{"id":210630,"date":"2025-01-13T15:43:27","date_gmt":"2025-01-13T20:43:27","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=210630"},"modified":"2025-01-29T11:43:14","modified_gmt":"2025-01-29T16:43:14","slug":"adaptive-reuse-from-historic-paper-mill-to-futuristic-museum","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/","title":{"rendered":"Adaptive reuse: From historic paper mill to futuristic museum"},"content":{"rendered":"<figure id=\"attachment_210631\" aria-describedby=\"caption-attachment-210631\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-210631 size-large\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-1-500x485.jpg\" alt=\"An interior view of a contemporary architectural space characterized by a large, curved, spiral structure that dominates the ceiling. The design incorporates a blend of natural and artificial light, highlighting a mixture of textures, including wood and stone. People are seen interacting within the area, some walking on a broad platform while others observe the surroundings.\" width=\"500\" height=\"485\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-1-500x485.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-1-300x291.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-1.jpg 688w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><figcaption id=\"caption-attachment-210631\" class=\"wp-caption-text\">A new circular opening in the factory\u2019s western facade will be the public entrance. <em>Images courtesy Norviska<\/em><\/figcaption><\/figure>\n<p>Following the anonymous design competition for the new Nikola Tesla Museum in Belgrade, Serbia, the jury selected the design submitted by Zaha Hadid Architects (ZHA) and Bureau Cube Partners of Serbia.<\/p>\n<p>Built by Belgrade industrialist Milan Vapa and opened in 1924 as the nation\u2019s first modern factory, the paper mill was decommissioned and used as a freight company\u2019s storage facility until it was abandoned.<\/p>\n<p>A new circular opening in the factory\u2019s western facade will be the public entrance leading visitors to the triple-height central atrium anchored by the historic chimney at the heart of the\u00a013,400-m<sup>2<\/sup> (14,4236 sf)\u00a0museum.<\/p>\n<p>Ellipsoidal sectional openings will be carved within the walls that divide the old factory\u2019s interior to enhance circulation and functionality in the building\u2019s continued life as a museum.<\/p>\n<p>The museum\u2019s first-floor galleries will incorporate historical artifacts, interactive displays, and immersive presentations, while temporary galleries will host an ever-changing program of exhibitions and events. Outside the building, Nikola Tesla Square will serve as a new public space for the city.<\/p>\n<figure id=\"attachment_210633\" aria-describedby=\"caption-attachment-210633\" style=\"width: 500px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-2-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-210633 size-large\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-2-1-500x357.jpg\" alt=\"The image shows a historic brick building featuring a tall chimney marked with the letters &quot;NTM.&quot; The structure has a sloped roof and large windows, with an entrance labeled &quot;NIKOLA.&quot; Surrounding the building are trees and a public square, where people are gathered. A roadway with vehicles is visible in the foreground.\" width=\"500\" height=\"357\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-2-1-500x357.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-2-1-300x214.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-2-1-768x549.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-2-1.jpg 774w\" sizes=\"auto, (max-width: 500px) 100vw, 500px\" \/><\/a><figcaption id=\"caption-attachment-210633\" class=\"wp-caption-text\">The new Nikola Tesla Museum will renovate Belgrade\u2019s historic Milan Vapa Paper Mill.<\/figcaption><\/figure>\n<p>The new Nikola Tesla Museum will renovate Belgrade\u2019s historic Milan Vapa Paper Mill into a cultural destination celebrating Tesla\u2019s legacy. It will preserve the city\u2019s architectural heritage and create various new public spaces for residents and visitors.<\/p>\n<p>The adaptive reuse of the 1920s structure will preserve its industrial heritage while upgrading its indoor and outdoor spaces. It will also make the venue a leading cultural venue with improved accessibility from the city.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After an anonymous competition, Zaha Hadid Architects (ZHA) was chosen to design the new Nikola Tesla Museum in Belgrade, Serbia.<\/p>\n","protected":false},"author":34186,"featured_media":210634,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[175,3283,9667,9666,9466],"class_list":["post-210630","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-adaptive-reuse","tag-museum","tag-nikola-tesla-museum","tag-serbia","tag-zaha-hadid-architects-zha","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Adaptive reuse: From historic paper mill to futuristic museum - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"After an anonymous competition, Zaha Hadid Architects (ZHA) was chosen to design the new Nikola Tesla Museum in Belgrade, Serbia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Adaptive reuse: From historic paper mill to futuristic museum - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"After an anonymous competition, Zaha Hadid Architects (ZHA) was chosen to design the new Nikola Tesla Museum in Belgrade, Serbia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-13T20:43:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-01-29T16:43:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-F.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"200\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"tanya_martins\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"tanya_martins\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/\"},\"author\":{\"name\":\"tanya_martins\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fce6c78e0d75dca19e94a5df6b1ff6a\"},\"headline\":\"Adaptive reuse: From historic paper mill to futuristic museum\",\"datePublished\":\"2025-01-13T20:43:27+00:00\",\"dateModified\":\"2025-01-29T16:43:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/\"},\"wordCount\":302,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/TM_NikolaTeslaMuseum-F.jpg\",\"keywords\":[\"adaptive reuse\",\"museum\",\"Nikola Tesla Museum\",\"Serbia\",\"Zaha Hadid Architects (ZHA)\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/\",\"name\":\"Adaptive reuse: From historic paper mill to futuristic museum - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/TM_NikolaTeslaMuseum-F.jpg\",\"datePublished\":\"2025-01-13T20:43:27+00:00\",\"dateModified\":\"2025-01-29T16:43:14+00:00\",\"description\":\"After an anonymous competition, Zaha Hadid Architects (ZHA) was chosen to design the new Nikola Tesla Museum in Belgrade, Serbia.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/TM_NikolaTeslaMuseum-F.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/01\\\/TM_NikolaTeslaMuseum-F.jpg\",\"width\":400,\"height\":200,\"caption\":\"An interior view of a contemporary architectural space characterized by a large, curved, spiral structure that dominates the ceiling. The design incorporates a blend of natural and artificial light, highlighting a mixture of textures, including wood and stone. People are seen interacting within the area, some walking on a broad platform while others observe the surroundings.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Adaptive reuse: From historic paper mill to futuristic museum\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fce6c78e0d75dca19e94a5df6b1ff6a\",\"name\":\"tanya_martins\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g\",\"caption\":\"tanya_martins\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/tanya_martins\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Adaptive reuse: From historic paper mill to futuristic museum - The Construction Specifier","description":"After an anonymous competition, Zaha Hadid Architects (ZHA) was chosen to design the new Nikola Tesla Museum in Belgrade, Serbia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/","og_locale":"en_US","og_type":"article","og_title":"Adaptive reuse: From historic paper mill to futuristic museum - The Construction Specifier","og_description":"After an anonymous competition, Zaha Hadid Architects (ZHA) was chosen to design the new Nikola Tesla Museum in Belgrade, Serbia.","og_url":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/","og_site_name":"The Construction Specifier","article_published_time":"2025-01-13T20:43:27+00:00","article_modified_time":"2025-01-29T16:43:14+00:00","og_image":[{"width":400,"height":200,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-F.jpg","type":"image\/jpeg"}],"author":"tanya_martins","twitter_card":"summary_large_image","twitter_misc":{"Written by":"tanya_martins","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/"},"author":{"name":"tanya_martins","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fce6c78e0d75dca19e94a5df6b1ff6a"},"headline":"Adaptive reuse: From historic paper mill to futuristic museum","datePublished":"2025-01-13T20:43:27+00:00","dateModified":"2025-01-29T16:43:14+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/"},"wordCount":302,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-F.jpg","keywords":["adaptive reuse","museum","Nikola Tesla Museum","Serbia","Zaha Hadid Architects (ZHA)"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/","url":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/","name":"Adaptive reuse: From historic paper mill to futuristic museum - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-F.jpg","datePublished":"2025-01-13T20:43:27+00:00","dateModified":"2025-01-29T16:43:14+00:00","description":"After an anonymous competition, Zaha Hadid Architects (ZHA) was chosen to design the new Nikola Tesla Museum in Belgrade, Serbia.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-F.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/01\/TM_NikolaTeslaMuseum-F.jpg","width":400,"height":200,"caption":"An interior view of a contemporary architectural space characterized by a large, curved, spiral structure that dominates the ceiling. The design incorporates a blend of natural and artificial light, highlighting a mixture of textures, including wood and stone. People are seen interacting within the area, some walking on a broad platform while others observe the surroundings."},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/adaptive-reuse-from-historic-paper-mill-to-futuristic-museum\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Adaptive reuse: From historic paper mill to futuristic museum"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fce6c78e0d75dca19e94a5df6b1ff6a","name":"tanya_martins","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g","caption":"tanya_martins"},"url":"https:\/\/www.constructionspecifier.com\/author\/tanya_martins\/"}]}},"views":9261,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/210630","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/34186"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=210630"}],"version-history":[{"count":3,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/210630\/revisions"}],"predecessor-version":[{"id":210881,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/210630\/revisions\/210881"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/210634"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=210630"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=210630"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=210630"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}