{"id":31463,"date":"2017-03-31T15:00:52","date_gmt":"2017-03-31T19:00:52","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=31463"},"modified":"2020-01-17T09:07:11","modified_gmt":"2020-01-17T14:07:11","slug":"avoiding-a-contractual-fatal-flaw","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/","title":{"rendered":"Avoiding a contractual fatal flaw"},"content":{"rendered":"<p class=\"BodyTextNoIndent\"><span style=\"font-size: 14pt; color: #808080;\"><span style=\"color: #888888; font-size: large;\"><strong><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-10874 alignleft\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/08\/OBeirne-2013-07-e1440767691998-250x300.jpg\" alt=\"\" width=\"173\" height=\"207\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/08\/OBeirne-2013-07-e1440767691998-250x300.jpg 250w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/08\/OBeirne-2013-07-e1440767691998.jpg 376w\" sizes=\"auto, (max-width: 173px) 100vw, 173px\" \/>SPECIFICATIONS<\/strong><\/span><br \/>\n<\/span><strong>By Kevin O&#8217;Beirne, PE, FCSI, CCS<br \/>\n<\/strong>You may perhaps be thinking: \u201cIsn\u2019t the title of this article a bit over-dramatic? I mean, \u2018what constitutes the construction contract documents\u2019 is about as basic and boring as it gets.\u201d However, this is an important topic that is rarely well-appreciated by owners and design professionals, and one few in the design community think much about. In fact, the people who most contemplate this question are probably contractors\u2019 attorneys.<\/p>\n<p>Owners and design professionals always hope not to have to deal with lawyers on their projects. The last thing owners and design professionals want is for contractors\u2019 barristers to pick through the construction contract documents trying to find loopholes to benefit their client. Imagine that on a project, your client (the owner) and you (the design professional) are engaged in an unpleasant claim with the contractor, who has already retained an attorney. The contractor\u2019s lawyer announces, \u201cThis claim is over. The provision on which you\u2019ve based your position\u2014that the matter in question was already part of my client\u2019s contractual work\u2014was never actually part of the contract at all, because that item was never part of the contract documents.\u201d You can probably feel your stomach drop at the thought.<\/p>\n<p>This is what is referred to as a \u2018fatal contractual flaw.\u2019<\/p>\n<p><strong>What is a contract document?<br \/>\n<\/strong>Construction \u2018Contract Documents\u2019\u2014a term usually indicated in their associated contract using initial capital letters\u2014are the written documents defining the roles, responsibilities, and \u2018Work\u2019 (with another initial capital) under the construction contract. They are legally binding on the parties to the contract, usually the owner and contractor. If it is a contract document, the parties are bound by the obligations indicated therein.<\/p>\n<p>Therefore, knowing which of the particular documents constitute the contract documents is very important, and should be indicated at only one appropriate location in the construction contract. The listing of what comprises the contract documents should be complete, correct, unambiguous, and not subject to unintended interpretations. Further, documents that have nothing to do with the parties\u2019 obligations once the contract is signed and therefore in effect should not be contract documents.<\/p>\n<p>Where should this all-important listing be located? American Institute of Architects (AIA) A521\/Engineers Joint Contract Documents Committee (EJCDC) N-122, <em>Uniform Location <\/em><em>of Subject Matter<\/em> (2012), jointly developed by the AIA and EJCDC with CSI\u2019s support, indicates that the preferred location is the owner-contractor agreement. The standard contract documents of the AIA and EJCDC follow suit\u2014see AIA A101-2007, <em>Standard Form <\/em><em>of Agreement Between Owner and Contractor (Stipulated Sum)<\/em>, and EJCDC C-520 (2013), <em>Agreement Between Owner and Contractor for Construction Contract (Stipulated Price)<\/em>.<\/p>\n<p><strong>List it once, and once only<br \/>\n<\/strong>CSI\u2019s well-known contract-writing axiom, \u201cSay it once and in the right place,\u201d is particularly important here, because indicating a requirement at only one location reduces the potential for conflicting provisions. In other words, if one lists what constitutes the contract documents at two locations and the two differ, a court or arbitration board is likely to rule that the governing provision is the one least onerous to the contractor. This may result in an unhappy owner and a design professional who may not work for that owner again.<\/p>\n<p>Unfortunately, the enumeration of the contract documents is sometimes included multiple times in the construction contracts. One of this author\u2019s favorite things to look for when reviewing non-standard construction documents (<em>i.e.<\/em> documents not written by an independent, non-profit organization such as the AIA or EJCDC) is to find each location where the contract documents are listed, as well as the inconsistencies between them. Most people would probably be surprised at how commonly such provisions are included in construction contracts, and how often they differ from other, similar provisions in the same contract.<\/p>\n<p>Even the AIA\u2019s 2007 documents do this, no less than in three different locations\u2014in AIA A101-2007 at Articles 1 and 9 (twice in the same document), and in AIA A201-2007, <em>Standard General Conditions of the Contract for Construction<\/em>, at Section 1.1.1. Worse, there are differences between each of these.<\/p>\n<p>In contrast, starting with its 2002 edition and continuing through the current 2013 edition, EJCDC\u2019s Construction Series (C-series) Documents are better in this regard\u2014what constitutes the contract documents is listed only once, at EJCDC C-520\u2019s Article 9.<\/p>\n<p>EJCDC C-700 (2013), <em>Standard General Conditions of the Construction Contract<\/em>, defines the term \u2018Contract Documents,\u2019 simply as: \u201cThose items so designated in the Agreement, and which together comprise the Contract.\u201d<\/p>\n<p>EJCDC\u2019s approach has thus reduced potential for conflicting interpretations of what comprises the contract documents.<!--nextpage--><\/p>\n<figure id=\"attachment_31466\" aria-describedby=\"caption-attachment-31466\" style=\"width: 800px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-11.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-31466 size-full\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-11.jpg\" alt=\"\" width=\"800\" height=\"556\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-11.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-11-300x209.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-11-768x534.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-11-500x348.jpg 500w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-31466\" class=\"wp-caption-text\">This table compares enumerations of the contract documents, as written in AIA A101-2007 and EJCDC C-520. <br \/> Information courtesy AIA and EJCDC<\/figcaption><\/figure>\n<p><strong>What constitutes the contract documents?<br \/>\n<\/strong>AIA A101-2007 Article 9 and EJCDC C-520 (2013) Article 9 each offer listings defining the contract documents, as presented in Figure 1. A notable difference between the AIA\u2019s and EJCDC\u2019s standard enumerations of the contract documents is that the AIA\u2019s model language does not explicitly include performance and payment bonds as contract documents. However, there are also some common themes between the two. For instance, both the AIA and EJCDC offer specific indication of the exact extent of each contract document, including the number of pages for each, the individual specifications sections, and the extent of the drawings. Neither leaves what constitutes \u2018drawings\u2019 and \u2018specifications\u2019 unspecific.<\/p>\n<p>Further, neither includes documents comprising the bidding requirements, which typically apply only to the bidding or procurement process but are not applicable after the contract is fully signed by the parties and made effective. The exception to this is that EJCDC allows, via optional language, inclusion of the contractor\u2019s bid\u2014typically only the list of bid items with their associated pricing\u2014as an exhibit to the agreement for contracts that have numerous bid items. EJCDC includes such optional language primarily to reduce the potential for transcription errors when drafting the final owner-contractor agreement for signature. Contracts with numerous bid items are common in civil\/sitework, where there are often many unit price items.<\/p>\n<p>It is incumbent on the person preparing the final contract documents for signature, usually after the bids are opened and the contract is awarded, to carefully complete Article 9 of the owner-contractor agreement, and to ensure all required contract documents are properly and fully enumerated therein.<\/p>\n<p>Correspondingly, when the final contract documents are assembled for signature by the parties, they should not include extraneous documents such as the bidding requirements (<em>e.g.<\/em> advertisement or invitation to bid, instructions to bidders, bid form, bid bond, or other bid form supplements). It is also important to delete such items from the project manual\u2019s table of contents before finalizing the contract documents for signature.<\/p>\n<p><strong>What should not be contract documents?<br \/>\n<\/strong>It is tempting to worry only about what the contract documents are, but one should also be aware that confusion on these items is common. For clarification, the following should not be considered or indicated as contract documents:<\/p>\n<ul>\n<li>bidding requirements, as discussed earlier in this article;<\/li>\n<li>reports and drawings characterizing the site, such as soil boring logs, geotechnical engineering reports, drawings of existing conditions and record drawings, and reports of hazardous materials at the site (the reasons why such items should not be contract documents will be addressed in a future article);<\/li>\n<li>permits obtained by the owner, because any such permits\u2014with which the contractor must comply\u2014should be explicitly and clearly written into the specifications (merely binding in a lengthy regulatory permit may introduce unnecessary requirements inapplicable to the contractor, which could create confusion and conflicts with other contract documents);<\/li>\n<li>evidence of insurance submitted by the parties (<em>e.g. <\/em>insurance certificates and endorsements) that are prepared neither by the parties to the contractor nor the design professional, as they may contain provisions conflicting with the insurance requirements of the contract documents\u2014rather, insurance certificates and endorsements serve only to indicate how the parties propose to comply with insurance requirements of the contract;<\/li>\n<li>shop drawings and other contractor submittals, which typically contain a much greater level of detail than the contract documents, may conflict with the contract documents, and are not prepared or sealed by the owner\u2019s design professional\u2014similar reasoning applies to contractor-generated coordination drawings;<\/li>\n<li>correspondence and meeting minutes; and<\/li>\n<li>RFIs and associated responses from the design professional, because these documents merely clarify what the contract documents already say, and should not be used to attempt to change the contract\u2019s requirements. Each RFI response that addresses a change to the contract\u2019s requirements should be accompanied by an associated contract modification, such as a change order\/directive or field order\/architect\u2019s supplemental constructions.<\/li>\n<\/ul>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_31468\" aria-describedby=\"caption-attachment-31468\" style=\"width: 353px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/bigstock-166380578.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-31468 \" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/bigstock-166380578.jpg\" alt=\"\" width=\"353\" height=\"236\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/bigstock-166380578.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/bigstock-166380578-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/bigstock-166380578-768x513.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/bigstock-166380578-500x334.jpg 500w\" sizes=\"auto, (max-width: 353px) 100vw, 353px\" \/><\/a><figcaption id=\"caption-attachment-31468\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">Design professional and contractors work together during construction. <\/span><br \/><em><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\"> Photo \u00a9 BigStockPhoto<\/span><\/em><\/figcaption><\/figure>\n<p><strong>Vaguely defined contract documents<br \/>\n<\/strong>This author has reviewed more than 100 owners\u2019 non-standard construction documents, and has encountered many definitions of contract documents that are too vague to be effective, and which therefore increase the owner\u2019s risk.<\/p>\n<p>An example of undesirable vagueness from one such contract is, \u201cthe Contract Documents\u2026include all exhibits, attachments, supplements, and all other such documents used as contract modifications.\u201d<\/p>\n<p>It could take opposing lawyers a very long time to argue various interpretations of such a provision.<\/p>\n<p>Another problem frequently observed by this writer is requiring blanket compliance with referenced documents such as state or provincial Department of Transportation (DOT) standard specifications, but not indicating them in full or in specific part as contract documents. (This does not refer to compliance with cited reference standards such as ASTM or ANSI standards. Rather, multiple contracts reviewed by this author require blanket compliance with all associated state DOT standard specifications or similar regional or local standards.) Requiring such compliance with a comprehensive set of third-party documents\u2014which often have their own general conditions-type provisions\u2014may create contractual nightmares full of fatal contractual flaws. Figuring out which requirements apply in any resulting claims will take a long time, a lot of money, and the involvement of several lawyers and arbitrators.<\/p>\n<p>This author has also observed a relatively prevalent practice of including \u2018appendices\u2019 in construction project manuals\u2014perhaps as a means of adding information that the design professional does not otherwise know where to place. While appendices appear in construction documents, this author has never seen them listed in the owner-contractor agreement (or elsewhere) as being part of the contract documents. Are they a contractual obligation? That may be for a jury or arbitration board to decide, unless design professionals can avoid such vagueness when drafting the construction documents.<\/p>\n<figure id=\"attachment_31470\" aria-describedby=\"caption-attachment-31470\" style=\"width: 448px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-14.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-31470\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-14.jpg\" alt=\"\" width=\"448\" height=\"275\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-14.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-14-300x184.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-14-768x471.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/CS_Apr_2017_HR-14-500x307.jpg 500w\" sizes=\"auto, (max-width: 448px) 100vw, 448px\" \/><\/a><figcaption id=\"caption-attachment-31470\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">This figure displays the interrelationships and terminology relevant to construction documents. <\/span><br \/> <em><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\"> Image courtesy Arcadis<\/span><\/em><\/figcaption><\/figure>\n<p><strong>Avoiding mixing up the terms<br \/>\n<\/strong>It can be easy for project stakeholders to mix up terms such as \u2018contract documents,\u2019 \u2018bidding documents,\u2019 \u2018construction documents,\u2019 and \u2018specifications.\u2019 However, these are not interchangeable. Misusing such terms in the contract documents can have important ramifications\u2014which most people do not want to learn from the contractor\u2019s attorney. This is presented fairly well in Figure 2.<\/p>\n<p>EJCDC C-700 (2013) defines various terms at Paragraph 1.01 A, including:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><em>Bidding Documents<\/em>\u2014The Bidding Requirements, the proposed Contract Documents, and all Addenda \u2026<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><em>Bidding Requirements<\/em>\u2014The advertisement or invitation to bid, Instructions to Bidders, Bid Bond or other Bid security, if any, the Bid Form, and the Bid with any attachments \u2026<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><em>Contract Documents<\/em>\u2014Those items so designated in the Agreement, and which together comprise the Contract \u2026<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><em>Drawings<\/em>\u2014The part of the Contract that graphically shows the scope, extent, and character of the Work to be performed by Contractor \u2026<\/span><\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><em>Specifications<\/em>\u2014The part of the Contract that consists of written requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable to the Work.<\/span><\/p>\n<p>The definition of \u2018Specifications\u2019 does not include contract requirements such as the owner-contractor agreement, contract bonds, general conditions, or supplementary conditions; thus, such documents are not \u2018Specifications.\u2019<\/p>\n<p>Note in the following definition from EJCDC C-700 (2013), \u2018Shop Drawings\u2019 are specifically not part of the contract documents:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><em>Shop Drawings<\/em>\u2014All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled by or for Contractor and submitted by Contractor to illustrate some portion of the Work. Shop Drawings, whether approved or not, are not Drawings and are not Contract Documents.<\/span><\/p>\n<p>Another useful definition from EJCDC C-700 (2013) is:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\"><em>Project Manual<\/em>\u2014The written documents prepared for, or made available for, procuring and constructing the Work, including but not limited to the Bidding Documents or other construction procurement documents, geotechnical and existing conditions information, the Agreement, bond forms, General Conditions, Supplementary Conditions, and Specifications. The contents of the Project Manual may be bound in one or more volumes.<\/span><\/p>\n<p>The AIA\u2019s standard contract documents include definitions of most of the above terms, using language very similar to EJCDC\u2019s. For corresponding AIA definitions, see AIA A101, AIA A201, and AIA A701, <em>Instructions to Bidders<\/em>.<\/p>\n<p><strong>Conclusion<br \/>\n<\/strong>It is crucial to indicate what constitutes the contract documents completely and clearly, and at only one location\u2014preferably, the owner-contractor agreement. Owners and design professionals need to be cognizant of this matter, and properly draft the associated provisions. Failure to do so can mean unpleasant encounters with attorneys and significant embarrassment.<\/p>\n<p><em>Kevin O\u2019Beirne, PE, FCSI, CCS, CCCA, is a principal engineer and manager of standard construction documents at Arcadis in Buffalo, New York. He is a professional engineer licensed in New York and Pennsylvania, with 30 years of experience designing and constructing water and wastewater infrastructure. O\u2019Beirne is an active member and past national chair of the Engineers Joint Contract Documents Committee (EJCDC), and is a member of CSI\u2019s MasterFormat Maintenance Task Team. He can be reached at <a href=\"mailto:kevin.obeirne@arcadis.com\">kevin.obeirne@arcadis.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>You may perhaps be thinking: \u201cIsn\u2019t the title of this article a bit over-dramatic?&#8221; However, this is an important topic that is rarely well-appreciated by owners and design professionals, and one few in the design community think much about. <\/p>\n","protected":false},"author":5,"featured_media":31474,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,28],"tags":[1033,3437,3438],"class_list":["post-31463","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-specifications","tag-contract-documents","tag-contractual-fatal-flaws","tag-terminology","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Avoiding a contractual fatal flaw - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Avoiding a contractual fatal flaw - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"You may perhaps be thinking: \u201cIsn\u2019t the title of this article a bit over-dramatic?&quot; However, this is an important topic that is rarely well-appreciated by owners and design professionals, and one few in the design community think much about.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2017-03-31T19:00:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-17T14:07:11+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/featured1-20.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Katie Daniel\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Katie Daniel\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/\"},\"author\":{\"name\":\"Katie Daniel\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/34e59e3f0bf081d4b975ae9b2c1764f3\"},\"headline\":\"Avoiding a contractual fatal flaw\",\"datePublished\":\"2017-03-31T19:00:52+00:00\",\"dateModified\":\"2020-01-17T14:07:11+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/\"},\"wordCount\":2305,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/featured1-20.jpg\",\"keywords\":[\"contract documents\",\"Contractual fatal flaws\",\"Terminology\"],\"articleSection\":[\"Features\",\"Specifications\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/\",\"name\":\"Avoiding a contractual fatal flaw - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/featured1-20.jpg\",\"datePublished\":\"2017-03-31T19:00:52+00:00\",\"dateModified\":\"2020-01-17T14:07:11+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/avoiding-a-contractual-fatal-flaw\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/featured1-20.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/03\\\/featured1-20.jpg\",\"width\":600,\"height\":300},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/34e59e3f0bf081d4b975ae9b2c1764f3\",\"name\":\"Katie Daniel\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g\",\"caption\":\"Katie Daniel\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/katie-daniel\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Avoiding a contractual fatal flaw - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/","next":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/2\/","og_locale":"en_US","og_type":"article","og_title":"Avoiding a contractual fatal flaw - The Construction Specifier","og_description":"You may perhaps be thinking: \u201cIsn\u2019t the title of this article a bit over-dramatic?\" However, this is an important topic that is rarely well-appreciated by owners and design professionals, and one few in the design community think much about.","og_url":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/","og_site_name":"The Construction Specifier","article_published_time":"2017-03-31T19:00:52+00:00","article_modified_time":"2020-01-17T14:07:11+00:00","og_image":[{"width":600,"height":300,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/featured1-20.jpg","type":"image\/jpeg"}],"author":"Katie Daniel","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Katie Daniel","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/"},"author":{"name":"Katie Daniel","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/34e59e3f0bf081d4b975ae9b2c1764f3"},"headline":"Avoiding a contractual fatal flaw","datePublished":"2017-03-31T19:00:52+00:00","dateModified":"2020-01-17T14:07:11+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/"},"wordCount":2305,"commentCount":1,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/featured1-20.jpg","keywords":["contract documents","Contractual fatal flaws","Terminology"],"articleSection":["Features","Specifications"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/","url":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/","name":"Avoiding a contractual fatal flaw - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/featured1-20.jpg","datePublished":"2017-03-31T19:00:52+00:00","dateModified":"2020-01-17T14:07:11+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/avoiding-a-contractual-fatal-flaw\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/featured1-20.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/03\/featured1-20.jpg","width":600,"height":300},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/34e59e3f0bf081d4b975ae9b2c1764f3","name":"Katie Daniel","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/61581f197b5eb954385d63e8f4a68b6624a13223539469ba68b02582f220045a?s=96&d=mm&r=g","caption":"Katie Daniel"},"url":"https:\/\/www.constructionspecifier.com\/author\/katie-daniel\/"}]}},"views":20895,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/31463","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=31463"}],"version-history":[{"count":7,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/31463\/revisions"}],"predecessor-version":[{"id":31473,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/31463\/revisions\/31473"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/31474"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=31463"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=31463"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=31463"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}