{"id":36908,"date":"2017-06-07T17:02:00","date_gmt":"2017-06-07T21:02:00","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=36908"},"modified":"2017-06-12T15:42:33","modified_gmt":"2017-06-12T19:42:33","slug":"gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/","title":{"rendered":"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank"},"content":{"rendered":"<p class=\"bwalignc\"><i>This loan will support the construction of Block 6 to bring a vibrant mix of the business world and urban living to The Waterfront Vancouver<\/i><\/p>\n<p>TUALATIN, Ore.&#8211;(BUSINESS WIRE)&#8211;<a href=\"http:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=http%3A%2F%2Fgramor.com%2F&amp;esheet=51571424&amp;newsitemid=20170607006392&amp;lan=en-US&amp;anchor=Gramor+Development%2C+Inc.&amp;index=1&amp;md5=048e76352fb87ce54ef95b19ad1ba8a8\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">Gramor Development, Inc.<\/a> announced today that it has closed on a construction loan totaling $42.5 million with U.S. Bank for The Waterfront Vancouver development on the Columbia River in Vancouver, Wash. The loan will support the construction of Block 6 Office and Block 6 Residential as phase 1 of The Waterfront 20-block mixed-use destination continues to progress.<br \/>\n<a href=\"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591493\/5\/The_Waterfront_May_2017.jpg\"><img decoding=\"async\" src=\"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591493\/21\/The_Waterfront_May_2017.jpg\" \/><\/a><br \/>\n<a href=\"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591492\/5\/GRAMORLOGO_JPEG_highres.jpg\"><img decoding=\"async\" src=\"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591492\/21\/GRAMORLOGO_JPEG_square.jpg\" \/><\/a><\/p>\n<p>\u201cThis is a really exciting time for The Waterfront project,\u201d said Barry Cain, the president of Gramor. \u201cThe transformation is well underway and it\u2019s unlike anything that currently exists in our area. We\u2019re turning what was once an industrial area into a vibrant destination for tourists, businesses and the surrounding community.\u201d<\/p>\n<p>Specifically, the loan will finance construction on Block 6, which will be a dynamic blend of the business world and urban living. Block 6 Office, a seven-story office building will complement a six-story residential structure, Block 6 Residential, with 63 luxury apartment homes. The street level of both buildings will showcase the Shops at Waterfront Way complex of retail and restaurant space.<\/p>\n<p>\u201cGramor is a driving force in revitalizing Vancouver\u2019s waterfront and the local community,\u201d said Ann Young, senior vice president, Oregon market manager of U.S. Bank. \u201cU.S. Bank is excited to be part of the project and to help bring this vibrant and unique development to life.\u201d<\/p>\n<p>With a total of $250 million in construction underway on phase 1, the 32-acre, $1.5 billion <a href=\"http:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=http%3A%2F%2Fthewaterfrontvancouverusa.com%2F&amp;esheet=51571424&amp;newsitemid=20170607006392&amp;lan=en-US&amp;anchor=The+Waterfront+Vancouver+development&amp;index=2&amp;md5=64d6285041a1444fa83d6971ecf2551f\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">The Waterfront Vancouver development<\/a> is full steam ahead and shows no signs of slowing down. Tenants already signed on for the project include M.J. Murdock Charitable Trust at Block 6 Office, and Cascade Sotheby\u2019s International Realty and MidiCi The Neapolitan Pizza Company at Block 6 Residential. Located near the Grant Street Pier \u2013 a 90-foot-long cable-stay pier suspended above the water \u2013 is Block 9 with WildFin American Grill, and Twigs Bistro and Martini Bar and Ghost Runners Brewery at Block 12, offering restaurant patrons a breathtaking view of the Columbia River. You can view The Waterfront Vancouver master plan <a href=\"http:\/\/cts.businesswire.com\/ct\/CT?id=smartlink&amp;url=http%3A%2F%2Fthewaterfrontvancouverusa.com%2Fabout%2Fmaster-plan%2F&amp;esheet=51571424&amp;newsitemid=20170607006392&amp;lan=en-US&amp;anchor=here&amp;index=3&amp;md5=5eb94729344a1eb5ed2b527e89eea310\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">here<\/a>.<\/p>\n<p class=\"bwalignl\">An additional tower of 197 luxury apartments is currently being built at Block 8 and Block 4 will house 120 hotel rooms for the Hotel Indigo in addition to 40 luxury condominium homes. A focal point of The Waterfront development includes a picturesque new half-mile-long park along the river and Headwaters Wall, an interactive water feature that will take visitors on an entertaining and historical journey of those who have traveled the rivers that lead into the Columbia River.<\/p>\n<p><b>About Gramor Development, Inc.<\/b><\/p>\n<p>Gramor Development specializes in retail and mixed-use developments that are uniquely suited to the surrounding community. Since 1985, Gramor Development has brought to life developments that showcase thoughtful design, high-quality construction and a sense of place. Gramor Development has completed more than 65 developments, valued at nearly $1 billion, throughout the metropolitan Portland and Vancouver areas. Projects include the forthcoming The Waterfront Vancouver, a $1.5 billion development spanning 20 city blocks and 32 acres in Vancouver, Wash., and Lake View Village, a mixed-use project that transformed the downtown area of Lake Oswego, Ore., into a beautiful destination adjacent to a city park. The privately held company, led by president Barry Cain, is headquartered in Tualatin, Ore.<br \/>\n<b>Contacts<\/b><\/p>\n<p>For Gramor Development<br \/>\nMolly Ishkanian, 503-277-8370<br \/>\n<a href=\"mailto:Molly@R-West.com\" target=\"_blank\" rel=\"noopener noreferrer\">Molly@R-West.com<\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>This loan will support the construction of Block 6 to bring a vibrant mix of the business world and urban living to The Waterfront Vancouver TUALATIN, Ore.&#8211;(BUSINESS WIRE)&#8211;Gramor Development, Inc. announced today that it has closed on a construction loan totaling $42.5 million with U.S. Bank for The Waterfront Vancouver development on the Columbia River&hellip; <a class=\"more-link\" href=\"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/\">Continue reading <span class=\"screen-reader-text\">Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank<\/span><\/a><\/p>\n","protected":false},"author":1838,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[],"class_list":["post-36908","post","type-post","status-publish","format-standard","hentry","category-news","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"This loan will support the construction of Block 6 to bring a vibrant mix of the business world and urban living to The Waterfront Vancouver TUALATIN, Ore.&#8211;(BUSINESS WIRE)&#8211;Gramor Development, Inc. announced today that it has closed on a construction loan totaling $42.5 million with U.S. Bank for The Waterfront Vancouver development on the Columbia River&hellip; Continue reading Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2017-06-07T21:02:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-06-12T19:42:33+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591493\/21\/The_Waterfront_May_2017.jpg\" \/>\n<meta name=\"author\" content=\"Business Wire\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Business Wire\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/\"},\"author\":{\"name\":\"Business Wire\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/9a101ea51ef21935584d7dfebbe24056\"},\"headline\":\"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank\",\"datePublished\":\"2017-06-07T21:02:00+00:00\",\"dateModified\":\"2017-06-12T19:42:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/\"},\"wordCount\":570,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/mms.businesswire.com\\\/media\\\/20170607006392\\\/en\\\/591493\\\/21\\\/The_Waterfront_May_2017.jpg\",\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/\",\"name\":\"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/#primaryimage\"},\"thumbnailUrl\":\"http:\\\/\\\/mms.businesswire.com\\\/media\\\/20170607006392\\\/en\\\/591493\\\/21\\\/The_Waterfront_May_2017.jpg\",\"datePublished\":\"2017-06-07T21:02:00+00:00\",\"dateModified\":\"2017-06-12T19:42:33+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/#primaryimage\",\"url\":\"http:\\\/\\\/mms.businesswire.com\\\/media\\\/20170607006392\\\/en\\\/591493\\\/21\\\/The_Waterfront_May_2017.jpg\",\"contentUrl\":\"http:\\\/\\\/mms.businesswire.com\\\/media\\\/20170607006392\\\/en\\\/591493\\\/21\\\/The_Waterfront_May_2017.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/9a101ea51ef21935584d7dfebbe24056\",\"name\":\"Business Wire\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b1e29f350159557641beed11eb92bbd0bff7902366ac06288292e398da1d43?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b1e29f350159557641beed11eb92bbd0bff7902366ac06288292e398da1d43?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/40b1e29f350159557641beed11eb92bbd0bff7902366ac06288292e398da1d43?s=96&d=mm&r=g\",\"caption\":\"Business Wire\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/business-wire\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/","og_locale":"en_US","og_type":"article","og_title":"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank - The Construction Specifier","og_description":"This loan will support the construction of Block 6 to bring a vibrant mix of the business world and urban living to The Waterfront Vancouver TUALATIN, Ore.&#8211;(BUSINESS WIRE)&#8211;Gramor Development, Inc. announced today that it has closed on a construction loan totaling $42.5 million with U.S. Bank for The Waterfront Vancouver development on the Columbia River&hellip; Continue reading Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank","og_url":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/","og_site_name":"The Construction Specifier","article_published_time":"2017-06-07T21:02:00+00:00","article_modified_time":"2017-06-12T19:42:33+00:00","og_image":[{"url":"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591493\/21\/The_Waterfront_May_2017.jpg","type":"","width":"","height":""}],"author":"Business Wire","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Business Wire","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/"},"author":{"name":"Business Wire","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/9a101ea51ef21935584d7dfebbe24056"},"headline":"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank","datePublished":"2017-06-07T21:02:00+00:00","dateModified":"2017-06-12T19:42:33+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/"},"wordCount":570,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/#primaryimage"},"thumbnailUrl":"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591493\/21\/The_Waterfront_May_2017.jpg","articleSection":["News"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/","url":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/","name":"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/#primaryimage"},"thumbnailUrl":"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591493\/21\/The_Waterfront_May_2017.jpg","datePublished":"2017-06-07T21:02:00+00:00","dateModified":"2017-06-12T19:42:33+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/#primaryimage","url":"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591493\/21\/The_Waterfront_May_2017.jpg","contentUrl":"http:\/\/mms.businesswire.com\/media\/20170607006392\/en\/591493\/21\/The_Waterfront_May_2017.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/gramor-development-inc-secures-42-5-million-construction-loan-for-block-6-at-the-waterfront-vancouver-project-through-u-s-bank\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Gramor Development, Inc. Secures $42.5 Million Construction Loan for Block 6 at The Waterfront Vancouver Project Through U.S. Bank"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/9a101ea51ef21935584d7dfebbe24056","name":"Business Wire","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/40b1e29f350159557641beed11eb92bbd0bff7902366ac06288292e398da1d43?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/40b1e29f350159557641beed11eb92bbd0bff7902366ac06288292e398da1d43?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/40b1e29f350159557641beed11eb92bbd0bff7902366ac06288292e398da1d43?s=96&d=mm&r=g","caption":"Business Wire"},"url":"https:\/\/www.constructionspecifier.com\/author\/business-wire\/"}]}},"views":2807,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/36908","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/1838"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=36908"}],"version-history":[{"count":2,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/36908\/revisions"}],"predecessor-version":[{"id":37268,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/36908\/revisions\/37268"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=36908"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=36908"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=36908"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}