{"id":215356,"date":"2026-09-08T09:15:46","date_gmt":"2026-09-08T13:15:46","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=215356"},"modified":"2026-09-08T09:15:46","modified_gmt":"2026-09-08T13:15:46","slug":"historic-building-in-boston-gets-all-electric-retrofit","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/","title":{"rendered":"Historic building in Boston gets all-electric retrofit"},"content":{"rendered":"<figure id=\"attachment_215357\" aria-describedby=\"caption-attachment-215357\" style=\"width: 1024px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-215357\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-scaled.jpg\" alt=\"Three-panel collage of ornate neoclassical urban buildings, including a fa\u00e7ade with an American flag and a central entrance marked \u201c26.\u201d\" width=\"1024\" height=\"512\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-scaled.jpg 1024w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-300x150.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-500x250.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-768x384.jpg 768w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption id=\"caption-attachment-215357\" class=\"wp-caption-text\">The project followed National Park Service guidelines. <em>Photos by Anton Grassl<\/em><\/figcaption><\/figure>\n<p>CambridgeSeven has completed a five-year renovation of 26 Court St., Boston\u2019s oldest continuously city-owned property. The retrofit converts the 16.26 m<sup>2<\/sup> (175,000 sf), 11-story building into an all-electric, fossil fuel-free municipal workplace.<\/p>\n<p>The city has owned the property since 1635. The current building dates to 1912 and was designed by Edward T. P. Graham as the City Hall Annex. It later housed the Boston School Department.<\/p>\n<p>CambridgeSeven preserved 89 percent of the original limestone, brick, and cast stone structure while modernizing the building\u2019s systems. The project followed National Park Service (NPS) guidelines and restored the Neoclassical Revival facade, including its cornices and stone ornamentation.<\/p>\n<p>The team replaced the original windows with high-performance glazing and installed new insulation and mechanical systems. A new transformer vault replaced infrastructure associated with the building\u2019s former coal-fired boilers.<\/p>\n<p>The renovation also redesigned the lobby and office floors. Designers exposed original riveted steel columns and added durable wood accents and terrazzo flooring. The ground floor now includes public spaces such as a gallery corridor, a public bid room, and a public meeting room.<\/p>\n<figure id=\"attachment_215358\" aria-describedby=\"caption-attachment-215358\" style=\"width: 1024px\" class=\"wp-caption aligncenter\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-2-scaled.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-215358\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-2-scaled.jpg\" alt=\"Modern wood-paneled lobby with a reception desk, people, lounge seating, and large street-facing windows.\" width=\"1024\" height=\"576\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-2-scaled.jpg 1024w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-2-300x169.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-2-500x281.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-2-768x432.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-2-1536x864.jpg 1536w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-2-1568x882.jpg 1568w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/a><figcaption id=\"caption-attachment-215358\" class=\"wp-caption-text\">The retrofit is on track for LEED Platinum certification.<\/figcaption><\/figure>\n<p>Outside, the team widened the sidewalk to create a universally accessible plaza with EV charging stations, bike racks, flagpoles, historic granite slabs, and accessible ramps.<\/p>\n<p>The project is on track for LEED Platinum certification. CambridgeSeven said the adaptive reuse reduced embodied carbon emissions by 70 percent compared with new construction.<\/p>\n<p>Building Conservation Associates served as the preservation consultant. Stefanie Greenfield, a CambridgeSeven principal, led the project\u2019s design effort.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>See how CambridgeSeven preserved 89 percent of the original limestone, brick, and cast stone structure while modernizing the building.<\/p>\n","protected":false},"author":35591,"featured_media":215357,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[3351,8613],"class_list":["post-215356","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-boston","tag-cambridgeseven","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Historic building in Boston gets all-electric retrofit - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"See how CambridgeSeven preserved 89 percent of the original limestone, brick, and cast stone structure while modernizing the building.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Historic building in Boston gets all-electric retrofit - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"See how CambridgeSeven preserved 89 percent of the original limestone, brick, and cast stone structure while modernizing the building.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2026-09-08T13:15:46+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-scaled.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"512\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"amrit_bls\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"amrit_bls\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/\"},\"author\":{\"name\":\"amrit_bls\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/0c4de6fcfc742337de86ffbb2fb63778\"},\"headline\":\"Historic building in Boston gets all-electric retrofit\",\"datePublished\":\"2026-09-08T13:15:46+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/\"},\"wordCount\":283,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Boston-1-scaled.jpg\",\"keywords\":[\"Boston\",\"CambridgeSeven\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/\",\"name\":\"Historic building in Boston gets all-electric retrofit - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Boston-1-scaled.jpg\",\"datePublished\":\"2026-09-08T13:15:46+00:00\",\"description\":\"See how CambridgeSeven preserved 89 percent of the original limestone, brick, and cast stone structure while modernizing the building.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Boston-1-scaled.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/Boston-1-scaled.jpg\",\"width\":1024,\"height\":512,\"caption\":\"The project followed National Park Service guidelines. Photos by Anton Grassl\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/historic-building-in-boston-gets-all-electric-retrofit\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Historic building in Boston gets all-electric retrofit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/0c4de6fcfc742337de86ffbb2fb63778\",\"name\":\"amrit_bls\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/224a29f848416e19f02b122ce7adec678f6616e1bef3ee1a2579445bf8d29427?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/224a29f848416e19f02b122ce7adec678f6616e1bef3ee1a2579445bf8d29427?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/224a29f848416e19f02b122ce7adec678f6616e1bef3ee1a2579445bf8d29427?s=96&d=mm&r=g\",\"caption\":\"amrit_bls\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/amrit_bls\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Historic building in Boston gets all-electric retrofit - The Construction Specifier","description":"See how CambridgeSeven preserved 89 percent of the original limestone, brick, and cast stone structure while modernizing the building.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/","og_locale":"en_US","og_type":"article","og_title":"Historic building in Boston gets all-electric retrofit - The Construction Specifier","og_description":"See how CambridgeSeven preserved 89 percent of the original limestone, brick, and cast stone structure while modernizing the building.","og_url":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/","og_site_name":"The Construction Specifier","article_published_time":"2026-09-08T13:15:46+00:00","og_image":[{"width":1024,"height":512,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-scaled.jpg","type":"image\/jpeg"}],"author":"amrit_bls","twitter_card":"summary_large_image","twitter_misc":{"Written by":"amrit_bls","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/"},"author":{"name":"amrit_bls","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/0c4de6fcfc742337de86ffbb2fb63778"},"headline":"Historic building in Boston gets all-electric retrofit","datePublished":"2026-09-08T13:15:46+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/"},"wordCount":283,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-scaled.jpg","keywords":["Boston","CambridgeSeven"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/","url":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/","name":"Historic building in Boston gets all-electric retrofit - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-scaled.jpg","datePublished":"2026-09-08T13:15:46+00:00","description":"See how CambridgeSeven preserved 89 percent of the original limestone, brick, and cast stone structure while modernizing the building.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-scaled.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2026\/09\/Boston-1-scaled.jpg","width":1024,"height":512,"caption":"The project followed National Park Service guidelines. Photos by Anton Grassl"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/historic-building-in-boston-gets-all-electric-retrofit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Historic building in Boston gets all-electric retrofit"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/0c4de6fcfc742337de86ffbb2fb63778","name":"amrit_bls","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/224a29f848416e19f02b122ce7adec678f6616e1bef3ee1a2579445bf8d29427?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/224a29f848416e19f02b122ce7adec678f6616e1bef3ee1a2579445bf8d29427?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/224a29f848416e19f02b122ce7adec678f6616e1bef3ee1a2579445bf8d29427?s=96&d=mm&r=g","caption":"amrit_bls"},"url":"https:\/\/www.constructionspecifier.com\/author\/amrit_bls\/"}]}},"views":7543,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/215356","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/35591"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=215356"}],"version-history":[{"count":2,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/215356\/revisions"}],"predecessor-version":[{"id":215360,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/215356\/revisions\/215360"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/215357"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=215356"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=215356"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=215356"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}