{"id":29788,"date":"2017-03-10T09:30:48","date_gmt":"2017-03-10T14:30:48","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=29788"},"modified":"2017-03-13T15:34:43","modified_gmt":"2017-03-13T19:34:43","slug":"massachusetts-chapel-pulls-off-challenging-zinc-installation","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/","title":{"rendered":"Massachusetts chapel pulls off challenging zinc installation"},"content":{"rendered":"<p><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens_of_gethsemane_1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-29789 size-large\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens_of_gethsemane_1-1000x750.jpg\" width=\"660\" height=\"495\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens_of_gethsemane_1-1000x750.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens_of_gethsemane_1-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens_of_gethsemane_1-768x576.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens_of_gethsemane_1-150x113.jpg 150w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens_of_gethsemane_1.jpg 2048w\" sizes=\"auto, (max-width: 660px) 100vw, 660px\" \/><\/a><\/p>\n<p>The Byzantine-style Holy Resurrection Chapel in West Roxbury, Massachusetts, was completed this past September, incorporating zinc to achieve aesthetic and design goals. Designed by architect Yervant Nahikian, the Boston-area chapel is located within the Gardens at Gethsemane\u2014a cemetery serving various communities such as Asian, Islamic, Orthodox, military, and non-denominational groups.<\/p>\n<p>One of the chapel\u2019s most notable design elements is its multi-faceted dome, which used single-lock standing-seam panels and posed such a complex challenge, several contractors turned down the opportunity.<\/p>\n<p>\u201cWe built a prototype of one half of the dome in our shop to make sure the 24 dome panels would position properly,\u201d says Bob Gorman, president of Gorman Construction, which fabricated the dome and the chapel\u2019s triangular panels.<\/p>\n<p>Gorman Construction also provided custom flashings and detailing, as was necessary to create a continuous curve over the drip-edge.<\/p>\n<p>\u201cThe biggest challenge was fabricating the double-curve \u2018hourglass\u2019 panels in one continuous piece,\u201d says Gorman. He adds, \u201cIt was an interesting project with different treatments\u2014that\u2019s what attracted us to it.\u201d<\/p>\n<p>The dome was not the only challenge the team had to face\u2014the design also had to be sensitive to the tradition of facing east to pray, common in Orthodox and other faiths.<\/p>\n<p>\u201cIn addition to the complexity of the roof, the design required that the intersection of two panels would break precisely above each window, which were aligned with the four points of the compass,\u201d says Gorman. \u201cThe cross on top of the chapel aligns with the panels to run north and south so that the face of the cross greets the rising sun from the east.\u201d<\/p>\n<p>Zinc\u2014specifically, a proprietary 0.8-mm (0.03-in.) blue-gray zinc\u2014was also used for the chapel\u2019s four aforementioned triangular elements, and for its four half-round barrel vaults, which were clad in double-lock panels.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The Byzantine-style Holy Resurrection Chapel in West Roxbury, Massachusetts, was completed this past September, incorporating zinc to achieve aesthetic and design goals.<\/p>\n","protected":false},"author":1836,"featured_media":29884,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,449,187,267,269,496,461],"tags":[3386,3064,3342,3385,567,2102],"class_list":["post-29788","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-uniformat","category-07-00-00-thermal-and-moisture-protection","category-07-40-00-roofing-and-siding-panels","category-07-60-00-flashing-and-sheet-metal","category-b3020roof-appurtenances","category-b30exterior-horizontal-enclosures","tag-chapel","tag-massachusetts","tag-metals","tag-religious","tag-roof","tag-zinc","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Massachusetts chapel pulls off challenging zinc installation - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Massachusetts chapel pulls off challenging zinc installation - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"The Byzantine-style Holy Resurrection Chapel in West Roxbury, Massachusetts, was completed this past September, incorporating zinc to achieve aesthetic and design goals.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2017-03-10T14:30:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-03-13T19:34:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"360\" \/>\n\t<meta property=\"og:image:height\" content=\"240\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Carly Midgley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carly Midgley\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/\"},\"author\":{\"name\":\"Carly Midgley\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b70033b703868965f86aed130f7abb00\"},\"headline\":\"Massachusetts chapel pulls off challenging zinc installation\",\"datePublished\":\"2017-03-10T14:30:48+00:00\",\"dateModified\":\"2017-03-13T19:34:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/\"},\"wordCount\":308,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/gardens.jpg\",\"keywords\":[\"chapel\",\"Massachusetts\",\"Metals\",\"religious\",\"roof\",\"Zinc\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"UniFormat\",\"07 00 00 Thermal and Moisture Protection\",\"07 40 00 Roofing and Siding Panels\",\"07 60 00 Flashing and Sheet Metal\",\"B3020\u2212Roof Appurtenances\",\"B30\u2212Exterior Horizontal Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/\",\"name\":\"Massachusetts chapel pulls off challenging zinc installation - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/gardens.jpg\",\"datePublished\":\"2017-03-10T14:30:48+00:00\",\"dateModified\":\"2017-03-13T19:34:43+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/gardens.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/gardens.jpg\",\"width\":360,\"height\":240},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/massachusetts-chapel-pulls-off-challenging-zinc-installation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Massachusetts chapel pulls off challenging zinc installation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b70033b703868965f86aed130f7abb00\",\"name\":\"Carly Midgley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g\",\"caption\":\"Carly Midgley\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/carly_midgley\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Massachusetts chapel pulls off challenging zinc installation - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/","og_locale":"en_US","og_type":"article","og_title":"Massachusetts chapel pulls off challenging zinc installation - The Construction Specifier","og_description":"The Byzantine-style Holy Resurrection Chapel in West Roxbury, Massachusetts, was completed this past September, incorporating zinc to achieve aesthetic and design goals.","og_url":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/","og_site_name":"The Construction Specifier","article_published_time":"2017-03-10T14:30:48+00:00","article_modified_time":"2017-03-13T19:34:43+00:00","og_image":[{"width":360,"height":240,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens.jpg","type":"image\/jpeg"}],"author":"Carly Midgley","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Carly Midgley","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/"},"author":{"name":"Carly Midgley","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b70033b703868965f86aed130f7abb00"},"headline":"Massachusetts chapel pulls off challenging zinc installation","datePublished":"2017-03-10T14:30:48+00:00","dateModified":"2017-03-13T19:34:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/"},"wordCount":308,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens.jpg","keywords":["chapel","Massachusetts","Metals","religious","roof","Zinc"],"articleSection":["Form+Function","MasterFormat","UniFormat","07 00 00 Thermal and Moisture Protection","07 40 00 Roofing and Siding Panels","07 60 00 Flashing and Sheet Metal","B3020\u2212Roof Appurtenances","B30\u2212Exterior Horizontal Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/","url":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/","name":"Massachusetts chapel pulls off challenging zinc installation - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens.jpg","datePublished":"2017-03-10T14:30:48+00:00","dateModified":"2017-03-13T19:34:43+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/gardens.jpg","width":360,"height":240},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/massachusetts-chapel-pulls-off-challenging-zinc-installation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Massachusetts chapel pulls off challenging zinc installation"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b70033b703868965f86aed130f7abb00","name":"Carly Midgley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g","caption":"Carly Midgley"},"url":"https:\/\/www.constructionspecifier.com\/author\/carly_midgley\/"}]}},"views":5500,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/29788","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/1836"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=29788"}],"version-history":[{"count":10,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/29788\/revisions"}],"predecessor-version":[{"id":30039,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/29788\/revisions\/30039"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/29884"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=29788"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=29788"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=29788"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}