{"id":28039,"date":"2017-03-15T00:01:52","date_gmt":"2017-03-15T04:01:52","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=28039"},"modified":"2017-02-17T11:08:27","modified_gmt":"2017-02-17T16:08:27","slug":"precast-high-performance-high-expectations","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/","title":{"rendered":"Precast: High performance, high expectations"},"content":{"rendered":"<figure id=\"attachment_28028\" aria-describedby=\"caption-attachment-28028\" style=\"width: 381px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C.jpg\" rel=\"attachment wp-att-28028\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-28028\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C-1000x563.jpg\" width=\"381\" height=\"215\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C-1000x563.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C-300x169.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C-768x433.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C-150x85.jpg 150w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C.jpg 2048w\" sizes=\"auto, (max-width: 381px) 100vw, 381px\" \/><\/a><figcaption id=\"caption-attachment-28028\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">In designing the Independent System Operator headquarters (Folsom, California), structural engineers capitalized on a precast hybrid, moment-frame structural system for the office wing. According to Brian Reil (Buehler &amp; Buehler Structural Engineers), this helped meet seismic and sustainability goals.<\/span><br \/> <em>Photo \u00a9 2011 Rien Van Rijthoven. Photo courtesy Dreyfuss &amp; Blackford Architects<\/em><\/figcaption><\/figure>\n<p>The concept of \u2018high-performance\u2019 encompasses sustainability and its related concepts and practices. However, it goes beyond a \u2018this-or-that\u2019 approach by requiring optimization of all relevant attributes for a project. Hence, characteristics such as energy and water conservation, safety, security, and durability are no longer just options, but requirements that must be integrated into the overall design, construction, and performance of a structure. At the same time, \u2018high-performance\u2019 also focuses on a structure\u2019s long-term performance, which is a marked change from the first-cost-driven approaches often seen.<\/p>\n<p>One vital attribute of long-term performance is \u2018resiliency.\u2019 A natural extension of sustainability, it focuses on the structure\u2019s ability to resist natural and man-made disasters such as earthquakes, fires, hurricanes, tornados, floods, and terrorist attacks. It also encompasses how quickly the structure can be back in service after such events occur, and the resources required. Essentially, high-performance structures must be resilient against various forces, and protect occupants and property within.<\/p>\n<p>Once the mindset is shifted to this bigger picture, traditional materials and approaches may need to be rethought. To build high-performance structures, one needs high-performance materials that are versatile, efficient, resilient, and able to meet multiple requirements and challenges. One example is precast concrete, which offers the strength, durability, and fire resistance of concrete, but with additional benefits such as offsite manufacturing, which offers speed of construction, minimal site impact, and a high degree of quality and versatility.<\/p>\n<p>This topic is covered in greater depth in <em>The Construction Specifier\u2019s<\/em> newest sponsored e-book, \u201cConcrete Ideas: Possibilities with Precast.\u201d To download it, visit <a href=\"http:\/\/www.constructionspecifier.com\/ebook\/fabcon-concrete-ideas-e-book\" target=\"_blank\">www.constructionspecifier.com\/ebook\/fabcon-concrete-ideas-e-book<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The free, downloadable e-book, &#8220;Concrete Ideas: Possibilities with Precast,&#8221; looks how the material offers strength, durability, and fire resistance, along with benefits of offsite manufacturing, which means speed of construction, minimal site impact, and a high degree of quality and versatility.<\/p>\n","protected":false},"author":6,"featured_media":28028,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[179,183,240,1029],"tags":[],"class_list":["post-28039","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-masterformat","category-03-00-00-concrete","category-03-40-00-precast-concrete","category-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Precast: High performance, high expectations - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Precast: High performance, high expectations - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"The free, downloadable e-book, &quot;Concrete Ideas: Possibilities with Precast,&quot; looks how the material offers strength, durability, and fire resistance, along with benefits of offsite manufacturing, which means speed of construction, minimal site impact, and a high degree of quality and versatility.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2017-03-15T04:01:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1154\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Erik Missio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erik Missio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/\"},\"author\":{\"name\":\"Erik Missio\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\"},\"headline\":\"Precast: High performance, high expectations\",\"datePublished\":\"2017-03-15T04:01:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/\"},\"wordCount\":325,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/02\\\/C.jpg\",\"articleSection\":[\"MasterFormat\",\"03 00 00 Concrete\",\"03 40 00 Precast Concrete\",\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/\",\"name\":\"Precast: High performance, high expectations - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/02\\\/C.jpg\",\"datePublished\":\"2017-03-15T04:01:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/02\\\/C.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/02\\\/C.jpg\",\"width\":2048,\"height\":1154,\"caption\":\"In designing the Independent System Operator headquarters (Folsom, California), structural engineers capitalized on a precast hybrid, moment-frame structural system for the office wing. According to Brian Reil (Buehler & Buehler Structural Engineers), precast hybrid moment-resisting frames were employed to meet the site\u2019s seismic demands, as well as the project\u2019s sustainability goals. Photo \u00a9 2011 Rien Van Rijthoven. Photo courtesy Dreyfuss & Blackford Architects\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/precast-high-performance-high-expectations\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Precast: High performance, high expectations\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\",\"name\":\"Erik Missio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"caption\":\"Erik Missio\"},\"sameAs\":[\"http:\\\/\\\/www.constructionspecifier.com\"],\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/erik-missio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Precast: High performance, high expectations - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/","og_locale":"en_US","og_type":"article","og_title":"Precast: High performance, high expectations - The Construction Specifier","og_description":"The free, downloadable e-book, \"Concrete Ideas: Possibilities with Precast,\" looks how the material offers strength, durability, and fire resistance, along with benefits of offsite manufacturing, which means speed of construction, minimal site impact, and a high degree of quality and versatility.","og_url":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/","og_site_name":"The Construction Specifier","article_published_time":"2017-03-15T04:01:52+00:00","og_image":[{"width":2048,"height":1154,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C.jpg","type":"image\/jpeg"}],"author":"Erik Missio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Erik Missio","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/"},"author":{"name":"Erik Missio","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b"},"headline":"Precast: High performance, high expectations","datePublished":"2017-03-15T04:01:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/"},"wordCount":325,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C.jpg","articleSection":["MasterFormat","03 00 00 Concrete","03 40 00 Precast Concrete","News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/","url":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/","name":"Precast: High performance, high expectations - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C.jpg","datePublished":"2017-03-15T04:01:52+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/02\/C.jpg","width":2048,"height":1154,"caption":"In designing the Independent System Operator headquarters (Folsom, California), structural engineers capitalized on a precast hybrid, moment-frame structural system for the office wing. According to Brian Reil (Buehler & Buehler Structural Engineers), precast hybrid moment-resisting frames were employed to meet the site\u2019s seismic demands, as well as the project\u2019s sustainability goals. Photo \u00a9 2011 Rien Van Rijthoven. Photo courtesy Dreyfuss & Blackford Architects"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/precast-high-performance-high-expectations\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Precast: High performance, high expectations"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b","name":"Erik Missio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","caption":"Erik Missio"},"sameAs":["http:\/\/www.constructionspecifier.com"],"url":"https:\/\/www.constructionspecifier.com\/author\/erik-missio\/"}]}},"views":3727,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/28039","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=28039"}],"version-history":[{"count":2,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/28039\/revisions"}],"predecessor-version":[{"id":28041,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/28039\/revisions\/28041"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/28028"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=28039"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=28039"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=28039"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}