{"id":23896,"date":"2016-12-29T10:06:44","date_gmt":"2016-12-29T15:06:44","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=23896"},"modified":"2017-01-10T10:04:55","modified_gmt":"2017-01-10T15:04:55","slug":"montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/","title":{"rendered":"Montana elevator shaft uses CLT to save time, reduce carbon emissions"},"content":{"rendered":"<figure id=\"attachment_23897\" aria-describedby=\"caption-attachment-23897\" style=\"width: 316px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-23897 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042-200x300.jpg\" alt=\"The elevator shaft for a new multi-use building in Whitefish, Montana, was constructed from cross-laminated timber (CLT), which reduced project construction time by approximately three weeks. Photo courtesy SmartLam\" width=\"316\" height=\"475\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042-200x300.jpg 200w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042-768x1151.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042-100x150.jpg 100w\" sizes=\"auto, (max-width: 316px) 100vw, 316px\" \/><figcaption id=\"caption-attachment-23897\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The elevator shaft for a new multi-use building in Whitefish, Montana, was constructed from cross-laminated timber (CLT), which reduced project construction time by approximately three weeks.<\/span> <br \/> <em>Photo courtesy SmartLam<\/em><\/figcaption><\/figure>\n<p>A multi-use, multi-level building currently under construction in Whitefish, Montana, will feature an elevator shaft manufactured from cross-laminated timber (CLT) rather than the traditional choice of concrete masonry units (CMUs). This elevator shaft\u2014the first in the country to be made from CLT\u2014will be 14 m (45 ft) tall on completion.<\/p>\n<p>CLT\u2014a focus in the forthcoming February 2017 issue of <em>The Construction Specifier<\/em>\u2014comprises several layers of lumber boards, stacked crosswise and bonded. This increases the panels\u2019 mass, as well as their stability and rigidity. By implementing this strategy, the project team achieved a number of advantages related to time and cost savings. For instance, with CMU, inspection is required every 2.5 m (8 ft), while with CLT, this is done in the framing inspection.<\/p>\n<p>The CLT method can also cost only 70 to 75 percent of the traditional option, as it cuts down on materials and labor. Where the traditional CMU method would take three weeks, the work of eight to 12 people, and equipment for stacking and curing to complete, using CLT allows for onsite assembly by three people with a crane, and can be done in a matter of hours. In part, this is due to its prefabrication process, which renders it immune to concerns of weather and frost.<\/p>\n<p>This method will also improve the structure\u2019s environmental performance, reducing its greenhouse gas (GHG) emissions through the use of an alternative to concrete, which is responsible for five percent of world carbon dioxide (CO<sub>2<\/sub>) emissions. Wood is the only renewable building material, and the only structural building material whose origins can be certified as sustainable by third-party programs.<\/p>\n<p>The process of cross-lamination enhances CLT\u2019s ability to perform well structurally. It improves the wood\u2019s dimensional stability and shearing strength to create an effective lateral load-resisting system with high seismic resistances. A seven-story CLT building tested on the world\u2019s largest shake table in Japan, for example, survived 14 consecutive seismic events and suffered almost no damage.<\/p>\n<p>The thickness provided by the cross-section in CLT also enhances the system\u2019s fire resistance. CLT\u2019s increased mass causes its panels to char slowly, until the oxygen source is removed and combustion must stop, and provides fewer concealed spaces for fire to spread undetected. This method also demonstrates good ductile behavior and energy dissipation.<\/p>\n<p>The Whitefish elevator shaft took 3.3 hours to erect, and will be completed in the spring.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>A multi-use, multi-level building currently under construction in Whitefish, Montana, will feature an elevator shaft manufactured from cross-laminated timber (CLT) rather than the traditional choice of concrete masonry units (CMUs).<\/p>\n","protected":false},"author":1836,"featured_media":23897,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,449,186,194,319,500,462,464],"tags":[1153,752,2064,3200,3199],"class_list":["post-23896","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-uniformat","category-06-00-00-wood-plastics-and-composites","category-14-00-00-conveying-equipment","category-14-20-00-elevators","category-c1010interior-partitions","category-c10interior-construction","category-d10conveying","tag-clt","tag-concrete","tag-cross-laminated-timber","tag-elevator","tag-montana","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Montana elevator shaft uses CLT to save time, reduce carbon emissions - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Montana elevator shaft uses CLT to save time, reduce carbon emissions - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"A multi-use, multi-level building currently under construction in Whitefish, Montana, will feature an elevator shaft manufactured from cross-laminated timber (CLT) rather than the traditional choice of concrete masonry units (CMUs).\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2016-12-29T15:06:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-10T15:04:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1068\" \/>\n\t<meta property=\"og:image:height\" content=\"1600\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Carly Midgley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carly Midgley\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/\"},\"author\":{\"name\":\"Carly Midgley\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b70033b703868965f86aed130f7abb00\"},\"headline\":\"Montana elevator shaft uses CLT to save time, reduce carbon emissions\",\"datePublished\":\"2016-12-29T15:06:44+00:00\",\"dateModified\":\"2017-01-10T15:04:55+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/\"},\"wordCount\":440,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/image042.jpg\",\"keywords\":[\"CLT\",\"Concrete\",\"Cross-laminated timber\",\"Elevator\",\"Montana\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"UniFormat\",\"06 00 00 Wood, Plastics, and Composites\",\"14 00 00 Conveying Equipment\",\"14 20 00 Elevators\",\"C1010\u2212Interior Partitions\",\"C10\u2212Interior Construction\",\"D10\u2212Conveying\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/\",\"name\":\"Montana elevator shaft uses CLT to save time, reduce carbon emissions - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/image042.jpg\",\"datePublished\":\"2016-12-29T15:06:44+00:00\",\"dateModified\":\"2017-01-10T15:04:55+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/image042.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2016\\\/12\\\/image042.jpg\",\"width\":1068,\"height\":1600,\"caption\":\"The elevator shaft for a new multi-use building in Whitefish, Montana, was constructed from cross-laminated timber (CLT), which reduced project construction time by approximately three weeks. Photo courtesy SmartLam\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Montana elevator shaft uses CLT to save time, reduce carbon emissions\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b70033b703868965f86aed130f7abb00\",\"name\":\"Carly Midgley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g\",\"caption\":\"Carly Midgley\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/carly_midgley\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Montana elevator shaft uses CLT to save time, reduce carbon emissions - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/","og_locale":"en_US","og_type":"article","og_title":"Montana elevator shaft uses CLT to save time, reduce carbon emissions - The Construction Specifier","og_description":"A multi-use, multi-level building currently under construction in Whitefish, Montana, will feature an elevator shaft manufactured from cross-laminated timber (CLT) rather than the traditional choice of concrete masonry units (CMUs).","og_url":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/","og_site_name":"The Construction Specifier","article_published_time":"2016-12-29T15:06:44+00:00","article_modified_time":"2017-01-10T15:04:55+00:00","og_image":[{"width":1068,"height":1600,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042.jpg","type":"image\/jpeg"}],"author":"Carly Midgley","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Carly Midgley","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/"},"author":{"name":"Carly Midgley","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b70033b703868965f86aed130f7abb00"},"headline":"Montana elevator shaft uses CLT to save time, reduce carbon emissions","datePublished":"2016-12-29T15:06:44+00:00","dateModified":"2017-01-10T15:04:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/"},"wordCount":440,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042.jpg","keywords":["CLT","Concrete","Cross-laminated timber","Elevator","Montana"],"articleSection":["Form+Function","MasterFormat","UniFormat","06 00 00 Wood, Plastics, and Composites","14 00 00 Conveying Equipment","14 20 00 Elevators","C1010\u2212Interior Partitions","C10\u2212Interior Construction","D10\u2212Conveying"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/","url":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/","name":"Montana elevator shaft uses CLT to save time, reduce carbon emissions - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042.jpg","datePublished":"2016-12-29T15:06:44+00:00","dateModified":"2017-01-10T15:04:55+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2016\/12\/image042.jpg","width":1068,"height":1600,"caption":"The elevator shaft for a new multi-use building in Whitefish, Montana, was constructed from cross-laminated timber (CLT), which reduced project construction time by approximately three weeks. Photo courtesy SmartLam"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/montana-elevator-shaft-uses-clt-to-save-time-reduce-carbon-emissions\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Montana elevator shaft uses CLT to save time, reduce carbon emissions"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b70033b703868965f86aed130f7abb00","name":"Carly Midgley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g","caption":"Carly Midgley"},"url":"https:\/\/www.constructionspecifier.com\/author\/carly_midgley\/"}]}},"views":7360,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/23896","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/1836"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=23896"}],"version-history":[{"count":2,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/23896\/revisions"}],"predecessor-version":[{"id":23899,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/23896\/revisions\/23899"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/23897"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=23896"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=23896"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=23896"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}