{"id":33453,"date":"2017-04-26T15:24:44","date_gmt":"2017-04-26T19:24:44","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=33453"},"modified":"2017-04-26T15:24:44","modified_gmt":"2017-04-26T19:24:44","slug":"surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/","title":{"rendered":"Surfacing solution at Baltimore hospital keeps patients on their feet"},"content":{"rendered":"<figure id=\"attachment_33454\" aria-describedby=\"caption-attachment-33454\" style=\"width: 785px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-33454 \" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_2.jpg\" alt=\"\" width=\"785\" height=\"523\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_2.jpg 1024w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_2-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_2-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_2-500x333.jpg 500w\" sizes=\"auto, (max-width: 785px) 100vw, 785px\" \/><\/a><figcaption id=\"caption-attachment-33454\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The surfacing solution specified by Johns Hopkins Hospital (JHH) for installation in 56 inpatient rooms at the JHH Meyer Psychiatry and Rehab facility resembles wood, but features a vinyl surface fusion bonded to a recycled rubber backing. It was installed in patient rooms in September.<\/span><br \/> <em>Photos courtesy Ecore<\/em><\/figcaption><\/figure>\n<p>Flooring for healthcare projects needs to be functional, but it should also offer something aesthetically. Beyond that, some design professionals have wondered what effect floorcoverings, along with the wider built environment, can have on occupant wellness. In a 90-day flooring test running from November 2014 to February 2015, Baltimore\u2019s Johns Hopkins Hospital (JHH) attempted to answer this question. Acknowledging carpeting\u2019s inability to meet various goals, JHH sought to develop a new protocol for flooring safety and performance, and to choose a more-effective solution.<\/p>\n<p>\u201cWe can\u2019t get carpet clean,\u201d said Teri Bennett, lead interior designer in the hospital\u2019s architecture and planning department. \u201cOur consultants wanted us to use new products in projects that hadn\u2019t been tested in active healthcare environments. We didn\u2019t want to install them without testing.\u201d<\/p>\n<p>Generally, it was agreed any surfacing used for the facility would need to provide:<\/p>\n<ul>\n<li>cost-effectiveness;<\/li>\n<li>ease of maintenance;<\/li>\n<li>low gloss (<em>i.e.<\/em> not requiring wax);<\/li>\n<li>infection control;<\/li>\n<li>low volatile organic compounds (VOCs);<\/li>\n<li>acoustic performance; and<\/li>\n<li>sustainability.<\/li>\n<\/ul>\n<p>\u201cWe had little experience with green, recycled products and products made from alternative materials,\u201d said Andrea Hyde, planner and designer in the JHH architecture and planning department. \u201cWe wanted to prove to ourselves that we could try sustainable products and see how they do.\u201d<\/p>\n<p>Information was collected regarding 20 different products, including 11 resilient and nine acoustic non-carpet surfaces.<\/p>\n<p>Some specific examples include:<\/p>\n<ul>\n<li>textile composite;<\/li>\n<li>rubber;<\/li>\n<li>rubber composite;<\/li>\n<li>vinyl rubber composite; and<\/li>\n<li>heterogeneous and homogeneous resilient flooring.<\/li>\n<\/ul>\n<p>Each product was installed on a 2 x 5.5-m (6 x 18-ft) site with a 1-m (4-ft) walking width, located along a corridor between the hospital\u2019s main campus and its outpatient center. A metro subway entrance to JHH\u2019s East Baltimore campus is also part of this corridor, contributing to its estimated 20,000 footfalls per day.<\/p>\n<p>Acoustic testing was completed by rolling carts across each type of flooring\u2014with some clear standouts, as Hyde notes.<\/p>\n<figure id=\"attachment_33456\" aria-describedby=\"caption-attachment-33456\" style=\"width: 305px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_one.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-33456\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_one-200x300.jpg\" alt=\"\" width=\"305\" height=\"458\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_one-200x300.jpg 200w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_one-333x500.jpg 333w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/JH_one.jpg 683w\" sizes=\"auto, (max-width: 305px) 100vw, 305px\" \/><\/a><figcaption id=\"caption-attachment-33456\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The surfacing installed will reduce the risk of injury associated with falls, and offers both sound control and comfort underfoot.<\/span><\/figcaption><\/figure>\n<p>\u201cThe entire side that we were testing acoustics on was interesting,\u201d she explained. \u201cYou hit the granite tile, then you rolled over our resilient floor, then you hit the granite tile again, and then you rolled over the acoustic test floor. We felt the products we were testing on that side\u2026 were truly making a sound difference as people rolled on that side of the floor. It was rattly on the tile. Then you moved, and it would be dead\u2014the clicking, the rolling noises, and all that stuff.\u201d<\/p>\n<p>Among the highest-performing products tested was a flooring incorporating rubber bonded to a heterogeneous vinyl sheet, with high acoustic performance and fall resistance.<\/p>\n<p>\u201cPeople commented when it left\u2014people were not happy,\u201d Hyde explained. \u201cThe tunnel can be quite loud.\u201d<\/p>\n<p>Cleanliness was another important consideration, in part due to seasonal conditions.<\/p>\n<p>\u201c[The test] was right at winter time. Even though the metro is underground, the weather was a factor,\u201d says Hyde. \u201cYou really did see the tracked-in salt and moisture and things coming from people\u2019s feet and going across it.\u201d<\/p>\n<p>Sealing can sometimes take time at JHH, as it is not possible until after rooms are occupied, so it was important for each product type to be tested in both a sealed and unsealed state. This was particularly enlightening, according to Hyde, who says \u201csome products became complete dirt magnets without sealer.\u201d<\/p>\n<p>Despite this, the testing revealed only two failures, which wore poorly or changed color when the required cleaning and sealing products were used.<\/p>\n<p>\u201cIt wasn\u2019t a dirt wear,\u201d said Bennett. \u201cThe product got darker and darker as we cleaned it.\u201d<\/p>\n<p>However, the rubber-and-vinyl product mentioned above performed well when tested for cleanability, stain removal, and durability, thanks to its cross-linked polyurethane reinforcement (PUR). The surfacing also excelled in terms of compression. Each manufacturer\u2019s recommended weld rod was used to place seams in the middle of each testing site.<\/p>\n<p>\u201cWe wondered if we would see some failure at the heavy-traffic edge,\u201d Hyde said of the rubber product. \u201cWe did not; it worked great, actually.\u201d<\/p>\n<p>Given the surfacing\u2019s ability to effectively meet each of the facility\u2019s goals, it was specified for 56 inpatient rooms at JHH\u2019s Meyer Phsychiatry and Rehab building.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Some design professionals have wondered what effect floorcoverings, along with the wider built environment, can have on occupant wellness. In a 90-day flooring test running from November 2014 to February 2015, Baltimore\u2019s Johns Hopkins Hospital (JHH) attempted to answer this question.<\/p>\n","protected":false},"author":1836,"featured_media":33460,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,449,189,284,509,463,1254],"tags":[17,556,2039,3353,3463,1185],"class_list":["post-33453","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-uniformat","category-09-00-00-finishes","category-09-60-00-flooring","category-c2030flooring","category-c20interior-finishes","category-hospitals","tag-flooring","tag-healthcare","tag-hospital","tag-maryland","tag-surfacing","tag-testing","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Surfacing solution at Baltimore hospital keeps patients on their feet - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Surfacing solution at Baltimore hospital keeps patients on their feet - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Some design professionals have wondered what effect floorcoverings, along with the wider built environment, can have on occupant wellness. In a 90-day flooring test running from November 2014 to February 2015, Baltimore\u2019s Johns Hopkins Hospital (JHH) attempted to answer this question.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2017-04-26T19:24:44+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/feat-5.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"450\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Carly Midgley\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Carly Midgley\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/\"},\"author\":{\"name\":\"Carly Midgley\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b70033b703868965f86aed130f7abb00\"},\"headline\":\"Surfacing solution at Baltimore hospital keeps patients on their feet\",\"datePublished\":\"2017-04-26T19:24:44+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/\"},\"wordCount\":781,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/feat-5.jpg\",\"keywords\":[\"Flooring\",\"Healthcare\",\"Hospital\",\"Maryland\",\"surfacing\",\"Testing\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"UniFormat\",\"09 00 00 Finishes\",\"09 60 00 Flooring\",\"C2030\u2212Flooring\",\"C20\u2212Interior Finishes\",\"Hospitals\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/\",\"name\":\"Surfacing solution at Baltimore hospital keeps patients on their feet - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/feat-5.jpg\",\"datePublished\":\"2017-04-26T19:24:44+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/feat-5.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/04\\\/feat-5.jpg\",\"width\":\"450\",\"height\":\"300\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Surfacing solution at Baltimore hospital keeps patients on their feet\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b70033b703868965f86aed130f7abb00\",\"name\":\"Carly Midgley\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g\",\"caption\":\"Carly Midgley\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/carly_midgley\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Surfacing solution at Baltimore hospital keeps patients on their feet - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/","og_locale":"en_US","og_type":"article","og_title":"Surfacing solution at Baltimore hospital keeps patients on their feet - The Construction Specifier","og_description":"Some design professionals have wondered what effect floorcoverings, along with the wider built environment, can have on occupant wellness. In a 90-day flooring test running from November 2014 to February 2015, Baltimore\u2019s Johns Hopkins Hospital (JHH) attempted to answer this question.","og_url":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/","og_site_name":"The Construction Specifier","article_published_time":"2017-04-26T19:24:44+00:00","og_image":[{"width":450,"height":300,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/feat-5.jpg","type":"image\/jpeg"}],"author":"Carly Midgley","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Carly Midgley","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/"},"author":{"name":"Carly Midgley","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b70033b703868965f86aed130f7abb00"},"headline":"Surfacing solution at Baltimore hospital keeps patients on their feet","datePublished":"2017-04-26T19:24:44+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/"},"wordCount":781,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/feat-5.jpg","keywords":["Flooring","Healthcare","Hospital","Maryland","surfacing","Testing"],"articleSection":["Form+Function","MasterFormat","UniFormat","09 00 00 Finishes","09 60 00 Flooring","C2030\u2212Flooring","C20\u2212Interior Finishes","Hospitals"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/","url":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/","name":"Surfacing solution at Baltimore hospital keeps patients on their feet - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/feat-5.jpg","datePublished":"2017-04-26T19:24:44+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/feat-5.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/04\/feat-5.jpg","width":"450","height":"300"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/surfacing-solution-at-baltimore-hospital-keeps-patients-on-their-feet\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Surfacing solution at Baltimore hospital keeps patients on their feet"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b70033b703868965f86aed130f7abb00","name":"Carly Midgley","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/caeacaadbc68534b642cae2b16df4c17877b086817be90e56a0bef7d0c37de94?s=96&d=mm&r=g","caption":"Carly Midgley"},"url":"https:\/\/www.constructionspecifier.com\/author\/carly_midgley\/"}]}},"views":5184,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/33453","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/1836"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=33453"}],"version-history":[{"count":3,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/33453\/revisions"}],"predecessor-version":[{"id":33459,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/33453\/revisions\/33459"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/33460"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=33453"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=33453"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=33453"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}