{"id":212132,"date":"2025-06-30T11:33:33","date_gmt":"2025-06-30T15:33:33","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=212132"},"modified":"2025-07-09T11:37:57","modified_gmt":"2025-07-09T15:37:57","slug":"just-a-trim-please-failure","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/","title":{"rendered":"Just a trim please"},"content":{"rendered":"<figure id=\"attachment_212135\" aria-describedby=\"caption-attachment-212135\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212135 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655.jpg\" alt=\"\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655-768x576.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-212135\" class=\"wp-caption-text\">Figure 1: Close-up view of splice joint in metal sill trim that extends into the window rough opening, resulting in a discontinuity between the perimeter primary seal of the ribbon window system and the exterior wall assembly\u2019s water-resistive air barrier (WRAB). <em>Photos courtesy Wiss, Janney, Elstner Associates (WJE)<\/em><\/figcaption><\/figure>\n<p>Coordinating the interface details of building enclosure systems is a common challenge during design and construction to ensure continuity of dedicated control layers (e.g. thermal, water-resistive air barriers [WRABs], etc.) between adjacent assemblies. This is particularly true where multiple trades are involved with the sequencing and installation of the various enclosure systems. In these cases, coordination of the transition trim components required to integrate the assemblies of different manufacturers properly is paramount.<\/p>\n<p>While maintaining continuity of the dedicated control layers of the building enclosure is generally understood by the design profession, transitional components incorporated into the enclosure assembly are often overlooked during pre-installation coordination efforts. This is because these components are commonly viewed as an aesthetic element of a specific enclosure assembly that would not adversely affect the performance of an adjacent system or overall enclosure.<\/p>\n<figure id=\"attachment_212136\" aria-describedby=\"caption-attachment-212136\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4412.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212136 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4412.jpg\" alt=\"\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4412.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4412-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4412-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4412-768x576.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-212136\" class=\"wp-caption-text\">Figure 2: Resultant leakage (at head of window system) during diagnostic testing of splice joint in metal trim above.<\/figcaption><\/figure>\n<p>The challenge is that when trim elements are modified during pre-construction efforts to accommodate project-specific conditions better, the potential exists for the modifications to inadvertently deviate from the original design intent of the overall enclosure or tested assembly. Another difficulty is that trim elements may require enhanced coordination to ensure continuity of the surrounding control layers, depending on their relative position and detailing within the wall system. This may require a trim component to be installed separately from the surrounding system to facilitate proper integration. In these instances, trim components need to be designed and installed with the same rigor as the enclosure assemblies to ensure better intended performance. It is also important to note that while such components may appear functional in two-dimensional drawings, planar transitions, splice joints, terminations, etc., need to be fully understood, and appropriate details developed and reinforced during the shop drawing, mock-up, and installation phases of the building construction.<\/p>\n<p>Some of the challenges mentioned above were encountered at a high-rise residential building where interface trim components of the metal panel cladding assembly were modified during construction in an attempt to simplify installation sequencing. In doing so, the trim component was extended into the rough opening of the adjacent aluminum-framed ribbon window system. This modification unintentionally interrupted the integration of the WRAB and aluminum-framed ribbon window system. As a result, the primary perimeter sealant for the window system was bonded to the leg of the metal trim within the rough opening rather than the WRAB, as originally designed. Due to installation sequencing, termination, and splice joint challenges, the trim utilized bed seals to ensure watertightness. Shortly after occupancy, widespread water leakage was reported along the windows. Investigative efforts determined that the bed seals were not continuous, which provided a direct pathway for water to bypass the control layer and enter the building.<\/p>\n<h2><strong>Authors<\/strong><\/h2>\n<p><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/Jeff-Sutterlin_headshot.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-212133 size-thumbnail\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/Jeff-Sutterlin_headshot-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>Jeffrey Sutterlin, PE, is an architectural engineer and associate principal with Wiss, Janney, Elstner Associates (WJE) in the New York\/Princeton office. He specializes in the design, investigation, and repair of building enclosures. He can be reached at jsutterlin@wje.com.<\/p>\n<p><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/Jadico_Headshot.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-212134 size-thumbnail\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/Jadico_Headshot-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>Jonathan Jadico is an architectural engineer and senior associate with Wiss, Janney, Elstner Associates (WJE) in Princeton, New Jersey. He specializes in the investigation and repair of building enclosures. He can be reached at jjadico@wje.com<\/p>\n","protected":false},"excerpt":{"rendered":"<p>While maintaining continuity of the dedicated control layers of the building enclosure is generally understood by the design profession, transitional components incorporated into the enclosure assembly are often overlooked.<\/p>\n","protected":false},"author":34186,"featured_media":212135,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,24],"tags":[96],"class_list":["post-212132","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-columns","category-failures","tag-failure","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Just a trim please - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"While maintaining continuity of the dedicated control layers of the building enclosure is generally understood by the design profession, transitional components incorporated into the enclosure assembly are often overlooked.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Just a trim please - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"While maintaining continuity of the dedicated control layers of the building enclosure is generally understood by the design profession, transitional components incorporated into the enclosure assembly are often overlooked.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2025-06-30T15:33:33+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-09T15:37:57+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"tanya_martins\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"tanya_martins\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/\"},\"author\":{\"name\":\"tanya_martins\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fce6c78e0d75dca19e94a5df6b1ff6a\"},\"headline\":\"Just a trim please\",\"datePublished\":\"2025-06-30T15:33:33+00:00\",\"dateModified\":\"2025-07-09T15:37:57+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/\"},\"wordCount\":606,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/IMG_4655.jpg\",\"keywords\":[\"failure\"],\"articleSection\":[\"Columns\",\"Failures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/\",\"name\":\"Just a trim please - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/IMG_4655.jpg\",\"datePublished\":\"2025-06-30T15:33:33+00:00\",\"dateModified\":\"2025-07-09T15:37:57+00:00\",\"description\":\"While maintaining continuity of the dedicated control layers of the building enclosure is generally understood by the design profession, transitional components incorporated into the enclosure assembly are often overlooked.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/IMG_4655.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/07\\\/IMG_4655.jpg\",\"width\":800,\"height\":600},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/just-a-trim-please-failure\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Just a trim please\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fce6c78e0d75dca19e94a5df6b1ff6a\",\"name\":\"tanya_martins\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g\",\"caption\":\"tanya_martins\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/tanya_martins\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Just a trim please - The Construction Specifier","description":"While maintaining continuity of the dedicated control layers of the building enclosure is generally understood by the design profession, transitional components incorporated into the enclosure assembly are often overlooked.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/","og_locale":"en_US","og_type":"article","og_title":"Just a trim please - The Construction Specifier","og_description":"While maintaining continuity of the dedicated control layers of the building enclosure is generally understood by the design profession, transitional components incorporated into the enclosure assembly are often overlooked.","og_url":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/","og_site_name":"The Construction Specifier","article_published_time":"2025-06-30T15:33:33+00:00","article_modified_time":"2025-07-09T15:37:57+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655.jpg","type":"image\/jpeg"}],"author":"tanya_martins","twitter_card":"summary_large_image","twitter_misc":{"Written by":"tanya_martins","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/"},"author":{"name":"tanya_martins","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fce6c78e0d75dca19e94a5df6b1ff6a"},"headline":"Just a trim please","datePublished":"2025-06-30T15:33:33+00:00","dateModified":"2025-07-09T15:37:57+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/"},"wordCount":606,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655.jpg","keywords":["failure"],"articleSection":["Columns","Failures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/","url":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/","name":"Just a trim please - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655.jpg","datePublished":"2025-06-30T15:33:33+00:00","dateModified":"2025-07-09T15:37:57+00:00","description":"While maintaining continuity of the dedicated control layers of the building enclosure is generally understood by the design profession, transitional components incorporated into the enclosure assembly are often overlooked.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/07\/IMG_4655.jpg","width":800,"height":600},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/just-a-trim-please-failure\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Just a trim please"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fce6c78e0d75dca19e94a5df6b1ff6a","name":"tanya_martins","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g","caption":"tanya_martins"},"url":"https:\/\/www.constructionspecifier.com\/author\/tanya_martins\/"}]}},"views":6780,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/212132","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/34186"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=212132"}],"version-history":[{"count":1,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/212132\/revisions"}],"predecessor-version":[{"id":212137,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/212132\/revisions\/212137"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/212135"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=212132"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=212132"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=212132"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}