{"id":3852,"date":"2014-05-29T15:19:35","date_gmt":"2014-05-29T19:19:35","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=3852"},"modified":"2017-01-13T15:51:38","modified_gmt":"2017-01-13T20:51:38","slug":"getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/","title":{"rendered":"Getting it Right the First Time: Addressing heat and light problems with glazing"},"content":{"rendered":"<figure id=\"attachment_3859\" aria-describedby=\"caption-attachment-3859\" style=\"width: 312px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3859\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography-1000x783.jpg\" alt=\"Photo courtesy Sage Electrochromics. Photo \u00a9 Jeffrey Totaro Photography\" width=\"312\" height=\"244\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography-1000x783.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography-300x235.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography-624x489.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg 2048w\" sizes=\"auto, (max-width: 312px) 100vw, 312px\" \/><\/a><figcaption id=\"caption-attachment-3859\" class=\"wp-caption-text\"><em>Photo courtesy Sage Electrochromics. Photo \u00a9 Jeffrey Totaro Photography<\/em><\/figcaption><\/figure>\n<p><strong>by Helen Sanders, PhD<br \/>\n<\/strong>Design teams and glazing contractors are often called in to help solve problems when building owners find there is too much light and\/or heat coming in, making interior spaces practically unusable. This author has encountered examples where the sun\u2019s glare is so unbearable in an office building employees were issued sunglasses, and have even covered windows with cardboard.<\/p>\n<p><a name=\"note8\"><\/a>Electronically tintable, or electrochromic (EC) glass, is a category of dynamic glazing that allows occupants to control the indoor environment by changing the visible light transmission (VLT) and solar heat gain properties of the glass. EC glass can be controlled automatically in response to an external environmental signal (<em>i.e.<\/em> light, heat, or occupancy) or through integration into a building management system all with manual override capability. Electronically tintable glass has been increasingly adopted as an efficient all-in-one sun management system that provides a view to the outside.<a href=\"#note1\"><sup>1<\/sup><\/a><\/p>\n<figure id=\"attachment_3853\" aria-describedby=\"caption-attachment-3853\" style=\"width: 324px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-23.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3853\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-23.jpg\" alt=\"Dynamic glass modulates its solar heat gain coefficient (SHGC) and visible light transmission over a wide range, stopping at points in between to provide optimal solar and glare control. Photo courtesy Sage Electrochromics \" width=\"324\" height=\"242\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-23.jpg 545w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-23-300x224.jpg 300w\" sizes=\"auto, (max-width: 324px) 100vw, 324px\" \/><\/a><figcaption id=\"caption-attachment-3853\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Dynamic glass modulates its solar heat gain coefficient (SHGC) and visible light transmission over a wide range, stopping at points in between to provide optimal solar and glare control.<\/span> <em>Photo courtesy Sage Electrochromics<\/em><\/figcaption><\/figure>\n<p>Many of the commercial projects where dynamic glass is incorporated are \u2018fix-its,\u2019 where the existing glass has been replaced with dynamic glazing to make the space work for its intended use. It is not that the existing glass had poor performance\u2014quite the contrary: in some cases, the glass replaced had excellent solar control coatings. Rather, the issue is really the original design concept did not combine the glazing with other elements to adequately address the sun management challenge the exterior environment presents. Perhaps there was too much glass on east and west orientations that caused over-heating, or insufficient consideration of glare control.<\/p>\n<p class=\" wp-image-3853\">For many applications, dynamic methods for solar control and glare control are needed for optimal energy performance and occupant comfort. Dynamic solar control can be achieved conventionally with mechanical movable louver systems or Venetian blinds integrated into double-skin walls. These systems are commonly used in Europe.<\/p>\n<p><a name=\"note9\"><\/a>Alternatively, electronically tintable glass (<em>i.e.<\/em> electrochromic) can be used to provide both automatic glare and variable solar control. EC glass can, at the touch of a button or command from an automated system, modulate its solar heat gain coefficient (SHGC) from 0.41 to 0.09 and visible light transmission (VLT) from 60 to one percent<a href=\"#note2\"><sup>2<\/sup><\/a><a name=\"note9\"><\/a> over a wide range and stopping at points in between (Figure 1).<\/p>\n<p>By achieving a visible light transmission as low as one percent in the tinted state, EC glass provides the ability to block uncomfortable glare while maintaining the view to the outside, unlike the mechanical alternatives which block or obstruct the view. By dynamically controlling the light and heat flow into the building, significantly more energy savings can be captured than when using a static glazed fa\u00e7ade solution. Further, occupant comfort is enhanced while maintaining exterior views.<\/p>\n<p><strong>Kimmel Center for the Performing Arts<\/strong><br \/>\nThe renowned Kimmel Center for the Performing Arts in Philadelphia was designed in 2001 by Raphael Vi\u00f1oly. It is an architectural icon with a vast barrel-vaulted, fully glazed roof housing multiple concert halls, theatres, and large public spaces. However, the Dorrance H. Hamilton rooftop garden\u2014originally designed as a rentable space for private functions with panoramic views of the arts center and the surrounding city\u2014was almost uninhabitable from May to September with temperatures reaching 48 C (120 F). The center\u2019s management had to turn away over a thousand inquiries annually for renting the space.<\/p>\n<p><a name=\"note10\"><\/a>In a renovation designed by BLT Architects completed in 2012, the rooftop garden has been enclosed in a glass box structure. The design employs dynamic glass in the roof to maintain the views of the center\u2019s vaulted dome, the city, and public spaces, while maintaining a comfortable year-round temperature (Figure 2).<a href=\"#note3\"><sup>3<\/sup><\/a><\/p>\n<p><figure id=\"attachment_3854\" aria-describedby=\"caption-attachment-3854\" style=\"width: 271px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-24.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3854\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-24.jpg\" alt=\"The renovation of the Dorrance H Hamilton Roof Garden at Philadelphia\u2019s Kimmel Center for the Performing Arts used electronically tintable dynamic glazing to provide temperature control, while maintaining full views to the barrel vaulted glass roof. [CREDIT] Photo courtesy Sage Electrochromics. Photo \u00a9 Jeffrey Totaro Photography \" width=\"271\" height=\"389\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-24.jpg 386w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-24-208x300.jpg 208w\" sizes=\"auto, (max-width: 271px) 100vw, 271px\" \/><\/a><figcaption id=\"caption-attachment-3854\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">The renovation of the Dorrance H Hamilton Roof Garden at Philadelphia\u2019s Kimmel Center for the Performing Arts used electronically tintable dynamic glazing to provide temperature control, while maintaining full views to the barrel vaulted glass roof.<\/span> <em>Photo courtesy Sage Electrochromics. Photo \u00a9 Jeffrey Totaro Photography<\/em><\/figcaption><\/figure><figure id=\"attachment_3855\" aria-describedby=\"caption-attachment-3855\" style=\"width: 325px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-24-2.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3855\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-24-2.jpg\" alt=\"Dehority Hall at Ball State University in Muncie, Indiana, features electronically tintable dynamic glazing, which solved a heat and glare control problem in an existing skylight to deliver the original design intent of a comfortable, well-lit, multi-purpose space. [CREDIT] Photo courtesy Sage Electrochromics. Photo \u00a9 Susan Fleck Photography \" width=\"325\" height=\"393\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-24-2.jpg 618w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/CS_June_2014_HR-24-2-248x300.jpg 248w\" sizes=\"auto, (max-width: 325px) 100vw, 325px\" \/><\/a><figcaption id=\"caption-attachment-3855\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Dehority Hall at Ball State University in Muncie, Indiana, features electronically tintable dynamic glazing, which solved a heat and glare control problem in an existing skylight to deliver the original design intent of a comfortable, well-lit, multi-purpose space. <\/span><em>Photo courtesy Sage Electrochromics. Photo \u00a9 Susan Fleck Photography<\/em><\/figcaption><\/figure>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p><strong class=\" wp-image-3854\">Ball State University<\/strong><br \/>\nBall State University in Indiana (Figure 3) encountered a similar issue with a skylight. A three-sided courtyard in an honors dormitory had been enclosed to create a multi-purpose interior space. To maintain the open feel of the original courtyard, a fully glazed roof was designed. Even though a high-performance, low-emissivity (low-e) coated glass with a 50 percent frit pattern was used, the university realized within three months of the December installation the space was not working. It was too hot and there was too much glare, even during the winter.<\/p>\n<p>Figuring out how to shade a skylight using mechanical shade or blind systems can be challenging and expensive. In fact, the mechanical solutions investigated were more costly than the automated dynamic glass solution which the university implemented only a year after the initial installation. The result was a comfortable space that was open, yet versatile, allowing movies and presentations to be viewed during daylight hours.<\/p>\n<p><strong>Sun management<\/strong><br \/>\nGenerally, if the original design has not been well planned in terms of addressing the sun management issue, it is hard to come back retrospectively to \u2018fix it\u2019 in an elegant way using mechanical solutions that complement the original design intent. Adding sunshades to an existing fenestration system can be challenging, especially when the existing structure is not specified for the additional load.<\/p>\n<p>Sunshades can be effective if included in the design of a new building when used on the south elevation and of an appropriate depth. Often, sunshades can be cut as part of a value engineering exercise and end up being two shallow, causing little or no shade on the window, or removed completely. Also, it is important to appreciate because of the low-angle sun incident on east and west elevations, sunshades are less effective at providing solar control from shading on those orientations.<\/p>\n<p class=\" wp-image-3855\">The compromise solution is frequently to add interior shades or blinds, but this can be a difficult proposition for overhead or sloped glazing where gravity is working against the designer and can cause ongoing maintenance headaches. While this solution can reduce the glare issues, it may not solve the overall heat gain problem, since the heat is already in the building, and the view to the outside is obscured.<\/p>\n<p><figure id=\"attachment_3863\" aria-describedby=\"caption-attachment-3863\" style=\"width: 331px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Grove-City_Ext.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3863\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Grove-City_Ext-1000x665.jpg\" alt=\"STEM Hall at Grove City College installed electronically tintable dynamic glass into the building\u2019s east-facing, two-story atrium to preserve the view of the campus grounds and let in natural light, while minimizing the glare and heat of the morning sun. [CREDIT] Photo courtesy Sage Electrochromics. Photo \u00a9Montana Pritchard Photography \" width=\"331\" height=\"220\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Grove-City_Ext-1000x665.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Grove-City_Ext-300x199.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Grove-City_Ext-624x414.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Grove-City_Ext.jpg 2048w\" sizes=\"auto, (max-width: 331px) 100vw, 331px\" \/><\/a><figcaption id=\"caption-attachment-3863\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">STEM Hall at Grove City College installed electronically tintable dynamic glass into the building\u2019s east-facing, two-story atrium to preserve the view of the campus grounds and let in natural light, while minimizing the glare and heat of the morning sun.<\/span> <em>Photo courtesy Sage Electrochromics. Photo \u00a9Montana Pritchard Photography<\/em><\/figcaption><\/figure>Dynamic glazing can also provide the glazing contractor with a retrofit solution to simply solve their customers\u2019 heat and light control problems in any climate. If strict privacy is a concern then additional opaque blinds or shades are commended as dynamic glass, while providing some level of privacy to occupants during the day does not offer strict privacy, especially at night.<\/p>\n<p><a name=\"note11\"><\/a>Buildings with access to natural daylight and views to the outside are desirable because of the positive impact on the health and well-being of occupants, as well as the ability to save energy by turning off electric lights. The access to natural daylight entrains the body\u2019s circadian rhythms, which are critical for the regulating health, attention, and mood\u2014many studies have shown the link between lack of daylight and illhealth.<a href=\"#note4\"><sup>4<\/sup><\/a><a name=\"note11\"><\/a> Deborah Burnett, a presenter at a daylight symposium last year stated, \u201cdaylight is a drug and nature is the prescribing physician.\u201d<a href=\"#note5\"><sup>5 <\/sup><\/a><a name=\"note11\"><\/a>Sustainable design standards and programs\u2014such as Leadership in Energy and Environmental Design (LEED), <em>International Green Construction Code<\/em> (<em>IgCC<\/em>), and American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE) 189.1, <em>Standard for the Design of <a name=\"note12\"><\/a>High-performance Green Buildings Except Low-rise Residential Buildings<\/em>\u2014all appreciate both high-energy performance and providing a well-lit space with views to the outside.<\/p>\n<p>However, designing with glass and not considering the negative effects of the sun can result in sub-optimal building environments that cause occupants to be uncomfortable and less productive. Moreover, such buildings can give use of glass in buildings a bad name and perpetuate the view that reducing glass in buildings is an appropriate solution and one to be encouraged in building codes.<\/p>\n<p>This has been illustrated most recently when an addendum that would have reduced the allowable window-to-wall ratio in the prescriptive path from 40 to 30 percent was considered for ASHRAE 189.1. Due to numerous comments from many industry sectors, including the daylighting design community and academia, the proposal was withdrawn. However, the discussion is not yet put to bed. The optimization of energy performance, daylight and view, and providing occupant thermal and visual comfort is one of the most significant challenges for high-performance sustainable buildings. Determining how to codify such solutions in building codes and standards is also a challenge. A focus on addressing the three-way optimization may really only begin once as-built performance of buildings is measured not just for energy consumption, but also occupant comfort.<\/p>\n<p><figure id=\"attachment_3856\" aria-describedby=\"caption-attachment-3856\" style=\"width: 625px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Exterior_PhilDaubmanPhotography.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-large wp-image-3856\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Exterior_PhilDaubmanPhotography-1000x429.jpg\" alt=\"A new wellness facility at Butler County Health Care Center in David City, New England, incorporated electronically tintable dynamic glazing in a curved, 278-m2 (3000-sf) curtain wall providing patients, members, and staff with a comfortable healing environment and an unobstructed view to the outdoors. [CREDIT] Photo courtesy Sage Electrochromics. Photo \u00a9Phil Daubman Photography \" width=\"625\" height=\"268\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Exterior_PhilDaubmanPhotography-1000x429.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Exterior_PhilDaubmanPhotography-300x128.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Exterior_PhilDaubmanPhotography-624x267.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Exterior_PhilDaubmanPhotography.jpg 2048w\" sizes=\"auto, (max-width: 625px) 100vw, 625px\" \/><\/a><figcaption id=\"caption-attachment-3856\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">A new wellness facility at Butler County Health Care Center in David City, New England, incorporated electronically tintable dynamic glazing in a curved, 278-m<sup>2<\/sup> (3000-sf) curtain wall providing patients, members, and staff with a comfortable healing environment and an unobstructed view to the outdoors.<\/span> <em>Photo courtesy Sage Electrochromics. Photo \u00a9Phil Daubman Photography<\/em><\/figcaption><\/figure><strong>Planning ahead<\/strong><br \/>\nGlass can be a significant contribution in buildings from both an energy and occupant perspective; however, buildings need to be designed well the first time. From a national perspective, it is strategically important to improve the built environment\u2019s quality.<\/p>\n<p>Part of \u2018getting it right the first time\u2019 involves understanding how the envelope will interact with the exterior environment throughout the day and from season to season, along with having the tools and products for use in the fa\u00e7ade to deal with the dynamic nature of the environment. Some design strategies work well for more southern climates (such as static overhangs) where the sun is intense and the angle does not change as much during the year. However, these strategies may not work as well in northern climates where access to light in the winter is desired, yet the sun angles are sufficiently low to cause glare issues.<\/p>\n<p>There are design tools available that can help determine if perimeter spaces will work prior to building them. For example, the free software tool, DAYSIM, is a daylight simulation tool designed to model the amount of daylight coming into a perimeter space as a function of time of day over the course of a year. It is based on the Radiance software developed by Lawrence Berkeley National Laboratory (LBNL).<\/p>\n<p class=\" wp-image-3863\">By using this tool, designers can easily see if there will be too much glare in a space and experiment with methods of eliminating the problem before the building is constructed. The software can handle both mechanical shades and blinds as well as dynamic glazing and can be helpful in determining if designs have a light control problem before construction.<strong><br \/>\n<\/strong><\/p>\n<p><strong>Integrated design for daylighting<\/strong><br \/>\nAnother important part of a successful initial design is using an integrated approach wherein the daylighting, lighting, and interior design are done in conjunction with envelope design. This provides a holistic approach to optimizing use of daylight, offsetting electric lighting to save energy, and controlling for glare and unwanted heat gain. It also prevents the common occurrence of the envelope being specified and built before the daylighting designer is brought in, by which time he or she has lost most degrees of freedom. Further, because the interior and daylighting designers are involved early, it prevents opaque private offices or 1.8-m (6-ft) cube heights being specified around the perimeter\u2014these negate the benefits of an otherwise good perimeter daylighting design.<\/p>\n<p><figure id=\"attachment_3864\" aria-describedby=\"caption-attachment-3864\" style=\"width: 288px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/gsa_atrium_tint_079.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3864\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/gsa_atrium_tint_079-666x1000.jpg\" alt=\"The renovation of the General Services Administration (GSA) headquarters included a seven-story atrium built atop a formerly open-air courtyard. Electronically tintable dynamic glass was chosen for the atrium\u2019s skylight to provide a comfortable environment for occupants, reduce energy usage, and demonstrate how green technologies are being incorporated into renovated buildings. [CREDIT] Photo courtesy Sage Electrochromics. Photo \u00a9Montana Pritchard Photography \" width=\"288\" height=\"433\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/gsa_atrium_tint_079-666x1000.jpg 666w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/gsa_atrium_tint_079-199x300.jpg 199w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/gsa_atrium_tint_079-624x936.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/gsa_atrium_tint_079.jpg 680w\" sizes=\"auto, (max-width: 288px) 100vw, 288px\" \/><\/a><figcaption id=\"caption-attachment-3864\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">The renovation of the General Services Administration (GSA) headquarters included a seven-story atrium built atop a formerly open-air courtyard. Electronically tintable dynamic glass was chosen for the atrium\u2019s skylight to provide a comfortable environment for occupants, reduce energy usage, and demonstrate how green technologies are being incorporated into renovated buildings.<\/span><br \/><em>Photo courtesy Sage Electrochromics. Photo \u00a9Montana Pritchard Photography<\/em><\/figcaption><\/figure>The integrated design approach, in which climate-based daylight modeling tools have also been used, is great for glass because it directs the designer to use appropriate amounts of fenestration in the right locations. By proactively implementing solutions that deal with the negative effects of the sun, such as dynamic methods for glare and solar control, designs can be created that both work for occupants and are energy efficient. By coupling the fa\u00e7ade design with dimmable lighting controls, daylight is effectively harvested to offset electrical lighting. This has a significant impact on the energy performance of a building, especially one with a good daylighting design in which sunlight penetration to the interior is maximized.<\/p>\n<p class=\" wp-image-3864\">Electric lighting accounts for approximately 38 percent of total building electricity use. Up to 80 percent of this electrical energy ends up as heat generated by <a name=\"note13\"><\/a>lights, which then has to be removed by the air-conditioning system.<a href=\"#note6\"><sup>6<\/sup><\/a><a name=\"note13\"><\/a> In fact, the impact of reducing electrical lighting consumption by using daylight in commercial buildings is far bigger than the energy impact of changing the solar heat gain coefficient and U-factor of the fenestration by a few points.<\/p>\n<p><strong class=\" wp-image-3864\">Conclusion<\/strong><br \/>\n<a name=\"note14\"><\/a>Contrary to popular belief, a building with no windows is actually not the most energy-efficient structure. Glazed buildings employing high-performance fenestration, with appropriate considerations for solar control, good daylighting designs with a dynamic response for glare, and automated dimmable lighting systems can be more energy-efficient because of the saving in electrical lighting energy.<a href=\"#note7\"><sup>7<\/sup><\/a><\/p>\n<p>The benefits to occupants in buildings with natural daylight and views to the outside should not be overlooked. After all, this is the reason windows are installed in the first place. An integrated design approach, employing daylight modeling and high-performance fa\u00e7ade solutions can play an important part in \u2018getting it right the first time,\u2019 making even highly glazed buildings both energy-efficient and comfortable for occupants. By demonstrating mastery of the high-performance building challenge, the continued use of glass in buildings can be promoted. It helps make the case for not reducing the maximum allowable amount of glazing in the energy codes.<\/p>\n<p><strong>Notes<\/strong><br \/>\n<a name=\"note1\"><\/a><sup>1<\/sup> For more, see the white paper by D. Malmquist and N. Sbar\u2019s, <em>The Benefits of Dynamic Glazing<\/em>. Visit <a href=\"http:\/\/sageglass.com\/wp-content\/uploads\/2013\/08\/SAGE-benefits_of_dynamic_glazing.pdf\">sageglass.com\/wp-content\/uploads\/2013\/08\/SAGE-benefits_of_dynamic_glazing.pdf<\/a>. (back to <a href=\"#note8\">top<\/a>)<br \/>\n<a name=\"note2\"><\/a><sup>2<\/sup> Visit <a href=\"http:\/\/sageglass.com\/sageglass\/sageglass-product\">sageglass.com\/sageglass\/sageglass-product<\/a>. (back to <a href=\"#note9\">top<\/a>)<br \/>\n<a name=\"note3\"><\/a><sup>3<\/sup> Visit <a href=\"http:\/\/pennsylvania.broadwayworld.com\/article\/Kimmel-Center-Completes-Dorrance-H-Hamilton-Rooftop-Garden-Renovation-20120831\">pennsylvania.broadwayworld.com\/article\/Kimmel-Center-Completes-Dorrance-H-Hamilton-Rooftop-Garden-Renovation-20120831<\/a>. (back to <a href=\"#note10\">top<\/a>)<br \/>\n<a name=\"note4\"><\/a><sup>4<\/sup> For more, see Kathy Velikov and Julie Janiski\u2019s \u201cThe Benefits of Glass: A Literature Review on the Qualitative Benefits of Glass on Building Occupants\u201d at <a href=\"http:\/\/na.en.sunguardglass.com\/cs\/groups\/sunguard\/documents\/native\/pro_045179.pdf\">na.en.sunguardglass.com\/cs\/groups\/sunguard\/documents\/native\/pro_045179.pdf<\/a>. (back to <a href=\"#note11\">top<\/a>)<br \/>\n<a name=\"note5\"><\/a><sup>5 <\/sup>See Deborah Burnett\u2019s presentation, \u201cKnowledge to practice\u2014Epigenetics design and the built environment,\u201dfrom the May 2013 Velux Daylighting Symposium in Copenhagen. (back to <a href=\"#note12\">top<\/a>)<br \/>\n<a name=\"note6\"><\/a><sup>6 <\/sup>See the 2003 U.S. Department of Energy (DOE), Energy Information Administration\u2019s (EIA\u2019s) \u201cCommercial Building Energy Consumption Survey.\u201d (back to <a href=\"#note13\">top<\/a>)<br \/>\n<a name=\"note7\"><\/a><sup>7 <\/sup>See D. Arasteh, S. Selkowitz, J. Apte, and M. LaFrance\u2019s Zero Energy Windows, Proceedings of the 2006 ACEEE Summer Study on Energy Efficiency in Buildings, August 13 to 18, 2006. LBNL report number 60049. (back to <a href=\"#note14\">top<\/a>)<\/p>\n<p><em>Helen Sanders, PhD, is the vice president of technical business development at Sage Electrochromics. She has 17 years of experience in the glass industry, and more than a decade in dynamic glass technology and manufacturing. She is an active member of ASTM, Insulating Glass Manufacturers Association (IGMA), and Glass Association of North America (GANA). Sanders earned her master\u2019s degree in natural sciences and a PhD in surface science from the University of Cambridge. She can be contacted by e-mail at <a href=\"mailto:%20helen.sanders@sageglass.com\">helen.sanders@sageglass.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Customers often call design teams regarding problems concerning too much light and\/or too much heat coming into a building and making the space practically unusable. The issue is the original design concept did not combine the glazing with other design elements to adequately address the sun management challenge.<\/p>\n","protected":false},"author":4,"featured_media":3859,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,188,279,501,462,468],"tags":[925,926,927,65,928,929,930,931,932],"class_list":["post-3852","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-08-00-00-openings","category-08-80-00-glazing","category-c1020interior-windows","category-c10interior-construction","category-d50electrical","tag-26-09-23-lighting-control-devices","tag-c1020-90-glazing-interior-windows","tag-d5040-10-lighting-control-devices","tag-daylighting","tag-electrochromic","tag-electronically-tintable","tag-integrated-design","tag-shgc","tag-visible-light-transmission","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Getting it Right the First Time: Addressing heat and light problems with glazing - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Getting it Right the First Time: Addressing heat and light problems with glazing - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Customers often call design teams regarding problems concerning too much light and\/or too much heat coming into a building and making the space practically unusable. The issue is the original design concept did not combine the glazing with other design elements to adequately address the sun management challenge.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2014-05-29T19:19:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-13T20:51:38+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1605\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Molly Doyle\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Molly Doyle\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"14 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/\"},\"author\":{\"name\":\"Molly Doyle\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\"},\"headline\":\"Getting it Right the First Time: Addressing heat and light problems with glazing\",\"datePublished\":\"2014-05-29T19:19:35+00:00\",\"dateModified\":\"2017-01-13T20:51:38+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/\"},\"wordCount\":2727,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg\",\"keywords\":[\"26 09 23\u2013Lighting Control Devices\",\"C1020.90\u2013Glazing Interior-Windows\",\"D5040.10\u2013Lighting Control Devices\",\"daylighting\",\"Electrochromic\",\"Electronically tintable\",\"Integrated design\",\"SHGC\",\"Visible light transmission\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"08 00 00 Openings\",\"08 80 00 Glazing\",\"C1020\u2212Interior Windows\",\"C10\u2212Interior Construction\",\"D50?Electrical\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/\",\"name\":\"Getting it Right the First Time: Addressing heat and light problems with glazing - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg\",\"datePublished\":\"2014-05-29T19:19:35+00:00\",\"dateModified\":\"2017-01-13T20:51:38+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg\",\"width\":2048,\"height\":1605,\"caption\":\"Photo courtesy Sage Electrochromics. Photo \u00a9 Jeffrey Totaro Photography\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Getting it Right the First Time: Addressing heat and light problems with glazing\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\",\"name\":\"Molly Doyle\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"caption\":\"Molly Doyle\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/molly\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Getting it Right the First Time: Addressing heat and light problems with glazing - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/","og_locale":"en_US","og_type":"article","og_title":"Getting it Right the First Time: Addressing heat and light problems with glazing - The Construction Specifier","og_description":"Customers often call design teams regarding problems concerning too much light and\/or too much heat coming into a building and making the space practically unusable. The issue is the original design concept did not combine the glazing with other design elements to adequately address the sun management challenge.","og_url":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/","og_site_name":"The Construction Specifier","article_published_time":"2014-05-29T19:19:35+00:00","article_modified_time":"2017-01-13T20:51:38+00:00","og_image":[{"width":2048,"height":1605,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg","type":"image\/jpeg"}],"author":"Molly Doyle","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Molly Doyle","Est. reading time":"14 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/"},"author":{"name":"Molly Doyle","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294"},"headline":"Getting it Right the First Time: Addressing heat and light problems with glazing","datePublished":"2014-05-29T19:19:35+00:00","dateModified":"2017-01-13T20:51:38+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/"},"wordCount":2727,"commentCount":1,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg","keywords":["26 09 23\u2013Lighting Control Devices","C1020.90\u2013Glazing Interior-Windows","D5040.10\u2013Lighting Control Devices","daylighting","Electrochromic","Electronically tintable","Integrated design","SHGC","Visible light transmission"],"articleSection":["Features","MasterFormat","UniFormat","08 00 00 Openings","08 80 00 Glazing","C1020\u2212Interior Windows","C10\u2212Interior Construction","D50?Electrical"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/","url":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/","name":"Getting it Right the First Time: Addressing heat and light problems with glazing - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg","datePublished":"2014-05-29T19:19:35+00:00","dateModified":"2017-01-13T20:51:38+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Figure-2_Kimmel-Center-for-the-Performing-Arts-Copyright-Jeffery-Totaro-Photography.jpg","width":2048,"height":1605,"caption":"Photo courtesy Sage Electrochromics. Photo \u00a9 Jeffrey Totaro Photography"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/getting-it-right-the-first-time-addressing-heat-and-light-problems-with-glazing\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Getting it Right the First Time: Addressing heat and light problems with glazing"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294","name":"Molly Doyle","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","caption":"Molly Doyle"},"url":"https:\/\/www.constructionspecifier.com\/author\/molly\/"}]}},"views":7505,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/3852","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=3852"}],"version-history":[{"count":15,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/3852\/revisions"}],"predecessor-version":[{"id":25065,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/3852\/revisions\/25065"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/3859"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=3852"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=3852"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=3852"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}