{"id":3082,"date":"2013-10-02T08:44:43","date_gmt":"2013-10-02T12:44:43","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=3082"},"modified":"2017-01-20T10:00:42","modified_gmt":"2017-01-20T15:00:42","slug":"detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/","title":{"rendered":"Detailing masonry and frame walls with continuous insulation and air barriers"},"content":{"rendered":"<figure id=\"attachment_3086\" aria-describedby=\"caption-attachment-3086\" style=\"width: 318px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3086\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed-1000x589.jpg\" alt=\"Photo courtesy Sto Corp. \" width=\"318\" height=\"187\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed-1000x589.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed-300x176.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed-624x367.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed.jpg 2048w\" sizes=\"auto, (max-width: 318px) 100vw, 318px\" \/><\/a><figcaption id=\"caption-attachment-3086\" class=\"wp-caption-text\"><em>Photo courtesy Sto Corp.<\/em><\/figcaption><\/figure>\n<p><strong>by John Chamberlin, MBA<\/strong><br \/>\nAccording to the U.S. Department of Energy (DOE), buildings account for 39 percent of total energy use in the United States.<a href=\"#note1\"><sup>1<\/sup><\/a> Efforts to reduce this consumption is reflected in recent changes to building practices and codes.<\/p>\n<p>For example, the DOE has mandated all states update their commercial building codes to meet or exceed American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE) 90.1-2010, <em>Energy Standard for Buildings Except Low-rise Residential Buildings<\/em>, by October. Two key requirements of ASHRAE 90.1-2010 are continuous insulation (ci) and a continuous air barrier.<\/p>\n<p>ASHRAE 90.1 defines continuous insulation as \u201cinsulation that is continuous across all structural members without thermal bridges other than fasteners and service openings.\u201d Meanwhile, continuous air barriers are defined as \u201cthe combination of interconnected materials, assemblies and sealed joints and components of the building envelope that minimize air leakage into or out of the building envelope.\u201d<\/p>\n<p>With these requirements and definitions in place, compliance with ASHRAE 90.1-2010 should be easy. However, this may not be the case.<\/p>\n<p><figure id=\"attachment_3084\" aria-describedby=\"caption-attachment-3084\" style=\"width: 625px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_October2013_HR-25.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3084\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_October2013_HR-25-1000x534.jpg\" alt=\"This map shows the U.S. Climate Zones based on 2009 International Energy Conservation Code (IECC). [CREDIT] Data courtesy Building Energy Codes Resource Center, Pacific Northwest National Laboratory, U.S. Department of Energy \" width=\"625\" height=\"333\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_October2013_HR-25-1000x534.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_October2013_HR-25-300x160.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_October2013_HR-25-624x333.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_October2013_HR-25.jpg 1088w\" sizes=\"auto, (max-width: 625px) 100vw, 625px\" \/><\/a><figcaption id=\"caption-attachment-3084\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">This map shows the U.S. Climate Zones based on 2009 International Energy Conservation Code (IECC).<\/span><em>Data courtesy Building Energy Codes Resource Center, Pacific Northwest National Laboratory, U.S. Department of Energy<\/em><\/figcaption><\/figure><strong>Why choose continuous insulation and air barriers?<\/strong><br \/>\nThe biggest problem with many insulated buildings involves thermal bridging. These occur when poor thermal insulator materials meet, creating the path of least resistance for heat to pass through.<\/p>\n<p>An easy example of thermal bridging would be studs in a building\u2019s wall. Even though these studs typically have fiberglass batt insulation between them, the insulation does nothing to reduce the transfer of heat through the stud. Insulation materials include a nominal R-value, which is a measure of the material\u2019s ability to retard heat flow. In theory, a wall assembly constructed with an insulating material of a certain R-value would have a minimum of that material\u2019s R-value as an assembly. However, due to thermal bridging, the assembly\u2019s R-value may be much lower than the R-value of the insulating material itself. This has led to the concept of an assembly\u2019s \u2018effective\u2019 R-value versus its \u2018nominal\u2019 one.<\/p>\n<p><a name=\"note7\"><\/a>According to studies conducted by the Oak Ridge National Laboratory (ORNL), thermal bridging in metal frame construction reduces the insulating performance of a wall assembly by 40 to 60 percent.<a href=\"#note2\"><sup>2<\/sup><\/a> For example, a 152-mm (6-in.) metal stud wall assembly including R-19 fiberglass batt insulation may only have an effective R-value between R-8 and R-11. Heating systems for buildings are often designed based on the assembly\u2019s nominal R-value, so in many cases unplanned for energy may be expended to heat a structure\u2019s interior. This is where continuous insulation comes into play.<\/p>\n<p>ASHRAE now requires minimum continuous insulation R-values for buildings based on the climate zones in which those buildings reside. The <em>International Energy Conservation Code<\/em> (<em>IECC<\/em>) has identified eight unique climate zones throughout the United States (Figure 1). These zones are determined based on the region\u2019s average temperature, humidity level, and moisture level.<\/p>\n<p>Continuous insulation on an assembly\u2019s exterior, either by itself or in conjunction with interior insulation, is the most economical and efficient way of achieving highly effective R-values. Since ASHRAE 90.1 requires continuous insulation be exempt of thermal bridges, its nominal R-value should be much closer to the effective R-value of the assembly.<\/p>\n<figure id=\"attachment_3091\" aria-describedby=\"caption-attachment-3091\" style=\"width: 261px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/copy.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3091\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/copy.jpg\" alt=\"This shows a sample detail of a wall assembly featuring a fluid-applied air barrier with continuous insulation under masonry veneer on steel stud backup. Images courtesy Sto Corp. \" width=\"261\" height=\"356\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/copy.jpg 598w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/copy-219x300.jpg 219w\" sizes=\"auto, (max-width: 261px) 100vw, 261px\" \/><\/a><figcaption id=\"caption-attachment-3091\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">This shows a sample detail of a wall assembly featuring a fluid-applied air barrier with continuous insulation under masonry veneer on steel stud backup.<\/span> <em>Images courtesy Sto Corp<\/em>.<\/figcaption><\/figure>\n<p>Another major cause of energy consumption is air infiltration and exfiltration. Two of the major air pressures on buildings causing infiltration and exfiltration are wind pressure and stack pressure.<\/p>\n<p>Wind pressure on buildings may have a serious effect on energy and moisture-related air leakage. Since wind pressure is not uniform across a building face, the higher up on a building, the higher the pressure is likely to be, especially as the building rises above objects that might restrict the wind\u2019s flow. Wind pressure pressurizes a building positively on the side it is hitting, but as the wind goes around the corner of the building, it speeds up. This causes the pressure to decrease, and change from positive to negative. These changes in pressure can affect how water moves around the building, especially at corners where water may enter the wall if there is an opening at a joint in the cladding. This phenomenon is known as \u2018wind wash\u2019\u2014its effects can be avoided as long as the air barrier is intact at the corners.<\/p>\n<p>Stack pressure occurs when there is a difference in atmospheric pressure at the top and bottom of a building. This difference is the result of a variance in temperature at the top and bottom, causing varying weights of the columns of air inside the building compared to outside. In climates where the interior is heated, stack pressure may cause air infiltration at the bottom of a building and exfiltration at the top. In climates where the interior is cooled, exfiltration may occur at the bottom and infiltration at the top. Stack effect can be controlled by designing airtight vestibules, closing off openings (<em>i.e.<\/em> mechanical penetrations) between floors, and sealing vertical shafts within the building.<\/p>\n<p>Air barrier systems help control air infiltration and exfiltration in buildings. These systems accomplish this by sealing joints, penetrations, and openings to create an airtight assembly. This, combined with venting and compartmentalizing, allows pressure to equalize between the interior and exterior of a structure. Without these differentials, air infiltration and exfiltration is restricted.<\/p>\n<p>Air barrier systems should meet three key criteria:<\/p>\n<ol>\n<li>They should be continuous to not allow opportunities for air leakage.<\/li>\n<li>They should be structural, or in other words, permanently secured to the supporting structure. (Air barriers must be able to withstand wind pressure, stack pressure, and any pressure caused by mechanical effects, and ultimately transferred to the structure. If not a permanent part of the structure, air barriers may tear or displace under stress.)<\/li>\n<li>Air barriers must be durable. (They are typically installed behind a building\u2019s cladding and may require removal of the cladding for any type of maintenance or repair. For this purpose, a highly durable air barrier will always be preferred so maintenance can be avoided.)<\/li>\n<\/ol>\n<p><strong>Benefits of continuous insulation and air barriers<\/strong><br \/>\nA study conducted by Morrison Hershfield, \u201cEnergy Conservation Benefits of Air Barriers,\u201d focused on the inclusion of both continuous exterior insulation and a continuous fluid-applied air barrier. Using 3D modeling, a prototype medium three-story office building was proposed for Dallas, Seattle, and Toronto climates. Baseline case buildings were set up to meet the minimum requirements of ASHRAE 90.1-2007 for newly constructed buildings.<\/p>\n<figure id=\"attachment_3085\" aria-describedby=\"caption-attachment-3085\" style=\"width: 248px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Fluid-applied-barrier-application.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3085\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Fluid-applied-barrier-application-668x1000.jpg\" alt=\"The installation of fluid-applied air\/moisture barrier using spray equipment over sheathing.\" width=\"248\" height=\"372\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Fluid-applied-barrier-application-668x1000.jpg 668w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Fluid-applied-barrier-application-200x300.jpg 200w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Fluid-applied-barrier-application.jpg 1370w\" sizes=\"auto, (max-width: 248px) 100vw, 248px\" \/><\/a><figcaption id=\"caption-attachment-3085\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">The installation of fluid-applied air\/moisture barrier using spray equipment over sheathing.<\/span><\/figcaption><\/figure>\n<p>According to the report:<\/p>\n<p><a name=\"note8\"><\/a><span style=\"font-family: times new roman,times; font-size: 12pt;\">Heating, cooling, lighting, and interior equipment energy consumption were modeled for each load case at 10-minute intervals and the results are summarized on a monthly usage basis in units of kilowatt hours (kWh). This data was then used to calculate energy savings over the base case, and an annual carbon equivalent was calculated based on the annual heating and cooling costs<\/span>.<a href=\"#note3\"><sup>3<\/sup><\/a><\/p>\n<p>The modeling determined that in terms of energy efficiency, the inclusion of a continuous air barrier actually had a greater impact than the continuous insulation. Annual energy cost savings ranged from $5000 to $19,000, compared to the baseline building which included continuous insulation by itself. Also, there was a diminishing return in energy cost savings as the R-value of the continuous insulation was increased.<\/p>\n<p><strong>The challenges with continuous insulation<\/strong><br \/>\nThe difficulty that arises with continuous insulation is ironically similar to the phenomenon that makes it necessary in the first place. The definition of continuous insulation explains it must be \u201ccontinuous across all structural members without thermal bridges other than fasteners and service openings.\u201d<\/p>\n<p>In this case, \u2018fasteners\u2019 refers to materials such as nails and screws. What this definition does not account for are common details such as ties and shelf-angles in masonry construction or clips and z-grits (<em>i.e.<\/em> horizontal structural member providing lateral support to the wall panel) in non-masonry cladding assemblies.<\/p>\n<p>In a recent paper prepared by RDH Building Engineering Ltd., entitled \u201cThermal Bridging of Masonry Veneer Claddings and Energy Code Compliance,\u201d 3D-thermal modeling was used to determine the effects these types of details might have on the effective R-value of a wall assembly including continuous insulation. This value would change based on the actual construction assemblies and structure size. According to RDH:<\/p>\n<p><a name=\"note9\"><\/a><span style=\"font-size: 12pt; font-family: times new roman,times;\">metal cladding support connections occupying less than 0.5 percent and even less than 0.05 percent of the wall\u2019s surface area can have a profound impact on effective R-values (<em>i.e.<\/em> anywhere from 10 percent to greater than 50 percent)<\/span>.<a href=\"#note4\"><sup>4<\/sup><\/a><\/p>\n<p>Using masonry construction as an example, RDH goes on to explain different types of masonry ties (<em>e.g.<\/em> steel versus fiber) and various backup materials (<em>e.g.<\/em> wood stud, concrete, or steel backup) also have an impact on the degree of thermal bridging that may take place.<\/p>\n<figure id=\"attachment_3089\" aria-describedby=\"caption-attachment-3089\" style=\"width: 171px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Transition-from-overlapping-sheathing-to-foundation.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3089\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Transition-from-overlapping-sheathing-to-foundation-555x1000.jpg\" alt=\"Continuity of the air barrier is maintained at a transition from sheathing to foundation through the use of a flexible transition membrane embedded in a fluid-applied air\/moisture barrier. \" width=\"171\" height=\"308\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Transition-from-overlapping-sheathing-to-foundation-555x1000.jpg 555w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Transition-from-overlapping-sheathing-to-foundation-166x300.jpg 166w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Transition-from-overlapping-sheathing-to-foundation-624x1122.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Transition-from-overlapping-sheathing-to-foundation.jpg 943w\" sizes=\"auto, (max-width: 171px) 100vw, 171px\" \/><\/a><figcaption id=\"caption-attachment-3089\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Continuity of the air barrier is maintained at a transition from sheathing to foundation through the use of a flexible transition membrane embedded in a fluid-applied air\/moisture barrier.<\/span><\/figcaption><\/figure>\n<p>Due to their low insulative value, steel masonry ties may reduce the insulation effectiveness by five to eight percent, depending on the type of steel and backup materials. Even more impactful, direct attached masonry shelf angles may reduce the effective R-value by 40 to 55 percent in conjunction with typical exterior insulation thicknesses and steel masonry ties.<\/p>\n<p><a name=\"note10\"><\/a>Another study by Morrison Hershfield, \u201cThermal Performance of Building Envelope Details for Mid- and High-rise Buildings,\u201d looked at 40 common building design envelope details and again used 3D modeling to determine the effect thermal bridging might have on the overall thermal efficiency of buildings including continuous exterior insulation.<a href=\"#note5\"><sup>5<\/sup><\/a><\/p>\n<p>This study noted the addition of more materials with higher insulating values did not greatly improve the overall thermal performance of the wall assembly so long as these thermal bridges existed. It also points out quite clearly that even in buildings including continuous exterior insulation, all thermal bridges must be considered to determine a structure\u2019s overall thermal efficiency.<\/p>\n<p><strong>Continuous air barrier challenges<\/strong><br \/>\nThere are numerous products that qualify as air barriers including:<\/p>\n<ul>\n<li>building wraps;<\/li>\n<li>fluid-applied barriers;<\/li>\n<li>interior drywall;<\/li>\n<li>sprayed polyurethane foam (SPF);<\/li>\n<li>extruded polystyrene (XPS) insulation boards;<\/li>\n<li>self-adhered membranes; and<\/li>\n<li>polyethylene sheets.<\/li>\n<\/ul>\n<p>These products help prevent air leakage. If it was possible to construct buildings out of one material, and in a vacuum, any of these would work as an air barrier.<\/p>\n<p>Unfortunately, buildings are constructed out of thousands of different parts assembled together in climates with changing weather patterns, temperatures, and pressures. For an air barrier system to be continuous, it needs to be able to address joints and seams where sheathing materials meet.<\/p>\n<p>Transitions between dissimilar materials must be taken into account. For example, there is the transition from the sheathing of a building to its foundation. Air barrier products should be able to bond structurally to multiple types of substrates as well as being durable enough to bridge transitions where substrates may be out of plane with one another. Movement joints are included in buildings to account for anticipated expansion and contraction. As a result, the air barrier system should also be able to accommodate expansion and contraction.<\/p>\n<p>These air barrier products are also going to be subject to thermal changes that will cause additional stress on the materials during the building\u2019s lifespan. The result is products such as kraft papers and building wraps may ultimately tear or pull away from the building. Other products like common joint tapes or self-adhered membranes may lose adhesion if not properly installed, causing discontinuity of the air barrier and potentially creating opportunities for moisture to intrude. If air barrier systems do not account for the same stresses the building will experience, then they may not only lose effectiveness, but can also actually create problems within the wall cavity that may not be detected until extensive damage has already been done.<\/p>\n<figure id=\"attachment_3087\" aria-describedby=\"caption-attachment-3087\" style=\"width: 331px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Lido-Beach.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3087\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Lido-Beach-1000x666.jpg\" alt=\"The aging Lido Beach Towers (Long Island, NY) were retrofi tted with an exterior insulation fi nish system (EIFS), resulting in a more than 30 percent energy saving.\" width=\"331\" height=\"220\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Lido-Beach-1000x666.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Lido-Beach-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Lido-Beach-624x416.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Lido-Beach.jpg 2048w\" sizes=\"auto, (max-width: 331px) 100vw, 331px\" \/><\/a><figcaption id=\"caption-attachment-3087\" class=\"wp-caption-text\">The aging Lido Beach Towers (Long Island, NY) were retrofitted with an exterior insulation finish system (EIFS), resulting in a\u00a0 more than 30 percent energy saving.<\/figcaption><\/figure>\n<p>The construction of an airtight building envelope greatly reduces the risk of moisture problems as a result of air leakage and condensation. However, airtight construction may be less capable of drying than air-porous construction in the case of water leakage or other unplanned circumstances that might allow water to enter the wall assembly.<\/p>\n<p>Water is able to penetrate the building envelope through numerous means. For example, wind may drive rain through incidental cracks or holes in the building\u2019s cladding, or capillary action in porous materials, cracks, or holes may draw water toward the interior. Further, water vapor may be transported by air or diffusion that can condense on cold surfaces within the building envelope.<\/p>\n<p>As mentioned, there are various products that may be classified as air barriers, but not all of them can be classified as water-resistive barriers (WRBs). In fact, the <em>International Building Code<\/em> (<em>IBC<\/em>), <em>International Residential Code<\/em> (<em>IRC<\/em>), and <em>IECC<\/em> have specific requirements that must be met for these products to qualify as both an air barrier as well as a water-resistive barrier.<\/p>\n<p>In the case of air barriers, an individual product will be tested according to ASTM E2178, <em>Standard Test Method for Air Permeance of Building Materials<\/em>. Further, WRBs must meet ASTM D226, <em>Standard Specification for Asphalt-Saturated Organic Felt Used in Roofing and Waterproofing,<\/em> if they are to be considered waterproof.<\/p>\n<p>Common tests, such as American Association of Textile Chemists and Colorists (AATCC) 127, <em>Water Resistance: Hydrostatic Pressure Test<\/em>, measure a product\u2019s ability to resist water penetration under adverse conditions, such as wind-driven rain, which is simulated by placing the product under hydrostatic pressure.<\/p>\n<p>Traditionally, asphalt-saturated felt, kraft waterproof building paper, or building wraps have been used as the moisture protection component of wall construction. Installing these types of barriers usually involve shingle-style lapping and mechanical fastening to the sheathing with nails, screws, or staples. While these installation methods are common, because they disrupt the continuity of the air and water-resistive barrier, they actually provide opportunities for air leakage and moisture intrusion.<\/p>\n<p>The best choice for an air and water-resistive barrier is one that meets a number of durability requirements and is able to resist wind and rain loads. Common criteria to look for include:<\/p>\n<ul>\n<li>resistance to puncture, pests, and low-sustained negative pressure from building stack effect and HVAC fan effect;<\/li>\n<li>ability to withstand stress from thermal and moisture movement of building materials and stress from building creep; and<\/li>\n<li>resistance to mold growth and abrasion.<\/li>\n<\/ul>\n<p>Fluid-applied barriers are gaining popularity in both commercial and residential construction due to their ability to form a full monolithic barrier, as well as their durability and ease of application compared to a traditional wrap or paper product. Many of these products act as both an air barrier and a water-resistive barrier.<\/p>\n<figure id=\"attachment_3088\" aria-describedby=\"caption-attachment-3088\" style=\"width: 305px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Queens-Landing.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3088\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Queens-Landing-1000x666.jpg\" alt=\"Queen\u2019s Landing condominium community in Kent Island, MD, was also retrofi t with an energy-effi cient EIFS assembly. Some of the EIFS installations included a secondary water\/air management system, while some were fi t with a hybrid stucco system.\" width=\"305\" height=\"203\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Queens-Landing-1000x666.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Queens-Landing-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Queens-Landing-624x416.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Queens-Landing.jpg 2048w\" sizes=\"auto, (max-width: 305px) 100vw, 305px\" \/><\/a><figcaption id=\"caption-attachment-3088\" class=\"wp-caption-text\">Queen\u2019s Landing condominium community in Kent Island, MD, was also retrofit with an energy-efficient EIFS assembly. Some of the EIFS installations included a secondary water\/air management system, while some were fit with a hybrid stucco system.<\/figcaption><\/figure>\n<p>Fluid-applied barriers are generally rolled or sprayed onto sheathing or concrete masonry unit (CMU) backup and fully adhere, becoming part of the structural wall. Some manufacturers use adhesion testing, such as ASTM C297, <em>Standard Test Method for Flatwise Tensile Strength of Sandwich Constructions<\/em>, to verify a full bond between the barrier and the substrate. It is often found the adhesion may actually exceed the strength of the substrate itself. However, this is not the case with paper-type products where material may tear or blow off the building, or with self-adhered membranes where a loss of adhesion may cause edge peeling or a loss of the barrier altogether.<\/p>\n<p class=\" wp-image-3088\">As fluid-applied barriers are initially in liquid form, there is no lapping of materials that can create discontinuity of the barrier. Once a fluid-applied barrier is completely installed on a building\u2019s wall, the material acts as a single monolithic barrier. Fasteners such as nails, screws, and staples are not needed to apply fluid-applied barriers, so additional holes where rain can enter are less of a concern. Also, because fluid-applied barriers may be rolled or sprayed, the possibility of installation error is greatly reduced. Proper installation of paper-type products and self-adhered membranes frequently require cutting, folding, and use of special tools and accessories. Improper installation of these barriers can be costly and time-consuming to correct; all too often, these important details may be ignored altogether.<strong><br \/>\n<\/strong><\/p>\n<p><strong>Conclusion<\/strong><br \/>\nPlenty of research has been done to show the advantages of continuous insulation and air barriers. The inclusion of these elements in new construction should help enhance the overall energy efficiency of buildings and allow owners to realize energy cost savings as well. For design professionals, however, the task of creating an energy-efficient building may be just as difficult. New products and new resources are being developed every day to make this task easier, but in the meantime, the key point to remember is with both continuous insulation, as well as continuous air barriers, the details must be carefully considered to realize maximum energy efficiency.<\/p>\n<p><strong>Notes<\/strong><br \/>\n<a name=\"note1\"><\/a><sup>1<\/sup> For more, see U.S. Department of Energy (DOE) 2008, <em>Buildings Energy Data Book<\/em>. This resource was prepared for DOE\u2019s Office of Energy Efficiency and Renewable Energy (EERE) by D&amp;R International. (back to <a href=\"#note6\">top<\/a>)<br \/>\n<a name=\"note2\"><\/a><sup>2 <\/sup>For more, see \u201cThermal Performance of Steel-framed Walls,\u201d by E. Barbour, J. Godgrow, and J.E. Christian, published by the national Association of Home Builders (NAHB) Research Center in 1994. (back to <a href=\"#note7\">top<\/a>)<br \/>\n<a name=\"note3\"><\/a><sup>3<\/sup> See Morrison Hershfield\u2019s \u201cEnergy Conservation Benefits of Air Barriers\u2013StoGuard: The Effect on Energy Conservation,\u201d by Chris Norris. (back to <a href=\"#note8\">top<\/a>)<br \/>\n<a name=\"note4\"><\/a><sup>4<\/sup> See G. Finch et al.\u2019s \u201cThermal Bridging of Masonry Veneer Claddings and Energy Code Compliance.\u201d The proceedings are taken from 12<sup>th<\/sup> Canadian Masonry Symposium, held in Vancouver, B.C. in 2013. (back to <a href=\"#note9\">top<\/a>)<br \/>\n<a name=\"note5\"><\/a><sup>5<\/sup> See the Morrison Hershfield report, 1365-RP, \u201cThermal Performance of Building Envelope Details for Mid- and High-rise Buildings.\u201d (back to <a href=\"#note10\">top<\/a>)<\/p>\n<p><em>John Chamberlin is product manager for StoGuard and StoEnergy Guard at Sto Corp; these divisions are focused on heat, air, and moisture management within the building envelope. Prior to this position, he served as product manager for StoCoatings and as associate product manager for StoPowerwall and StoQuik Silver. Chamberlin earned a Master\u2019s in Business Administration at Atlanta\u2019s Emory University and is a graduate of the University of Tennessee, with a Bachelor of Science degree in Marketing. He can be reached by e-mail at <a href=\"mailto:%20jchamberlin@stocorp.com\">jchamberlin@stocorp.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Both conductive heat transfer and air leakage through the building enclosure have been identified as obstacles to truly energy efficient buildings. This article delves into the necessity for proper detailing of both continuous insulation and fluid-applied air barriers.<\/p>\n","protected":false},"author":4,"featured_media":3086,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,184,187,264,489,460],"tags":[544,780,150,782,781,83,783],"class_list":["post-3082","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-04-00-00-masonry","category-07-00-00-thermal-and-moisture-protection","category-07-20-00-thermal-protection","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-07-24-00-exterior-insulation-and-finish-systems","tag-07-27-00-air-barriers","tag-air-barrier","tag-ashrae-90-1","tag-b2010-80-exterior-wall-supplementary-components","tag-continuous-insulation","tag-exterior-insulation-fi-nish-system","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Detailing masonry and frame walls with continuous insulation and air barriers - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Detailing masonry and frame walls with continuous insulation and air barriers - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Both conductive heat transfer and air leakage through the building enclosure have been identified as obstacles to truly energy efficient buildings. This article delves into the necessity for proper detailing of both continuous insulation and fluid-applied air barriers.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2013-10-02T12:44:43+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-20T15:00:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1207\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Molly Doyle\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Molly Doyle\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"16 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/\"},\"author\":{\"name\":\"Molly Doyle\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\"},\"headline\":\"Detailing masonry and frame walls with continuous insulation and air barriers\",\"datePublished\":\"2013-10-02T12:44:43+00:00\",\"dateModified\":\"2017-01-20T15:00:42+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/\"},\"wordCount\":3152,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/fluid-applied-barrier-installed.jpg\",\"keywords\":[\"07 24 00\u2013Exterior Insulation and Finish Systems\",\"07 27 00\u2013Air Barriers\",\"air barrier\",\"ASHRAE 90.1\",\"B2010.80\u2013Exterior Wall Supplementary Components\",\"continuous insulation\",\"Exterior insulation fi nish system\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"04 00 00 Masonry\",\"07 00 00 Thermal and Moisture Protection\",\"07 20 00 Thermal Protection\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/\",\"name\":\"Detailing masonry and frame walls with continuous insulation and air barriers - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/fluid-applied-barrier-installed.jpg\",\"datePublished\":\"2013-10-02T12:44:43+00:00\",\"dateModified\":\"2017-01-20T15:00:42+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/fluid-applied-barrier-installed.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/fluid-applied-barrier-installed.jpg\",\"width\":2048,\"height\":1207,\"caption\":\"Photo courtesy Sto Corp.\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Detailing masonry and frame walls with continuous insulation and air barriers\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\",\"name\":\"Molly Doyle\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"caption\":\"Molly Doyle\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/molly\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Detailing masonry and frame walls with continuous insulation and air barriers - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/","og_locale":"en_US","og_type":"article","og_title":"Detailing masonry and frame walls with continuous insulation and air barriers - The Construction Specifier","og_description":"Both conductive heat transfer and air leakage through the building enclosure have been identified as obstacles to truly energy efficient buildings. This article delves into the necessity for proper detailing of both continuous insulation and fluid-applied air barriers.","og_url":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/","og_site_name":"The Construction Specifier","article_published_time":"2013-10-02T12:44:43+00:00","article_modified_time":"2017-01-20T15:00:42+00:00","og_image":[{"width":2048,"height":1207,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed.jpg","type":"image\/jpeg"}],"author":"Molly Doyle","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Molly Doyle","Est. reading time":"16 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/"},"author":{"name":"Molly Doyle","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294"},"headline":"Detailing masonry and frame walls with continuous insulation and air barriers","datePublished":"2013-10-02T12:44:43+00:00","dateModified":"2017-01-20T15:00:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/"},"wordCount":3152,"commentCount":1,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed.jpg","keywords":["07 24 00\u2013Exterior Insulation and Finish Systems","07 27 00\u2013Air Barriers","air barrier","ASHRAE 90.1","B2010.80\u2013Exterior Wall Supplementary Components","continuous insulation","Exterior insulation fi nish system"],"articleSection":["Features","MasterFormat","UniFormat","04 00 00 Masonry","07 00 00 Thermal and Moisture Protection","07 20 00 Thermal Protection","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/","url":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/","name":"Detailing masonry and frame walls with continuous insulation and air barriers - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed.jpg","datePublished":"2013-10-02T12:44:43+00:00","dateModified":"2017-01-20T15:00:42+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/fluid-applied-barrier-installed.jpg","width":2048,"height":1207,"caption":"Photo courtesy Sto Corp."},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/detailing-masonry-and-frame-walls-with-continuous-insulation-and-air-barriers\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Detailing masonry and frame walls with continuous insulation and air barriers"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294","name":"Molly Doyle","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","caption":"Molly Doyle"},"url":"https:\/\/www.constructionspecifier.com\/author\/molly\/"}]}},"views":23563,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/3082","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=3082"}],"version-history":[{"count":4,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/3082\/revisions"}],"predecessor-version":[{"id":25622,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/3082\/revisions\/25622"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/3086"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=3082"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=3082"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=3082"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}