{"id":22887,"date":"2016-12-27T11:25:39","date_gmt":"2016-12-27T16:25:39","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=22887"},"modified":"2017-06-08T09:20:21","modified_gmt":"2017-06-08T13:20:21","slug":"more-hygienic-ceilings","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/","title":{"rendered":"Hygienic Ceilings: Standards and guidelines"},"content":{"rendered":"<figure id=\"attachment_23970\" aria-describedby=\"caption-attachment-23970\" style=\"width: 300px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-23970 size-medium\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/decorative-300x206.jpg\" alt=\"A decorative hygienic ceiling was used throughout this cupcake bakery to visually unify the food preparation and dining areas. Photo courtesy Ceilume\" width=\"300\" height=\"206\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/decorative-300x206.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/decorative-150x103.jpg 150w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/decorative.jpg 567w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-23970\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">A decorative hygienic ceiling was used throughout this cupcake bakery to visually unify the food preparation and dining areas. <\/span><br \/><em>Photo courtesy Ceilume<\/em><\/figcaption><\/figure>\n<p><strong>by Ed Davis, David Condello, Michael Chusid, RA, FCSI, CCS<br \/>\n<\/strong>The January 2017 issue of <em>The Construction Specifier<\/em> included the authors&#8217; in-depth look at the world of hygienic ceilings, <a href=\"http:\/\/www.constructionspecifier.com\/hygienic-ceilings-keeping-it-clean-overhead\/\" target=\"_blank\">\u201cHygienic Ceilings: Keeping it Clean Overhead.\u201d<\/a> In this complementing web feature, the authors examine various regulations and guidelines for constructing and maintaining ceilings in facilities with hygienic requirements.<\/p>\n<p><strong>What&#8217;s in a word?<br \/>\n<\/strong>The n-gram graph below\u00a0traces the frequency of the word \u2018hygiene\u2019 in English-language books, offering insight into changing behavior. The word did not start trending until the second half of the 19<sup>th<\/sup> century, during the epoch when Pasteur and others developed the germ theory of disease. With the realization cleanliness reduces disease, the richly decorated surfaces of the Victorian Age began evolving into the less fussy styles of the Edwardian Age, and then the austerity of the Modernist architects.<\/p>\n<p>The decline in the term\u2019s use becomes pronounced shortly after 1928, when Fleming discovered penicillin. It is interesting to note the decline of references to hygiene occurs simultaneously with the growing interest in \u2018acoustical ceilings.\u2019 Prior to the advent of acoustical ceilings, most ceilings were relatively easily cleaned hard surfaces such as plaster, tin, or painted wood. Perhaps the miracles of modern medicine made it possible for people to overlook hygiene and use difficult-to-clean ceilings that potentially release fibers and support mold.<\/p>\n<figure id=\"attachment_23809\" aria-describedby=\"caption-attachment-23809\" style=\"width: 336px\" class=\"wp-caption alignnone\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/ngram.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-23809 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/ngram.jpg\" alt=\"An n-gram of hygiene.\" width=\"336\" height=\"161\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/ngram.jpg 1875w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/ngram-300x144.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/ngram-768x368.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/ngram-1000x479.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/ngram-150x72.jpg 150w\" sizes=\"auto, (max-width: 336px) 100vw, 336px\" \/><\/a><figcaption id=\"caption-attachment-23809\" class=\"wp-caption-text\"><strong><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">An n-gram of hygiene.<\/span><\/strong><\/figcaption><\/figure>\n<p><strong> Hospitals<\/strong><\/p>\n<p>The <a href=\"https:\/\/www.fgiguidelines.org\/guidelines\/2014-hospital-outpatient\/\" target=\"_blank\">Facility Guidelines Institute\u2019s (FGI\u2019s) 2014 <em>Guidelines for Design and Construction of Hospitals and Outpatient Facilities<\/em><\/a> covers the topic under 2.1-7.2.3.3\u2212Ceilings. In the locations listed below, ceilings must be cleanable with routine housekeeping equipment and not create ledges or crevices:<\/p>\n<ul>\n<li>areas occupied by patients;<\/li>\n<li>clean workrooms;<\/li>\n<li>clean supply rooms;<\/li>\n<li>soiled workrooms;<\/li>\n<li>soiled holding rooms;<\/li>\n<li>nourishment areas and rooms;<\/li>\n<li>food and nutrition services facilities;<\/li>\n<li>pharmacy areas;<\/li>\n<li>central services areas; and<\/li>\n<li>laboratories.<\/li>\n<\/ul>\n<p>For endoscopy procedure (and instrument processing) rooms and decontamination rooms, ceilings must be crevice-free and be able to withstand cleaning with chemicals. Lay-in ceiling need to be gasketed or clipped down, as well as cleanable. Perforated, tegular, serrated, cut, or highly textured panels are not permitted in these areas.<\/p>\n<figure id=\"attachment_23808\" aria-describedby=\"caption-attachment-23808\" style=\"width: 225px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-23808 size-medium\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit-225x300.jpg\" alt=\"Translucent drop-out panels are installed between racks of computer servers as part of cold-aisle containment systems. Filtered and refrigerated air is blown through the plenum to cool the electronic devices. Locating fire sprinklers and light fixtures outside the conditioned zone prevented air loss through ceiling penetrations and heat gain from lamps. It also preserves headroom, simplifies housekeeping, and allows technicians working inside aisles and on top of racks to have visual contact. Photo courtesy Instor Solutions Inc.\" width=\"225\" height=\"300\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit-225x300.jpg 225w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit-768x1024.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit-750x1000.jpg 750w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit-113x150.jpg 113w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit.jpg 1224w\" sizes=\"auto, (max-width: 225px) 100vw, 225px\" \/><figcaption id=\"caption-attachment-23808\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Translucent drop-out panels between racks of computer servers as part of cold-aisle containment systems. Filtered and refrigerated air is blown through the plenum to cool the electronic devices. Locating fire sprinklers and light fixtures outside the conditioned zone prevented air loss through ceiling penetrations and heat gain from lamps. It preserves headroom, simplifies housekeeping, and allows visual contact for technicians working inside aisles and atop racks.<\/span><br \/> <em>Photo courtesy Instor Solutions Inc.<\/em><\/figcaption><\/figure>\n<p>For semi-restricted areas such as clean corridors, central sterile supply spaces, specialized radiographic rooms, and Class A operating rooms, the ceiling must be smooth, scrubbable, non-absorptive, non-perforated, capable of withstanding cleaning with chemicals, and without crevices. A lay-in ceiling must be gasketed, or each ceiling tile shall weigh at least 4.9 kg\/m<sup>2<\/sup> (1 lb\/sf). Perforated, tegular, serrated, cut, or highly textured panels are not permitted.<\/p>\n<p>Monolithic ceilings are required for restricted areas, such as operating rooms. Airborne-infection isolation rooms must be sealed to prevent air infiltration.<\/p>\n<p>For food\/nutrition service and laundry areas, lay-in ceilings require a non-corrosive grid, and panels need to be smooth, scrubbable, non-absorptive, non-perforated, capable of withstanding cleaning with chemicals, and weigh at least 4.9 kg\/m<sup>2<\/sup>.<\/p>\n<p>Additional FGI requirements include:<\/p>\n<ul>\n<li>2.1-8.4.2.6\u2212where drainage piping is installed above ceilings of nurseries, food-handling areas, central services, and electronic data processing areas, the piping must have special provisions (<em>e.g.<\/em> drip pans) to protect spaces below from leakage and condensation (this provision can be addressed by pan-shaped thermoformed ceiling panels);<\/li>\n<li>2.2-2.10\u2212neonatal intensive care units require ceilings to be non-friable; and<\/li>\n<li>2.5-7\u2212in patient areas, fire sprinklers must be designed to minimize patient tampering (a provision that can be addressed by drop-out ceilings).<\/li>\n<\/ul>\n<p><strong>Food preparation areas<br \/>\n<\/strong>The <a href=\"http:\/\/www.fda.gov\/downloads\/Food\/GuidanceRegulation\/RetailFoodProtection\/FoodCode\/UCM374510.pdf\" target=\"_blank\">U.S. Food and Drug Administration (FDA) <em>Food Code <\/em><\/a>states:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><strong>6-101.11:<\/strong> ceiling surfaces under conditions of normal use shall be\u2026 smooth, durable, and easily cleanable\u2026 [and] nonabsorbent for areas subject to moisture such as food preparation areas, walk-in refrigerators, warewashing areas, toilet rooms, mobile food establishment servicing areas, and areas subject to flushing or spray cleaning methods.<\/span><\/p>\n<p>The use of drop-out ceilings supports the requirement that:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><strong>6-201.12:<\/strong> Utility service lines and pipes may not be unnecessarily exposed.<\/span><\/p>\n<p>The use of luminous ceilings supports the requirement that:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><strong>6-202.11:<\/strong> \u2026light bulbs shall be shielded\u2026 in areas where there is exposed food.<\/span><\/p>\n<p><a href=\"https:\/\/www.fsis.usda.gov\/wps\/portal\/fsis\/topics\/regulatory-compliance\/compliance-guides-index\/sanitation-performance-standards\/sanitation-compliance-guide\" target=\"_blank\"><em>Sanitation Performance Standards Compliance Guide <\/em><\/a>by the U.S. Department of Agriculture (USDA) Food Safety Inspection Service (FSIS) states:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><strong>416.2(b):<\/strong> ceilings within establishments must be built of durable materials impervious to moisture and be cleaned and sanitized as necessary to prevent adulteration of product\u2026 outside openings must be constructed and maintained to prevent the entrance of vermin, such as flies, rats, and mice.<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><strong>6-201.11:<\/strong> ceilings shall be designed, constructed, and installed so they are smooth and easily cleanable\u2026<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><strong>6-201.12:<\/strong> Utility service lines and pipes may not be unnecessarily exposed. Exposed utility service lines and pipes shall be installed so they do not obstruct or prevent cleaning of\u2026 ceilings.<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><strong>6-201.16:<\/strong> ceiling covering materials shall be attached so that they are easily cleanable.<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><strong>6-202.15:<\/strong> outer openings of a food establishment shall be protected against the entry of insects and rodents by: Filling or closing holes and other gaps along floors, walls, and ceilings\u2026<\/span><\/p>\n<p>Comments in the standard raise concern about condensation on areas such as ceilings over open cooking kettles.<!--nextpage--><\/p>\n<p><strong>Occupational health and safety<br \/>\n<\/strong>While the National Institute for Occupational Safety and Health (NIOSH) addresses health and safety of construction personnel in its <a href=\"https:\/\/www.cdc.gov\/niosh\/topics\/indoorenv\/constructionieq.html\" target=\"_blank\"><em>Maintaining Indoor Environmental Quality (IEQ) during Construction and Renovation<\/em><\/a>, its hygienic practices also have a salubrious impact throughout the life of a building:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\">Construction and renovation projects\u2026 can adversely affect building occupants by the release of airborne particulates, biological contaminants, and gases. Careful planning for IEQ and the prevention of exposure during these activities is essential\u2026<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\">Particulate material such as dusts and fibers are likely to be produced during construction and renovation activities. Sources include drywall\u2026 Non-toxic dusts are irritants and can exacerbate lung conditions such as asthma and chronic obstructive lung disease\u2026<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\">Materials that contain fibers such as fiberglass composite materials or insulation can irritate the skin, eyes, and respiratory tract when disbursed in the air and\/or inhaled\u2026<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\">For all construction and renovation dusts, a plan to minimize exposure should be implemented. Appropriate containment should be in place to prevent disbursement into occupied areas\u2026<\/span><\/p>\n<figure id=\"attachment_23810\" aria-describedby=\"caption-attachment-23810\" style=\"width: 300px\" class=\"wp-caption alignleft\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-23810 size-medium\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/P1020739-300x225.jpg\" alt=\"Soot from jet fuel exhaust can darken ceilings in airport terminals. Hygienic panels would simplify cleaning. Photo courtesy Michael Chusid\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/P1020739-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/P1020739-768x576.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/P1020739-1000x750.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/P1020739-150x113.jpg 150w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/P1020739.jpg 2048w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-23810\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Soot from jet fuel exhaust can darken ceilings in airport terminals. Hygienic panels would simplify cleaning. <\/span><br \/><em>Photo courtesy Michael Chusid<\/em><\/figcaption><\/figure>\n<p><strong>Laboratories<br \/>\n<\/strong>Section 4-4\u2212Interior Finishes of the U.S. National Institutes of Health (NIH) <a href=\"https:\/\/www.orf.od.nih.gov\/PoliciesAndGuidelines\/BiomedicalandAnimalResearchFacilitiesDesignPoliciesandGuidelines\/Documents\/2016DesignRequirementsManual\/2016_Design_Requirements_Manual_508.pdf\" target=\"_blank\"><em>Design Requirements Manual<\/em><\/a> states criteria for finish selection include housekeeping and maintenance costs, durability, and aseptic characteristics. Ceilings must be durable, smooth, and easily cleaned, provide ease of maintenance, and be as resistant as possible to the corrosive chemical activity of disinfectants and other chemicals used in the laboratory.<\/p>\n<p>In most areas, ceilings such as washable lay-in acoustical tiles (with smooth, plastic faces) with a square edge (not tegular) on a non-concealed spline must be provided. Exceptions include glassware washing, autoclave rooms, and other areas with high moisture levels, which require special consideration.<\/p>\n<p>Another exception can be found with animal facilities, which require ceilings that are smooth, free of crevices and imperfect junctions with walls, and capable of withstanding scrubbing with detergents, disinfectants, and water under pressure on a frequent basis. Surface-mounted lights and exposed pipes are not permitted in these spaces. Suspended fiber-reinforced plastic (FRP) panels with a heavy-duty aluminum suspension system, gasketed with hold-down clips, are recommended for animal research facilities.<\/p>\n<p>Vivarium ceilings may be constructed of suspended high-density, moisture-resistant gypsum wallboard (GWB) with an epoxy coating. Containment laboratories require monolithic ceilings with chemical-resistant finishes.<\/p>\n<p>In all cases, maximum accessibility to mechanical and electrical distribution systems above ceilings shall be provided.<\/p>\n<p><strong>Pharmaceutical areas<br \/>\n<\/strong><a href=\"http:\/\/www.usp.org\/sites\/default\/files\/usp_pdf\/EN\/USPNF\/usp-gc-797-proposed-revisions-sep-2015.pdf\" target=\"_blank\">United States Pharmacopeial (USP) 797, <em>Pharmaceutical Compounding\u2212Sterile Preparations<\/em><\/a>, includes requirements applying to sterile areas and anterooms:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><strong>4.3:<\/strong> The surfaces of ceilings\u2026 in a classified area or in a segregated compounding area must be smooth, impervious, free from cracks and crevices, and non-shedding, thereby promoting cleanability and minimizing spaces in which microorganisms and other contaminants can accumulate. Surfaces must be resistant to damage by disinfectants. Junctures between the ceiling and the walls must be coved or sealed to eliminate cracks and crevices where dirt can accumulate. If ceilings consist of inlaid panels, the panels must be impregnated with a polymer to render them impervious and hydrophobic, and they must be sealed\u2026 Classified areas and segregated compounding areas must not contain dust-collecting overhangs, such as utility pipes\u2026 The exterior lens surface of ceiling light fixtures must be smooth, mounted flush, and sealed. Any other penetrations through the ceiling or walls must be sealed.<\/span><\/p>\n<p><strong>Schools<br \/>\n<\/strong><\/p>\n<p>When it comes to schools, the guidelines vary between states. For example, <a href=\"http:\/\/www.rules.utah.gov\/publicat\/code\/r392\/r392-200.htm\" target=\"_blank\">Utah\u2019s Administrative Code Rule R392-200, <em>Design, Construction, Operation, Sanitation, and Safety of Schools<\/em><\/a>, makes a general statement that \u201call school building floors, walls, and ceilings shall be constructed with materials that are durable and easily cleanable.\u201d In addition, toilet and shower rooms\u2019 ceilings \u201cmust be constructed of smooth, non-absorbent, easily cleanable materials,\u201d and waste storage room ceilings shall be \u201cconstructed with easily cleanable, nonabsorbent, washable materials.\u201d Food service areas must comply with health department regulations.<\/p>\n<p><strong>Good manufacturing practices<\/strong><\/p>\n<p>Agencies regulating the manufacturing of drugs, medical equipment, food, cosmetics, and other products that affect health have published good manufacturing practices (GMPs), <a href=\"http:\/\/www.who.int\/biologicals\/vaccines\/good_manufacturing_practice\/en\/\" target=\"_blank\">defined by the World Health Organization (WHO)<\/a> as systems for &#8220;ensuring that products are consistently produced and controlled according to quality standards. It is designed to minimize the risks involved in&#8230; production that cannot be eliminated through testing the final product.&#8221; WHO cites contamination as one of the main risks to health.<\/p>\n<figure id=\"attachment_23971\" aria-describedby=\"caption-attachment-23971\" style=\"width: 300px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-23971 size-medium\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/dropout-300x300.jpg\" alt=\"dropout\" width=\"300\" height=\"300\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/dropout-300x300.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/dropout-150x150.jpg 150w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/dropout.jpg 566w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><figcaption id=\"caption-attachment-23971\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">A back-illuminated, drop-out ceiling is used in this manufacturing area to satisfy noise reduction concerns without adding fibrous materials. Keeping lighting and sprinklers above the ceiling maximized headroom and protected them from damage.<\/span> <br \/> <em>Photo courtesy Ceilume<\/em><\/figcaption><\/figure>\n<p>FDA and FSIS, for example, require compliance with <a href=\"http:\/\/www.accessdata.fda.gov\/scripts\/cdrh\/cfdocs\/cfcfr\/cfrsearch.cfm?cfrpart=211\" target=\"_blank\">Current Good Manufacturing Practices (21 CFR \u00a7 110.20[b][4])<\/a> that require construction of manufacturing facilities so ceilings can be kept clean and in good repair. Condensation from fixtures, ducts, and pipes must also be prevented from dripping into clean areas, a requirement that can, in some buildings, be met by locating them above ceiling panels that act as evaporation pans.<\/p>\n<p><strong>Conclusion<br \/>\n<\/strong>Additional requirements may apply to these and other building types. Specifiers should review project requirements with authorities having jurisdiction (AHJs) and consultants with expertise in appropriate areas of hygiene.<\/p>\n<p><em>Ed Davis is president of Ceilume, a manufacturer of thermoformed ceiling products. He has been responsible for product testing and code compliance. Davis can be reached through <a href=\"http:\/\/www.ceilume.com\/pro\" target=\"_blank\">www.ceilume.com\/pro<\/a>.<\/em><\/p>\n<p><em>David Condello has more than 20 years of experience in construction, and is architectural services manager for Ceilume. He can be contacted via <a href=\"http:\/\/www.ceilume.com\/pro\" target=\"_blank\">www.ceilume.com\/pro<\/a>.<\/em><\/p>\n<p><em>Michael Chusid, RA, FCSI, CCS, is a frequent contributor to this magazine, and received the 2015 <\/em>The Construction Specifier<em> Article of the Year Award from CSI. He is an authority in building product innovation. Chusid can be reached through <a href=\"http:\/\/www.chusid.com\" target=\"_blank\">www.chusid.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Various regulations and guidelines for constructing and maintaining ceilings in facilities with hygienic requirements. A complement to one of the magazine&#8217;s feature articles, this short web piece looks at requirements and best practices for schools, laboratories, food preparation, healthcare, and other specialized spaces.<\/p>\n","protected":false},"author":6,"featured_media":23808,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,12,179,181,227,182,233,189,283,193,314],"tags":[53,828,3019,3179,45],"class_list":["post-22887","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-web-exclusive","category-masterformat","category-01-00-00-general-requirements","category-01-70-00-execution-and-closeout-requirements","category-02-00-00-existing-conditions","category-02-50-00-site-remediation","category-09-00-00-finishes","category-09-50-00-ceilings","category-13-00-00-special-construction","category-13-20-00-special-purpose-rooms","tag-acoustics","tag-ceilings","tag-cleaning","tag-hygienic-ceilings","tag-lighting","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hygienic Ceilings: Standards and guidelines - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hygienic Ceilings: Standards and guidelines - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Various regulations and guidelines for constructing and maintaining ceilings in facilities with hygienic requirements. A complement to one of the magazine&#039;s feature articles, this short web piece looks at requirements and best practices for schools, laboratories, food preparation, healthcare, and other specialized spaces.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2016-12-27T16:25:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-06-08T13:20:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1224\" \/>\n\t<meta property=\"og:image:height\" content=\"1632\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Erik Missio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erik Missio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"10 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/\"},\"author\":{\"name\":\"Erik Missio\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\"},\"headline\":\"Hygienic Ceilings: Standards and guidelines\",\"datePublished\":\"2016-12-27T16:25:39+00:00\",\"dateModified\":\"2017-06-08T13:20:21+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/\"},\"wordCount\":1910,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/INSTOR-Edit.jpg\",\"keywords\":[\"Acoustics\",\"Ceilings\",\"Cleaning\",\"hygienic ceilings\",\"lighting\"],\"articleSection\":[\"Features\",\"Web Exclusive\",\"MasterFormat\",\"01 00 00 General Requirements\",\"01 70 00 Execution and Closeout Requirements\",\"02 00 00 Existing Conditions\",\"02 50 00 Site Remediation\",\"09 00 00 Finishes\",\"09 50 00 Ceilings\",\"13 00 00 Special Construction\",\"13 20 00 Special Purpose Rooms\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/\",\"name\":\"Hygienic Ceilings: Standards and guidelines - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/INSTOR-Edit.jpg\",\"datePublished\":\"2016-12-27T16:25:39+00:00\",\"dateModified\":\"2017-06-08T13:20:21+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/more-hygienic-ceilings\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/INSTOR-Edit.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/INSTOR-Edit.jpg\",\"width\":1224,\"height\":1632,\"caption\":\"Translucent drop-out panels are installed between racks of computer servers as part of cold-aisle containment systems. Filtered and refrigerated air is blown through the plenum to cool the electronic devices. Locating fire sprinklers and light fixtures outside the conditioned zone prevented air loss through ceiling penetrations and heat gain from lamps. It also preserves headroom, simplifies housekeeping, and allows technicians working inside aisles and on top of racks to have visual contact. Photo courtesy Instor Solutions Inc.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\",\"name\":\"Erik Missio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"caption\":\"Erik Missio\"},\"sameAs\":[\"http:\\\/\\\/www.constructionspecifier.com\"],\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/erik-missio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hygienic Ceilings: Standards and guidelines - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/","next":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/2\/","og_locale":"en_US","og_type":"article","og_title":"Hygienic Ceilings: Standards and guidelines - The Construction Specifier","og_description":"Various regulations and guidelines for constructing and maintaining ceilings in facilities with hygienic requirements. A complement to one of the magazine's feature articles, this short web piece looks at requirements and best practices for schools, laboratories, food preparation, healthcare, and other specialized spaces.","og_url":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/","og_site_name":"The Construction Specifier","article_published_time":"2016-12-27T16:25:39+00:00","article_modified_time":"2017-06-08T13:20:21+00:00","og_image":[{"width":1224,"height":1632,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit.jpg","type":"image\/jpeg"}],"author":"Erik Missio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Erik Missio","Est. reading time":"10 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/"},"author":{"name":"Erik Missio","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b"},"headline":"Hygienic Ceilings: Standards and guidelines","datePublished":"2016-12-27T16:25:39+00:00","dateModified":"2017-06-08T13:20:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/"},"wordCount":1910,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit.jpg","keywords":["Acoustics","Ceilings","Cleaning","hygienic ceilings","lighting"],"articleSection":["Features","Web Exclusive","MasterFormat","01 00 00 General Requirements","01 70 00 Execution and Closeout Requirements","02 00 00 Existing Conditions","02 50 00 Site Remediation","09 00 00 Finishes","09 50 00 Ceilings","13 00 00 Special Construction","13 20 00 Special Purpose Rooms"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/","url":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/","name":"Hygienic Ceilings: Standards and guidelines - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit.jpg","datePublished":"2016-12-27T16:25:39+00:00","dateModified":"2017-06-08T13:20:21+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/more-hygienic-ceilings\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/INSTOR-Edit.jpg","width":1224,"height":1632,"caption":"Translucent drop-out panels are installed between racks of computer servers as part of cold-aisle containment systems. Filtered and refrigerated air is blown through the plenum to cool the electronic devices. Locating fire sprinklers and light fixtures outside the conditioned zone prevented air loss through ceiling penetrations and heat gain from lamps. It also preserves headroom, simplifies housekeeping, and allows technicians working inside aisles and on top of racks to have visual contact. Photo courtesy Instor Solutions Inc."},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b","name":"Erik Missio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","caption":"Erik Missio"},"sameAs":["http:\/\/www.constructionspecifier.com"],"url":"https:\/\/www.constructionspecifier.com\/author\/erik-missio\/"}]}},"views":24517,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/22887","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=22887"}],"version-history":[{"count":15,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/22887\/revisions"}],"predecessor-version":[{"id":23974,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/22887\/revisions\/23974"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/23808"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=22887"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=22887"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=22887"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}