\/figcaption><\/figure>\n<p><strong>By Mike Smalley<\/strong><\/p>\n<p>Modern commercial design is witnessing a shift, driven by innovative building envelopes that deliver on aesthetics, functionality, and sustainability. The Forsyth Pointe project featured here is a testament to this evolution, showcasing how architecture is not only changing the city&#8217;s skyline but also reshaping its identity. Continue reading to learn about the challenges faced during its development, the successes achieved, and the broader implications for commercial design.<\/p>\n<p>The vast plains of the Midwest have always borne witness to transformation\u2014from the progression of the frontier days to the urban revivals of this century. Nowhere is this metamorphosis more apparent than the prominent business district of Clayton, Mo., an area fast becoming known for the architectural prowess of its changing skyline.<\/p>\n<p>In the realm of commercial real estate, modern office developments such as Forsyth Pointe in Clayton are raising the bar. As reported in the <em>St. Louis Business Journal<\/em>, the project represents a notable \u201cflight to quality\u201d trend which has taken full effect among tenants. Beyond a mere affinity for new facilities, there is a marked demand for buildings that exude high-end amenities and architectural features. Increasingly, today\u2019s tenants prioritize office space that echoes their brand\u2019s ethos\u2014spaces where quality, innovation, and sustainability are not just buzzwords but tangible facets.<\/p>\n<p>Look no further for an example of this trend than Emerson Electric\u2019s decision to relocate its company headquarters to Forsyth Pointe, which is already nearing capacity after opening earlier this year.<\/p>\n<p>Featuring a 0.4-ha (1-acre) garden terrace with putting greens, a fire pit, to custom-designed benches, and a fitness center, the $250 million Forsyth Pointe complex embodies a contemporary design. While the interiors of such buildings speak volumes about what their occupants value, it is their exteriors\u2014particularly the envelopes\u2014that often make the most immediate and lasting impressions.<\/p>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_207802\" aria-describedby=\"caption-attachment-207802\" style=\"width: 367px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-4_300.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207802\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-4_300-300x275.jpg\" alt=\"Forsyth Pointe in Clayton, Mo., features an intricate facade and high-performance glazing.\" width=\"367\" height=\"336\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-4_300-300x275.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-4_300-500x458.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-4_300-768x704.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-4_300.jpg 800w\" sizes=\"auto, (max-width: 367px) 100vw, 367px\" \/><\/a><figcaption id=\"caption-attachment-207802\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">Forsyth Pointe in Clayton, Mo., features an intricate facade and high-performance glazing.<\/span><\/figcaption><\/figure>\n<p><strong>Beyond the surface<\/strong><\/p>\n<p>Building envelopes, historically seen as a blend of aesthetics and protection against external elements, have evolved. Today, it is not just about the allure, but also about the immediate functionality and sustainability they offer. These essential components put the building exterior front and center, creating a powerful first impression amidst a fluctuating real estate market.<\/p>\n<p>Yet, quality in modern building design transcends outward appearance. Beyond aesthetic allure, the caliber of a building is gauged by its functionality\u2014particularly by its ability to regulate internal climates and improve energy efficiencies. Such is the indispensable role of the building envelope in contemporary architecture. Forsyth Pointe exemplifies this with its performance-based design approach, employing high-performance glazing and state-of-the-art insulation methods that not only bolster energy efficiency, but also adhere to stringent performance criteria. This technical foresight allows the integration of architectural elements that harness natural light and mitigate heat gain, a testament to the project\u2019s commitment to sustainable practices.<\/p>\n<p><strong>Pushing boundaries with facade installation<\/strong><\/p>\n<p>Specializing in providing building enclosure services, IWR North America\u2019s involvement with Forsyth Pointe showcases how specialty contractors play a pivotal role in bringing these new-age architectural visions to life. The expertise is not just in doing the work, but in navigating the unique challenges each project presents and devising innovative solutions.<\/p>\n<p>Crafted by Christner Architects, the vision for Forsyth Pointe was unequivocal: large units of glass, seamlessly integrated into the building, providing both form and function. This glass curtain wall exemplifies the high-end nature of the development and contemporary architectural trend that embraces large, transparent sections to maximize light and view.<\/p>\n<p>To bring this architectural vision to life, IWR North America was tasked with the installation of 27,406 m<sup>2<\/sup> (295,000 sf) of curtain walls. The complexity of Forsyth Pointe\u2019s facade was not merely in its size but in coordinating 23 distinct systems that contribute to the building\u2019s thermal, structural, and aesthetic integrity. From the transparency of high-performance glazing to the engineering of metal panels and attachment assemblies, each component played a critical role in the overall design.<\/p>\n<p>The advanced coordination required to align these systems ensured the high-performance glazing did not just meet the design intent visually, but also conformed to exacting thermal and structural specifications. This process went beyond product selection, involving a meticulous orchestration of systems and components to achieve a unified level of performance. This unity was critical to maintaining Christner\u2019s design intent, ensuring each line and contour met the building\u2019s performance requirements without compromising the envisioned aesthetic.<\/p>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_207798\" aria-describedby=\"caption-attachment-207798\" style=\"width: 393px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-3_300.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207798\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-3_300-300x227.jpg\" alt=\"The complex cladding and detailed metal work of Forsyth Pointe speak to today\u2019s architectural advancements, marking a shift in commercial design where every element is a blend of form and function.\" width=\"393\" height=\"297\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-3_300-300x227.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-3_300-500x378.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-3_300-768x580.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-3_300.jpg 800w\" sizes=\"auto, (max-width: 393px) 100vw, 393px\" \/><\/a><figcaption id=\"caption-attachment-207798\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">The complex cladding and detailed metal work of Forsyth Pointe speak to today\u2019s architectural advancements, marking a shift in commercial design where every element is a blend of form and function.<\/span><\/figcaption><\/figure>\n<p><strong>Crafting elegance with cladding and integration<\/strong><\/p>\n<p>Forsyth Pointe features the integration of opaque assemblies and glazed systems, presenting a facade that intertwines a palette of diverse materials\u2014from wood-look soffits to aluminum composite material (ACM) panels and oversized glazed units. Each element is thoughtfully coordinated, with transitions between materials crafted to achieve a visually unified structure that embodies the architectural vision down to the finest detail.<\/p>\n<p>Rick Neal, IWR\u2019s project superintendent with 25 years of glazing expertise, oversaw the merger of elements that formed the upper floors of the office towers. The challenge laid in the confluence of materials\u2014where the unitized curtain wall of the high rises met the unique glazing of lower levels, and where balconies interplayed with glass railings; all demanding a seamless orchestration of transitions. This dedication to cohesive design extended to the inclusion of features such as custom aluminum column covers, which offered both elegance and functional strength.<\/p>\n<p>The crux of Neal\u2019s task was ensuring all components conformed to the precise design intent. The alignment of multiple materials, each with its own lines and characteristics, had to present sightlines consistent with the facade\u2019s vision. This alignment was not confined to adjacent materials but was part of a continuous line\u2014such as the ACM band that crowned the top floors, dipped into terraces, and re-emerged in the glazing assemblies below. To realize this design, it was imperative for teams to work in tandem, with the glazing and sheet metal superintendents operating in lockstep to maintain the architect\u2019s envisioned sightlines.<\/p>\n<p>Adding to the complexity, the towers\u2019 rooflines featured an elaborate metal band that wrapped the top, marking the convergence of glass sections\u2014an aspect that posed considerable access challenges. Neal recounted the precise planning required to navigate the urban landscape beneath, ensuring the team\u2019s movements were not only efficient but also safe. This undertaking highlighted the critical nature of coordinating multiple disciplines and specialties to uphold the seamless aesthetic continuity while adhering to stringent safety standards.<\/p>\n<p>Additional thoughtful design choices were integrated with an eye on the building\u2019s long-term maintenance, including measures to ensure safe and efficient access for tasks such as window washing. This balance ensures the structure preserves its architectural presence, while simplifying the demands of continuous maintenance.<\/p>\n<p><strong>Problem-solving amidst urban constraints<\/strong><\/p>\n<p>Forsyth Pointe\u2019s development was a synchronized effort, encompassing both construction and an intricately planned logistics operation. With its limited spatial footprint, Forsyth Pointe demanded ingenuity in handling the transport, unloading, and installation of expansive curtain wall sections. Each of these sections, sprawling at 1.5 x 3 m (10 x 15 ft), was transported on oversized tractor trailers equipped with specially designed steel racks.<\/p>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_207803\" aria-describedby=\"caption-attachment-207803\" style=\"width: 373px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-5_300.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-207803\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-5_300-300x300.jpg\" alt=\"Transporting and installing Forsyth Pointe\u2019s vast curtain wall sections within Clayton\u2019s intricate urban layout emphasizes the effort and planning essential in realizing successful projects, showcasing the harmonious collaboration between design, construction, and logistical execution.\" width=\"373\" height=\"373\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-5_300-300x300.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-5_300-500x500.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-5_300-150x150.jpg 150w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-5_300-768x768.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-5_300.jpg 800w\" sizes=\"auto, (max-width: 373px) 100vw, 373px\" \/><\/a><figcaption id=\"caption-attachment-207803\" class=\"wp-caption-text\"><span style=\"font-size: 9pt; font-family: arial, helvetica, sans-serif;\">Transporting and installing Forsyth Pointe\u2019s vast curtain wall sections within Clayton\u2019s intricate urban layout emphasizes the effort and planning essential in realizing successful projects, showcasing the harmonious collaboration between design, construction, and logistical execution.<\/span><\/figcaption><\/figure>\n<p>Maneuvering such colossal loads cross-country and within the tight confines of Clayton\u2019s urban streetscape was no small feat. Over the course of the project, around 70 such sizable shipments journeyed from a Texas fabrication plant to the Clayton jobsite. This intricate logistical challenge demanded a seamless collaboration between IWR, its vendor partners, and general contractor, McCarthy Building Companies, Inc., to ensure deliveries were executed efficiently and with minimal disruption to Clayton\u2019s streets and neighboring structures.<\/p>\n<p><strong>Building for tomorrow, today<\/strong><\/p>\n<p>Forsyth Pointe rises in the heart of Clayton, transcending the role of mere architectural achievement to embody the modern marvels propelling innovation in commercial design. Embracing collaboration at every turn, it demonstrates that architecture today is not just about constructing buildings\u2014it is about sculpting spaces that reflect aspirations, values, and the pulse of evolving communities.<\/p>\n<p>The building envelope of Forsyth Pointe emerges as a striking declaration in its own right. As it gracefully rises against Clayton\u2019s urban backdrop, it underscores the synergy between function and artistry in today\u2019s architecture. In an age of transforming cityscapes, similar structures serve as inspiration and as reminders that the built environment is more than the sum of its materials. These structures stand as testaments to visionary thinking and the collective resolve that breathes vitality into them, charting a path toward a future where commercial design seamlessly integrates with ambition and innovation.<\/p>\n<p class=\"Sidebar-Bold\"><strong><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-207806 alignleft\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Smalley_Headshot-f.jpg\" alt=\"\" width=\"90\" height=\"90\" \/>Author<\/strong><\/p>\n<p class=\"Sidebar-BodyText\">Mike Smalley has more than 10 years of experience at IWR North America, a contractor specializing in building enclosures. As director of preconstruction, he excels in developing and deploying innovative solutions for complex building enclosures through the application of best practices. Smalley is dedicated to growing the business by fostering open discussions with contractors, designers, building owners, and consultants to deliver value-added opportunities. With a focus on excellence and collaboration, he contributes to the success of IWR as an industry-leading building enclosure contractor. Learn more at www.iwr-na.com.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Modern commercial design is witnessing a shift, driven by innovative building envelopes that deliver on aesthetics, functionality, and sustainability. The Forsyth Pointe project is a testament to this evolution, showcasing how architecture is not only changing the city&#8217;s skyline but also reshaping its identity. Continue reading to learn about the challenges faced during its development.<\/p>\n","protected":false},"author":29853,"featured_media":207804,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520],"tags":[2789,66,157,5094,1198,95,6711,9207],"class_list":["post-207796","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","tag-building-enclosure","tag-building-envelope","tag-cladding","tag-commercial-architecture","tag-division-08","tag-facade","tag-feature","tag-forsyth-pointe","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>How modern building enclosures are redefining commercial design - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"The Forsyth Pointe project testifies how architecture is changing the city&#039;s skyline and reshaping its identity.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"How modern building enclosures are redefining commercial design - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"The Forsyth Pointe project testifies how architecture is changing the city&#039;s skyline and reshaping its identity.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2024-01-12T21:00:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-f.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"arslan_ahmed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"arslan_ahmed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/\"},\"author\":{\"name\":\"arslan_ahmed\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\"},\"headline\":\"How modern building enclosures are redefining commercial design\",\"datePublished\":\"2024-01-12T21:00:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/\"},\"wordCount\":1603,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Forsyth-6_300-f.jpg\",\"keywords\":[\"Building enclosure\",\"building envelope\",\"Cladding\",\"Commercial Architecture\",\"Division 08\",\"facade\",\"Feature\",\"Forsyth Pointe\"],\"articleSection\":[\"Features\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/\",\"name\":\"How modern building enclosures are redefining commercial design - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Forsyth-6_300-f.jpg\",\"datePublished\":\"2024-01-12T21:00:54+00:00\",\"description\":\"The Forsyth Pointe project testifies how architecture is changing the city's skyline and reshaping its identity.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/how-modern-building-enclosures-are-redefining-commercial-design\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Forsyth-6_300-f.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2024\\\/01\\\/Forsyth-6_300-f.jpg\",\"width\":400,\"height\":200},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/e325f337715d3e25ed442febefc5e502\",\"name\":\"arslan_ahmed\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g\",\"caption\":\"arslan_ahmed\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/arslan_ahmed\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"How modern building enclosures are redefining commercial design - The Construction Specifier","description":"The Forsyth Pointe project testifies how architecture is changing the city's skyline and reshaping its identity.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/","next":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/2\/","og_locale":"en_US","og_type":"article","og_title":"How modern building enclosures are redefining commercial design - The Construction Specifier","og_description":"The Forsyth Pointe project testifies how architecture is changing the city's skyline and reshaping its identity.","og_url":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/","og_site_name":"The Construction Specifier","article_published_time":"2024-01-12T21:00:54+00:00","og_image":[{"width":400,"height":200,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-f.jpg","type":"image\/jpeg"}],"author":"arslan_ahmed","twitter_card":"summary_large_image","twitter_misc":{"Written by":"arslan_ahmed","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/"},"author":{"name":"arslan_ahmed","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502"},"headline":"How modern building enclosures are redefining commercial design","datePublished":"2024-01-12T21:00:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/"},"wordCount":1603,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-f.jpg","keywords":["Building enclosure","building envelope","Cladding","Commercial Architecture","Division 08","facade","Feature","Forsyth Pointe"],"articleSection":["Features"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/","url":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/","name":"How modern building enclosures are redefining commercial design - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-f.jpg","datePublished":"2024-01-12T21:00:54+00:00","description":"The Forsyth Pointe project testifies how architecture is changing the city's skyline and reshaping its identity.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/how-modern-building-enclosures-are-redefining-commercial-design\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-f.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2024\/01\/Forsyth-6_300-f.jpg","width":400,"height":200},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/e325f337715d3e25ed442febefc5e502","name":"arslan_ahmed","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8b3bc632ccc425475dad30606aef08d446e7b620e3a88e6fe3a7f806083c070b?s=96&d=mm&r=g","caption":"arslan_ahmed"},"url":"https:\/\/www.constructionspecifier.com\/author\/arslan_ahmed\/"}]}},"views":13760,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/207796","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/29853"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=207796"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/207796\/revisions"}],"predecessor-version":[{"id":207807,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/207796\/revisions\/207807"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/207804"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=207796"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=207796"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=207796"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}