{"id":212552,"date":"2025-08-11T10:04:23","date_gmt":"2025-08-11T14:04:23","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=212552"},"modified":"2025-09-11T15:34:02","modified_gmt":"2025-09-11T19:34:02","slug":"door-specifications-achieving-code-compliant-design-flexibility","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/","title":{"rendered":"Door specifications: Achieving code-compliant design flexibility"},"content":{"rendered":"<figure id=\"attachment_212553\" aria-describedby=\"caption-attachment-212553\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212553 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL.jpg\" alt=\"A modern healthcare corridor with glass-walled offices; a person walks by while another sits at a desk in the provider workroom.\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL-768x576.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-212553\" class=\"wp-caption-text\">Photos courtesy AD Systems<\/figcaption><\/figure>\n<p>Flexible design allows a facility to offer occupants more functional interiors in the present while supporting the ability to shift and adapt to future needs. This approach to design can benefit almost any project, but healthcare facilities, in particular, often see several far-reaching benefits from optimizing flexibility.<\/p>\n<p>For example, a flexibly designed medical center can help medical professionals more easily move patients with mobility challenges to specialized care. It can also help providers use spaces in multiple configurations in response to patient needs on any given day. Both aspects improve outcomes and patient experience. Flexible design can also allow these spaces to more readily incorporate new technologies, which may further improve the level of care possible within these facilities.<\/p>\n<p>When a building is planned to be flexible, it often enjoys a longer lifespan than more stagnant architecture. On one hand, this reduces the need to plan for costly renovations and other construction, which may help healthcare organizations develop and improve general and specialized care. On the other, flexible design also reduces construction\u2019s environmental impact, allowing a building, or a part of a building, to be easily modified to fit a new purpose. These goals are important since the cost of new healthcare construction has seen year-over-year increases over the past five years. Likewise, the emphasis on sustainable construction has been underscored as the building industry inches closer to 2030 net-zero goals.<\/p>\n<p>While many parts of the built environment have the potential to contribute to a flexibly designed space, doors represent a cost-effective and highly impactful means to improve a building\u2019s ability to adapt to changes in use and occupant need. This is particularly true of sliding doors and other systems that allow for more flexible openings. That said, when planning more flexible spaces, specifiers will still need to meet building codes and accessibility requirements, both of which can seem to work against this design approach. This article will define design flexibility, review relevant code requirements, and offer solutions to resolve challenges of incorporating design flexibility into a project.<\/p>\n<figure id=\"attachment_212554\" aria-describedby=\"caption-attachment-212554\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_073.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212554 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_073.jpg\" alt=\"A modern interior of a secure room featuring a table with chairs, a wall-mounted monitor, and a staff member standing nearby.\" width=\"800\" height=\"600\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_073.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_073-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_073-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_073-768x576.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-212554\" class=\"wp-caption-text\">Bi-parting sliding doors support accessibility requirements while preserving usable square footage.<\/figcaption><\/figure>\n<figure id=\"attachment_212555\" aria-describedby=\"caption-attachment-212555\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/ADSYS-PacMed-12.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212555 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/ADSYS-PacMed-12.jpg\" alt=\"A bright, modern hallway with wooden doors leading to rooms, featuring hand sanitizer stations and clear signage.\" width=\"800\" height=\"572\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/ADSYS-PacMed-12.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/ADSYS-PacMed-12-300x215.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/ADSYS-PacMed-12-500x358.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/ADSYS-PacMed-12-768x549.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-212555\" class=\"wp-caption-text\">Minimizing approach and maneuvering requirements, commercial sliding doors contribute to more accessible designs for \u2028tight spaces.<\/figcaption><\/figure>\n<h2>What is design flexibility?<\/h2>\n<p>While intended building use can change what design flexibility means, generally, the term refers to considerations that allow a building to evolve, within reason, over time in response to changes in end-user needs. Since shifts in operational requirements would not necessarily render a flexibly designed building obsolete, this approach to design helps secure longer lifespans for facilities.<\/p>\n<p>Design flexibility can hinge on active considerations, such as movable partitions, multi-use spaces, open floor plans, wide corridors and high-capacity service areas. It can also consist of passive elements, including the ability to incorporate modular structures to expand floorplans efficiently. Further, there are three types of design flexibility, depending on which changes a floor plan or building element allows for. First, adaptability refers to the capacity of the built environment to accommodate multiple functions. Next, transformability indicates the degree to which a building can be changed in response to certain conditions. Finally, convertibility describes how readily modifiable a building is.<\/p>\n<p>All of these considerations can come together when a designer is seeking to optimize the overall flexibility of a healthcare space. As an example, a medical center can be made more flexible by planning wider openings that support the movement of large equipment or by specifying oversized sliding doors that allow two adjacent spaces to transform into one large space when needed. Finally, space-efficient and flexible width doors can preserve useable square footage to free up space for overflow areas when a facility needs to manage surges of incoming patients.<\/p>\n<p>In these examples, the strategies used to achieve more flexibility support the general useability of a space while leaving options open for future developments in occupant needs. These considerations continue to be a crucial aspect of healthcare design as more medical centers have consolidated multiple types of care within the same facility.<\/p>\n<figure id=\"attachment_212556\" aria-describedby=\"caption-attachment-212556\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/DualSwing-with-ExamSlide.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212556 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/DualSwing-with-ExamSlide.jpg\" alt=\"A modern hospital patient room featuring a bed, seating area, and a private bathroom with accessibility features.\" width=\"800\" height=\"533\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/DualSwing-with-ExamSlide.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/DualSwing-with-ExamSlide-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/DualSwing-with-ExamSlide-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/DualSwing-with-ExamSlide-768x512.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-212556\" class=\"wp-caption-text\">Sliding and flexible swing doors can be used in tandem to maximize accessibility, optimize space use, and meet code requirements for inpatient rooms.<\/figcaption><\/figure>\n<h2>How do building code requirements \u2028impact flexible interiors?<\/h2>\n<p>While not every strategy for incorporating elements of design flexibility will be significantly impacted by accessibility and building code requirements, many are\u2014including the use of space-efficient and flexible opening door systems. These requirements can dictate opening width minimums, approach and maneuvering clearances, opening force maximums, and much more. In addition, the use of a room can be limited due to a door\u2019s dimensions and operation, based on code requirements. As such, code-compliant door specifications can sometimes feel at odds with planning more flexible built environments.<\/p>\n<p>However, knowing these requirements can help guide specifiers in choosing door systems that meet codes and maximize flexibility. To simplify the discussion, this article will focus on model code requirements within the National Fire Protection Association (NFPA) codes and the International Building Code (IBC). It is recommended, however, that building professionals consult with local codes and clarify with an authority having jurisdiction (AHJ) to ensure their plans meet all requirements relevant to a project\u2019s specific location, use, and context.<\/p>\n<figure id=\"attachment_212557\" aria-describedby=\"caption-attachment-212557\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto\u252c\u23102024_nbbj_lchnicu_7.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212557 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto\u252c\u23102024_nbbj_lchnicu_7.jpg\" alt=\"A modern hospital corridor with staff interacting, featuring a glass door office with computer workstations and accessible design elements.\" width=\"800\" height=\"533\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto\u252c\u23102024_nbbj_lchnicu_7.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto\u252c\u23102024_nbbj_lchnicu_7-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto\u252c\u23102024_nbbj_lchnicu_7-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto\u252c\u23102024_nbbj_lchnicu_7-768x512.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-212557\" class=\"wp-caption-text\">Sliding doors with premium acoustic performance support provider workspaces by mitigating \u2028sound transfer.<\/figcaption><\/figure>\n<p>According to the NFPA and IBC, most doors in healthcare settings need to have a clear opening width of at least 813 mm (32 in.). This includes exam rooms, patient rooms, restrooms, doors within healthcare suites, respite rooms, and more. There are two general exceptions.<\/p>\n<p>The NFPA allows doors to have a minimum opening clearance of 711 mm (28 in.) if a room is under 6.5 m<sup>2<\/sup> (70 sf) and is not required to be wheelchair accessible. The IBC echoes this exception for resident sleeping units that are not required to be wheelchair accessible. Alternatively, in Group I-2 occupancies, which include hospitals and nursing homes, doors along the means of egress that need to accommodate the movement of beds must provide opening widths of at least 1,054 mm (41.5 in.).<\/p>\n<figure id=\"attachment_212558\" aria-describedby=\"caption-attachment-212558\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_5.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212558 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_5.jpg\" alt=\"A healthcare professional stands outside a hospital room with a scenic illustration on the door, while a patient relaxes inside.\" width=\"800\" height=\"533\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_5.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_5-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_5-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_5-768x512.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-212558\" class=\"wp-caption-text\">Flexible opening swing doors provide wide openings when needed and minimal swing arcs for \u2028day-to-day use.<\/figcaption><\/figure>\n<figure id=\"attachment_212559\" aria-describedby=\"caption-attachment-212559\" style=\"width: 800px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212559 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_1.jpg\" alt=\"A modern hospital reception area with a circular ceiling light, staff interacting at the desk, and patients in the background.\" width=\"800\" height=\"533\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_1.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_1-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_1-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/triggsphoto2024_nbbj_lchnicu_1-768x512.jpg 768w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-212559\" class=\"wp-caption-text\">Flexible openings can contribute to future-proofing strategies while supporting more functional ICU design.<\/figcaption><\/figure>\n<p>In addition, for rooms with an occupancy load of 10 or more people, at least one egress door needs to swing out in the direction of egress. This requirement, along with the varying widths in door size, can inhibit flexibility by limiting what a space can be used for based solely on the door system that leads into it. Further, these requirements may make it more difficult to optimize interior space, which can indirectly complicate more flexibly designed health care facilities.<\/p>\n<h2>How do accessibility standards \u2028impact door specification?<\/h2>\n<p>In addition to opening width clearances and other model building code standards, accessibility standards listed in the Americans with Disabilities Act (ADA) also detail requirements for hardware, opening force maximums, and approach and maneuvering clearances. While door hardware and opening force requirements can impact door specification, maneuvering clearances more readily impact flexible design goals.<\/p>\n<p>Maneuvering clearances vary based on opening direction, direction of approach, door hardware, and door width. These measurements include the spaces parallel and perpendicular to the opening. For example, front approaches for swing doors require 1,524 mm (60 in.) perpendicular to the pull side of the door and the opening width plus \u2028457 to 610 mm (18 to 24 in.) of additional space on the latch side parallel to the door. For the push side, they require 1,219 mm (48 in.) perpendicular to the door and the opening width size for the space parallel to the door. If the door includes \u2028a latch and closer, it will require an additional \u2028305 mm (12 in.) of parallel space.<\/p>\n<p>Sliding doors only require the perpendicular space to measure 1,219 mm (48 in.) and the parallel space to be the door width for front approaches. As such, they can help designers meet these standards in a space-efficient way while also preserving square footage by eliminating swing arc trajectories.<\/p>\n<p>It is important to note that maneuvering clearances can be more for doors in a series or within vestibules. Allowances for maneuvering clearances also depend on where the doors are located. For instance, in multi-stall restrooms, no elements can overlap door maneuvering clearances. However, in family, assisted-use, or single-user toilet rooms where there is unobstructed wheelchair space beyond the door swing, doors can swing into fixture clearance areas and still comply with these standards. Specifiers can refer to section 4.13.6 in the ADA standards for a complete overview of approach clearance requirements.<\/p>\n<figure id=\"attachment_212560\" aria-describedby=\"caption-attachment-212560\" style=\"width: 536px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/McKayDeeOncology_2I5A7722_BLAKELY_DN.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-212560 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/McKayDeeOncology_2I5A7722_BLAKELY_DN.jpg\" alt=\"\" width=\"536\" height=\"800\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/McKayDeeOncology_2I5A7722_BLAKELY_DN.jpg 536w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/McKayDeeOncology_2I5A7722_BLAKELY_DN-201x300.jpg 201w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/McKayDeeOncology_2I5A7722_BLAKELY_DN-335x500.jpg 335w\" sizes=\"auto, (max-width: 536px) 100vw, 536px\" \/><\/a><figcaption id=\"caption-attachment-212560\" class=\"wp-caption-text\">Sliding doors \u2028optimize space use for flexibility and patient care. <em>Photo \u00a9Alan Blakely Photography<\/em><\/figcaption><\/figure>\n<h2>Meeting code requirements\u2028and contributing to flexibility<\/h2>\n<p>Most commercial door systems can meet a wide range of building and accessibility code requirements. However, not all of these systems can significantly contribute to design flexibility. For instance, swing doors, especially when they exceed minimum widths, can require more space to account for their swing arc trajectories as well as their approach and maneuvering clearances. As such, designers may not be able to specify oversized doors, which inhibits the ability for a space to accommodate the movement of equipment or to be used in different configurations. They may also not be able to plan for overflow spaces, as square footage will be relegated to accounting for accessible door operation.<\/p>\n<p>Offering an alternative, commercial sliding doors and flexible swing doors can preserve useable square footage while meeting building and accessibility requirements. For example, because sliding doors do not require additional space for maneuvering clearances or swing arc trajectories, they can save up to 2.8 m<sup>2<\/sup> (30 sf) per door. These savings accumulate across an entire floor, so designers can use this to plan more exam rooms or flexible overflow spaces to handle patient surges. Likewise, these doors can be specified in larger-than-average opening widths to help medical professionals maximize the usage potential for provider-only spaces.<\/p>\n<p>It is important to note that accessibility standards only require one door leaf to meet the clearances listed in the ADA. With this in mind, specifiers can choose swing doors with auxiliary leaves to meet minimum requirements for daily use. Occupants can then engage the auxiliary leaf for a wider opening when needed. As a result, these doors can help spaces adapt to changing needs without requiring large clearances for day-to-day use.<\/p>\n<h2>How can multiple door systems work toward consistency?<\/h2>\n<p>When one type of door system cannot meet all code requirements for every application, specifiers can use several door types to ensure code compliance and design flexibility are not mutually exclusive. However, using multiple door systems can create complications at several junctures in the construction process.<\/p>\n<p>At the specification and purchasing stage, selecting multiple door types within a building can make planning for lead times more difficult, especially when these systems come from multiple suppliers or manufacturers. Further, unforeseen delays in fabrication and shipping can also throw wrinkles into a construction timeline. Specifiers can sideline these potential issues by choosing door manufacturers that can provide multiple types of door systems. Not only does this help project stakeholders reduce the chance of complications, but it also allows more control over shipment schedules. This control can work well in projects that use modular and prefabricated construction by streamlining delivery timelines to ensure an uncluttered jobsite.<\/p>\n<p>A highly controlled shipment schedule is not the only benefit to a single-source approach to door specification. When door systems come from the same manufacturer, it can simplify and standardize installation and maintenance to minimize complications during the construction and use phases of a project. In addition, a single-source door manufacturer can also standardize hardware. This helps create both a unified look and universal operation, both of which are key drivers in healthcare settings where patient experience and comfort are uniquely important.<\/p>\n<h2>Plan for doors that contribute multiple value points<\/h2>\n<p>Door specification can contribute more to a building than code compliance. Doors that provide flexible opening widths, preserve useable square footage, and offer consistency across the built environment can support several aspects of design flexibility. Likewise, when these doors come from a single source with a proven track record, they can streamline construction to minimize delays at multiple points in the building process.<\/p>\n<p>While commercial sliding doors and flexible-opening swing doors can contribute a large amount of value to a project\u2019s interior on their own, this value can be increased when building professionals collaborate with door manufacturers throughout the construction process. This can help ensure the systems specified meet local code requirements and help project teams build custom solutions for challenging healthcare projects.<\/p>\n<p>Finally, it is important to note that doors remain one of the most touched parts of any building. As such, they can significantly impact space\u2019s functionality. This goes beyond design flexibility. When doors facilitate more accessible designs and intuitive use, they can improve occupant experience, comfort, and wellbeing. This can be especially imperative in healthcare settings, which makes planning for door standardization incredibly valuable for these occupancy types.<\/p>\n<h2>Author<\/h2>\n<p><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/Gannon_Headshot.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-212561 size-thumbnail\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/Gannon_Headshot-150x150.jpg\" alt=\"\" width=\"150\" height=\"150\" \/><\/a><\/p>\n<p>Tysen Gannon, LEED AP, from AD Systems has more than 15 years of experience in the architectural products industry, including roles \u2028in sales, product management, research and marketing, with a focus on glass and glazing, fenestration and facade systems.<\/p>\n<h2>Key Takeaways<\/h2>\n<p>Flexible design is essential in healthcare facilities, enabling spaces to adapt to shifting patient needs, technologies, and care models. Features such as oversized sliding doors and flexible-opening systems can improve accessibility, optimize square footage, and future-proof interiors. However, specifiers must still navigate the <em>International Building Code<\/em> (<em>IBC<\/em>), National Fire Protection Association (NFPA) standards, and <em>Americans with Disabilities Act<\/em> (<em>ADA<\/em>) requirements to ensure code compliance. By selecting door systems that meet both flexibility and code demands\u2014and sourcing from a single manufacturer\u2014teams can streamline construction, enhance patient experience, and extend a facility\u2019s usable lifespan. Flexible doors offer performance, adaptability, and consistency.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Flexible design allows a facility to offer occupants more functional interiors in the present while supporting the ability to shift and adapt to future needs. This approach to design can benefit almost any project, but healthcare facilities, in particular, often see several far-reaching benefits from optimizing flexibility. For example, a flexibly designed medical center can&hellip; <a class=\"more-link\" href=\"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/\">Continue reading <span class=\"screen-reader-text\">Door specifications: Achieving code-compliant design flexibility<\/span><\/a><\/p>\n","protected":false},"author":34186,"featured_media":212553,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,188,273,274,278],"tags":[1002,1198,4935,830],"class_list":["post-212552","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-08-00-00-openings","category-08-10-00-doors-and-frames","category-08-30-00-specialty-doors-and-frames","category-08-70-00-hardware","tag-accessibility","tag-division-08","tag-door-systems","tag-healthcare-design","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Door specifications: Achieving code-compliant design flexibility - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Door specifications: Achieving code-compliant design flexibility - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Flexible design allows a facility to offer occupants more functional interiors in the present while supporting the ability to shift and adapt to future needs. This approach to design can benefit almost any project, but healthcare facilities, in particular, often see several far-reaching benefits from optimizing flexibility. For example, a flexibly designed medical center can&hellip; Continue reading Door specifications: Achieving code-compliant design flexibility\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2025-08-11T14:04:23+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-09-11T19:34:02+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"tanya_martins\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"tanya_martins\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"13 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/\"},\"author\":{\"name\":\"tanya_martins\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fce6c78e0d75dca19e94a5df6b1ff6a\"},\"headline\":\"Door specifications: Achieving code-compliant design flexibility\",\"datePublished\":\"2025-08-11T14:04:23+00:00\",\"dateModified\":\"2025-09-11T19:34:02+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/\"},\"wordCount\":2364,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/UK_Hospital_12floor_048_FULL.jpg\",\"keywords\":[\"Accessibility\",\"Division 08\",\"door systems\",\"Healthcare design\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"08 00 00 Openings\",\"08 10 00 Doors and Frames\",\"08 30 00 Specialty Doors and Frames\",\"08 70 00 Hardware\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/\",\"name\":\"Door specifications: Achieving code-compliant design flexibility - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/UK_Hospital_12floor_048_FULL.jpg\",\"datePublished\":\"2025-08-11T14:04:23+00:00\",\"dateModified\":\"2025-09-11T19:34:02+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/UK_Hospital_12floor_048_FULL.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2025\\\/09\\\/UK_Hospital_12floor_048_FULL.jpg\",\"width\":800,\"height\":600,\"caption\":\"A modern healthcare corridor with glass-walled offices; a person walks by while another sits at a desk in the provider workroom.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/door-specifications-achieving-code-compliant-design-flexibility\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Door specifications: Achieving code-compliant design flexibility\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fce6c78e0d75dca19e94a5df6b1ff6a\",\"name\":\"tanya_martins\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g\",\"caption\":\"tanya_martins\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/tanya_martins\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Door specifications: Achieving code-compliant design flexibility - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/","og_locale":"en_US","og_type":"article","og_title":"Door specifications: Achieving code-compliant design flexibility - The Construction Specifier","og_description":"Flexible design allows a facility to offer occupants more functional interiors in the present while supporting the ability to shift and adapt to future needs. This approach to design can benefit almost any project, but healthcare facilities, in particular, often see several far-reaching benefits from optimizing flexibility. For example, a flexibly designed medical center can&hellip; Continue reading Door specifications: Achieving code-compliant design flexibility","og_url":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/","og_site_name":"The Construction Specifier","article_published_time":"2025-08-11T14:04:23+00:00","article_modified_time":"2025-09-11T19:34:02+00:00","og_image":[{"width":800,"height":600,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL.jpg","type":"image\/jpeg"}],"author":"tanya_martins","twitter_card":"summary_large_image","twitter_misc":{"Written by":"tanya_martins","Est. reading time":"13 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/"},"author":{"name":"tanya_martins","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fce6c78e0d75dca19e94a5df6b1ff6a"},"headline":"Door specifications: Achieving code-compliant design flexibility","datePublished":"2025-08-11T14:04:23+00:00","dateModified":"2025-09-11T19:34:02+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/"},"wordCount":2364,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL.jpg","keywords":["Accessibility","Division 08","door systems","Healthcare design"],"articleSection":["Features","MasterFormat","08 00 00 Openings","08 10 00 Doors and Frames","08 30 00 Specialty Doors and Frames","08 70 00 Hardware"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/","url":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/","name":"Door specifications: Achieving code-compliant design flexibility - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL.jpg","datePublished":"2025-08-11T14:04:23+00:00","dateModified":"2025-09-11T19:34:02+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2025\/09\/UK_Hospital_12floor_048_FULL.jpg","width":800,"height":600,"caption":"A modern healthcare corridor with glass-walled offices; a person walks by while another sits at a desk in the provider workroom."},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/door-specifications-achieving-code-compliant-design-flexibility\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Door specifications: Achieving code-compliant design flexibility"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fce6c78e0d75dca19e94a5df6b1ff6a","name":"tanya_martins","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e2c04a5d7eab5107347f73e92112a5c08e05d787b4cf5fe113518f61234fa266?s=96&d=mm&r=g","caption":"tanya_martins"},"url":"https:\/\/www.constructionspecifier.com\/author\/tanya_martins\/"}]}},"views":7036,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/212552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/34186"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=212552"}],"version-history":[{"count":1,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/212552\/revisions"}],"predecessor-version":[{"id":212562,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/212552\/revisions\/212562"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/212553"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=212552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=212552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=212552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}