{"id":3918,"date":"2014-05-30T09:29:45","date_gmt":"2014-05-30T13:29:45","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=3918"},"modified":"2017-01-13T15:43:25","modified_gmt":"2017-01-13T20:43:25","slug":"designing-masonry-buildings-to-the-2012-energy-code","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/","title":{"rendered":"Designing masonry buildings to the 2012 Energy Code"},"content":{"rendered":"<figure id=\"attachment_3924\" aria-describedby=\"caption-attachment-3924\" style=\"width: 368px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3924\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires-1000x522.jpg\" alt=\"All images courtesy Mortar Net Solutions\" width=\"368\" height=\"192\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires-1000x522.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires-300x156.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires-624x326.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires.jpg 2048w\" sizes=\"auto, (max-width: 368px) 100vw, 368px\" \/><\/a><figcaption id=\"caption-attachment-3924\" class=\"wp-caption-text\"><em>All images courtesy Mortar Net Solutions<\/em><\/figcaption><\/figure>\n<p><strong>by Steven Fechino<br \/>\n<\/strong>The 2012 <em>International Energy Conservation Code<\/em> (<em>IECC<\/em>) will bring tremendous change to the way buildings are designed, constructed, and renovated. Several of the code\u2019s changes have already been implemented throughout the industry, with many of the currently specified systems and products meeting these new codes. However, there are also materials and assemblies that will need to evolve to remain compliant.<\/p>\n<p>For instance, HVAC systems will require improvements to the mechanical systems and ductwork. Window glazing is becoming more energy-efficient to meet ever-tightening performance criteria. Further, there is this author\u2019s focus\u2014the insulation requirements for masonry construction have been written to higher performance levels. There are many rumors about how the changes will limit the available products with which masonry structures can be built and designed. This article will address some of those rumors by providing simple explanations of the code and some helpful insight into how the industry is dealing with the changes on a positive level.<\/p>\n<figure id=\"attachment_3919\" aria-describedby=\"caption-attachment-3919\" style=\"width: 361px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Cavity-Wall-image.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3919\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Cavity-Wall-image-1000x634.jpg\" alt=\"This diagram shows the elements of a cavity wall This particular assembly includes an insect barrier and mortar-dropping-collection device. \" width=\"361\" height=\"229\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Cavity-Wall-image-1000x634.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Cavity-Wall-image-300x190.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Cavity-Wall-image-624x395.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/Cavity-Wall-image.jpg 2048w\" sizes=\"auto, (max-width: 361px) 100vw, 361px\" \/><\/a><figcaption id=\"caption-attachment-3919\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">This diagram shows the elements of a cavity wall This particular assembly includes an insect barrier and mortar-dropping-collection device.<\/span><\/figcaption><\/figure>\n<p><a name=\"note5\"><\/a>The 2012 energy code has been adopted state by state, and jurisdiction by jurisdiction, so the changes have not been applied uniformly across the country.<a href=\"#note1\"><sup>1<\/sup><\/a><a name=\"note5\"><\/a> Nevertheless, the updated <em>IECC <\/em>is important to all design\/construction professionals, because it is a positive step toward reducing the country\u2019s energy consumption through the design, construction, and operation of more efficient structures. It is important to adapt to these changes as soon as possible, since all regions will likely be affected by the code sooner or later. Preparing now will make the eventual transition to the new energy standards much easier.<\/p>\n<p><strong>CMUs and continuous insulation<\/strong><br \/>\nThe prescriptive energy code for the masonry industry is based primarily on the requirement for continuous insulation (ci) within the wall envelope. This becomes an issue when one looks at the standard concrete masonry unit (CMU)\u2014the cross-webs prevent continuous insulation within the block because they allow thermal bridging. By reducing the cross-web dimension, thermal bridging is reduced and the thermal efficiency of the unit is increased. However, this, in itself, is not the solution to code compliance. It is important to look at all the compliance criteria.<\/p>\n<p>In some cases, a CMU assembly\u2019s mass and resistance to heat transfer (<em>i.e.<\/em> R-value) are all that is necessary to meet the code, but only in warmer climates. Differing temperature conditions means various types of insulation are used in designing the many single-wythe and cavity wall systems specified across the country. Rigid insulation, foam inserts, dry loose fill, injected foam, spray-on foam, and proprietary block design round out the field of techniques for increasing R-value, with typical gains of 5 to 25.<\/p>\n<p>An important factor for determining energy efficiency of a CMU wall is the envelope\u2019s design, specifications, and the materials making up the assembly\u2014various concrete masonry manufacturers will have similar, but ultimately different, mixes. This is one factor that can change a CMU wall\u2019s R-value and the thermal mass performance of otherwise similar envelopes. (For more, see \u201cThermal Mass Basics.\u201d)<\/p>\n<p><a name=\"note6\"><\/a>Other factors include geographical climate history, insulation specifications (within either the CMU or the cavity), and the actual cross-section of the masonry units comprising the wall design. For assistance with this, the National Concrete Masonry Association\u2019s (NCMA\u2019s) TEK 6-2B, <em>R-Values and U-Factors of Single-wythe Concrete Masonry Walls<\/em>, discusses thermal performance of a CMU wall and its thermal properties based on material properties.<a href=\"#note2\"><sup>2<\/sup><\/a><\/p>\n<figure id=\"attachment_3921\" aria-describedby=\"caption-attachment-3921\" style=\"width: 269px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000009113689Medium.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3921\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000009113689Medium-669x1000.jpg\" alt=\"This church was built with masonry cavity walls and brick veneer. An important factor for determining such a wall\u2019s energy effi ciency is the envelope\u2019s design, specifi cations, and the materials making up the assembly.\" width=\"269\" height=\"402\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000009113689Medium-669x1000.jpg 669w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000009113689Medium-200x300.jpg 200w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000009113689Medium-624x931.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000009113689Medium.jpg 1134w\" sizes=\"auto, (max-width: 269px) 100vw, 269px\" \/><\/a><figcaption id=\"caption-attachment-3921\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">This church was built with masonry cavity<\/span><br \/><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">walls and brick veneer.<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">An important factor<\/span><br \/><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">for determining such a<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">wall\u2019s energy efficiency<\/span><br \/><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">is the envelope\u2019s design, <\/span><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">specifications, and the<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">materials making up<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">the assembly.<\/span><\/figcaption><\/figure>\n<p><strong>The three paths to compliance<\/strong><br \/>\nIt is important to clear up the rumor that all masonry walls will require continuous insulation in order to meet the new standards. There are many ways a designer can achieve compliance using complete building systems to meet the new<em> IECC<\/em> requirements rather than relying solely on continuous insulation.<\/p>\n<p>Right now, there are three methods available for determining code compliance, and many of the current masonry designs will show acceptable numbers in at least one of them. These methods are:<\/p>\n<ul>\n<li>prescriptive compliance;<\/li>\n<li>compliant software (also known as \u2018performance method\u2019); and<\/li>\n<li>whole building analysis.<\/li>\n<\/ul>\n<p><em>Prescriptive method<\/em><br \/>\nThe prescriptive method uses a series of material or assembly requirements to meet compliance. For example, designers can employ tabulated values for mass walls that specify requirements for continuous insulation to determine compliance. This is the method most manufacturers and designers use today. Many of the products and systems on the market gain compliance through this path.<\/p>\n<p>However, this prescriptive method may not be part of the next energy code in 2015, so it is important to keep an open mind to developing newer technologies and improvements to existing systems for future compliance to the code. Using the prescriptive tables is easy and straightforward, but this method also limits design flexibility and makes some masonry wall types difficult or impractical to build.<\/p>\n<p><em>Performance method<\/em><br \/>\n<a name=\"note7\"><\/a>The performance or compliant software method uses computer programs developed specifically to determine whether an assembly meets the code. There are two popular programs: the American Society of Heating, Refrigerating, and Air-conditioning Engineers\u2019 (ASHRAE\u2019s) EnvStd and the U.S. Department of Energy\u2019s (DOE\u2019s) COMcheck.<a href=\"#note3\"><sup>3<\/sup><\/a><a name=\"note7\"><\/a> Though the programs differ in their capabilities, they can both offer the designer thermal property constants for various masonry wall configurations. Depending on which part of the energy code the designer needs to meet, these programs can offer wall configurations that meet prevailing codes and which also comply with <em>IECC<\/em> in many cases.<\/p>\n<p>COMcheck is a bit more complex to use than EnvStd, but it offers options to modify many components within the structure that can then be compiled to achieve compliance, offering the design community the ability to use the products they know how to bid, construct, and sell in energy-efficient buildings. If the designer compiles all the information about the project and compliance is not achieved, he or she can adjust various individual properties of the building envelope to meet the code requirements. This method allows more design flexibility because the designer can test how multiple building components interact to achieve compliance.<\/p>\n<p><em>Whole building analysis<\/em><br \/>\nWhole building analysis is not yet widely used. However, it will likely be the prevailing method in the future because it takes into account everything about the building, and can produce accurate guidelines for the most energy-efficient sources.<\/p>\n<p>This method can analyze annual total energy use rather than individual component compliance. It demonstrates when new design methods can reduce energy costs as compared to standard building methods. The whole building method not only takes into account the various wall types, but also includes entire building envelope information, plus mechanical and lighting specifications to determine compliance.<\/p>\n<figure id=\"attachment_3923\" aria-describedby=\"caption-attachment-3923\" style=\"width: 308px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000014016530Medium.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-3923\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000014016530Medium-1000x666.jpg\" alt=\"At left, a mason \u2018butters\u2019 a brick with mortar for installation in a masonry cavity wall. In the photo on the right, one can see the detail of a masonry cavity wall comprising a concrete-unit structural wall and brick veneer.\" width=\"308\" height=\"205\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000014016530Medium-1000x666.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000014016530Medium-300x199.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000014016530Medium-624x415.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000014016530Medium.jpg 1698w\" sizes=\"auto, (max-width: 308px) 100vw, 308px\" \/><\/a><figcaption id=\"caption-attachment-3923\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">At left, a mason \u2018butters\u2019 a brick with mortar for installation in a masonry cavity wall. In the photo on the right, one can see the detail of a masonry cavity wall comprising a concrete-unit structural wall and brick veneer.<\/span><\/figcaption><\/figure>\n<p><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000013773064Medium.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-3922\" style=\"margin-bottom: 110px;\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000013773064Medium-1000x666.jpg\" alt=\"iStock_000013773064Medium\" width=\"309\" height=\"206\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000013773064Medium-1000x666.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000013773064Medium-300x199.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000013773064Medium-624x415.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/iStock_000013773064Medium.jpg 1698w\" sizes=\"auto, (max-width: 309px) 100vw, 309px\" \/><\/a><\/p>\n<p><strong>Other changes<\/strong><br \/>\nBeyond <em>IECC<\/em>, there are a couple of other standards that have recently undergone changes of which those working with masonry design should be aware. ASTM C90-11b, <em>Hollow Load-bearing Concrete Masonry Unit<\/em>s, for example, allows cross-web configurations to regulate by cross-sectional area, not by web thickness. The reasons for paying close attention to this <a name=\"note8\"><\/a>change include:<\/p>\n<ul>\n<li>R-values may be increased,<a href=\"#note4\"><sup>4<\/sup><\/a> while structural characteristics and performance will not change;<\/li>\n<li>a reduction in cost may be achieved (<em>i.e.<\/em> using less material in each block); and<\/li>\n<li>less demand for materials to produce the units, which reduces energy costs for manufacture and transportation.<\/li>\n<\/ul>\n<p>Another important change is associated with National Fire Protection Association (NFPA) 285-12, <em>Standard Fire Test Method for Evaluation of Fire Propagation Characteristics of Exterior Non-load-bearing Wall Assemblies Containing Combustible Components<\/em>. Language in the next energy code will exempt this NFPA test when:<\/p>\n<ul>\n<li>material flame indexes are met to published standards (cited below); and<\/li>\n<li>air spaces that contain insulation are kept to 25 mm (1 in.) or less.<\/li>\n<\/ul>\n<p>The new language approved for inclusion in the code that permits exclusion refers to:<\/p>\n<p><span style=\"font-size: 12pt; font-family: times new roman,times;\">Envelopes where rigid or spray-applied insulation is encased by at least one inch of masonry, and there is no gap between the insulation and the masonry; or the insulation and the CMU are not separated by an air space greater than one inch, and the insulation has an index for flame rate meeting requirements of ASTM E84 [<em>Standard Test Method for Surface Burning Characteristics of Building Materials<\/em>] or [Underwriters Laboratories] UL 723 [<em>Test for Surface Burning Characteristics of Building Materials<\/em>]. <\/span><\/p>\n<p><strong>Conclusion<\/strong><br \/>\nChange is coming to the building industry, driven by a need for far more efficient energy use in the built environment. Masonry has many qualities that make it an ideal building material for energy-efficient construction, including its thermal mass, sustainability, high level of availability, and design flexibility. A combination of new building materials, a better understanding of building dynamics, and improved design software is making it possible for designers to create masonry buildings that meet the new energy codes; skilled masons will be key to making these energy-efficient buildings a reality.<\/p>\n<p><strong>Notes<\/strong><br \/>\n<a name=\"note1\"><\/a><sup>1<\/sup> To determine how the new <em>IECC<\/em> will affect a particular project, visit the U.S. Department of Energy (DOE) website at <a href=\"http:\/\/www.energycodes.gov\">www.energycodes.gov<\/a>. (back to <a href=\"#note5\">top<\/a>)<br \/>\n<a name=\"note2\"><\/a><sup>2<\/sup> Visit <a href=\"http:\/\/www.ncma.org\/etek\/Pages\/Manualviewer.aspx?filename=TEK%2006-02B.pdf\">www.ncma.org\/etek\/Pages\/Manualviewer.aspx?filename=TEK%2006-02B.pdf<\/a>. (back to <a href=\"#note6\">top<\/a><a name=\"note2\"><\/a>)<br \/>\n<a name=\"note3\"><\/a><sup>3<\/sup> Visit www.ashrae.org\/resources&#8211;publications\/publication-updates\/standard-90-1-users-manual-software-envstd-4-0 and <a href=\"http:\/\/www.energycodes.gov\/comcheck\">www.energycodes.gov\/comcheck<\/a>, respectively. (back to <a href=\"#note7\">top<\/a><a name=\"note3\"><\/a>)<br \/>\n<a name=\"note4\"><\/a><sup>4<\/sup> R-values may be increased because of a reduction in thermal bridging via the cross-webs and additional space for insulation. (back to <a href=\"#note8\">top<\/a><a name=\"note4\"><\/a>)<\/p>\n<p><em>Steven Fechino is the engineering and construction manager for Mortar Net Solutions. He provides engineering support services and product training. Fechino has a bachelor\u2019s of science degree in civil engineering technology and two associate degrees in civil engineering and drafting and drafting and design specializing in building construction. He can be contacted at <a href=\"mailto:%20sfechino@mortarnet.com\">sfechino@mortarnet.com<\/a>.<\/em><\/p>\n<p>To read the sidebar, click <a href=\"http:\/\/www.constructionspecifier.com\/masterformat\/designing-masonry-buildings-to-the-2012-energy-code-thermal-mass-basics\/\">here<\/a>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The 2012 <em>International Energy Conservation Code<\/em> (<em>IECC<\/em>) will bring tremendous change to the way buildings are designed, constructed, and renovated. For example, the insulation requirements for masonry construction have been written to higher performance levels. <\/p>\n","protected":false},"author":4,"featured_media":3924,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,184,245,489,460],"tags":[859,942,943,83,665,944],"class_list":["post-3918","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-04-00-00-masonry","category-04-20-00-unit-masonry","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-04-22-00concrete-unit-masonry","tag-bridging","tag-concrete-masonry-unit","tag-continuous-insulation","tag-iecc","tag-thermal-mass","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Designing masonry buildings to the 2012 Energy Code - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Designing masonry buildings to the 2012 Energy Code - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"The 2012 International Energy Conservation Code (IECC) will bring tremendous change to the way buildings are designed, constructed, and renovated. For example, the insulation requirements for masonry construction have been written to higher performance levels.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2014-05-30T13:29:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-13T20:43:25+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"2048\" \/>\n\t<meta property=\"og:image:height\" content=\"1070\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Molly Doyle\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Molly Doyle\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/\"},\"author\":{\"name\":\"Molly Doyle\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\"},\"headline\":\"Designing masonry buildings to the 2012 Energy Code\",\"datePublished\":\"2014-05-30T13:29:45+00:00\",\"dateModified\":\"2017-01-13T20:43:25+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/\"},\"wordCount\":1717,\"commentCount\":2,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/SarasotaFireStation-hires.jpg\",\"keywords\":[\"04 22 00?Concrete Unit Masonry\",\"Bridging\",\"Concrete masonry unit\",\"continuous insulation\",\"IECC\",\"Thermal mass\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"04 00 00 Masonry\",\"04 20 00 Unit Masonry\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/\",\"name\":\"Designing masonry buildings to the 2012 Energy Code - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/SarasotaFireStation-hires.jpg\",\"datePublished\":\"2014-05-30T13:29:45+00:00\",\"dateModified\":\"2017-01-13T20:43:25+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/SarasotaFireStation-hires.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/05\\\/SarasotaFireStation-hires.jpg\",\"width\":2048,\"height\":1070,\"caption\":\"All images courtesy Mortar Net Solutions\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/designing-masonry-buildings-to-the-2012-energy-code\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Designing masonry buildings to the 2012 Energy Code\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\",\"name\":\"Molly Doyle\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"caption\":\"Molly Doyle\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/molly\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Designing masonry buildings to the 2012 Energy Code - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/","og_locale":"en_US","og_type":"article","og_title":"Designing masonry buildings to the 2012 Energy Code - The Construction Specifier","og_description":"The 2012 International Energy Conservation Code (IECC) will bring tremendous change to the way buildings are designed, constructed, and renovated. For example, the insulation requirements for masonry construction have been written to higher performance levels.","og_url":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/","og_site_name":"The Construction Specifier","article_published_time":"2014-05-30T13:29:45+00:00","article_modified_time":"2017-01-13T20:43:25+00:00","og_image":[{"width":2048,"height":1070,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires.jpg","type":"image\/jpeg"}],"author":"Molly Doyle","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Molly Doyle","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/"},"author":{"name":"Molly Doyle","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294"},"headline":"Designing masonry buildings to the 2012 Energy Code","datePublished":"2014-05-30T13:29:45+00:00","dateModified":"2017-01-13T20:43:25+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/"},"wordCount":1717,"commentCount":2,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires.jpg","keywords":["04 22 00?Concrete Unit Masonry","Bridging","Concrete masonry unit","continuous insulation","IECC","Thermal mass"],"articleSection":["Features","MasterFormat","UniFormat","04 00 00 Masonry","04 20 00 Unit Masonry","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/","url":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/","name":"Designing masonry buildings to the 2012 Energy Code - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires.jpg","datePublished":"2014-05-30T13:29:45+00:00","dateModified":"2017-01-13T20:43:25+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/05\/SarasotaFireStation-hires.jpg","width":2048,"height":1070,"caption":"All images courtesy Mortar Net Solutions"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/designing-masonry-buildings-to-the-2012-energy-code\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Designing masonry buildings to the 2012 Energy Code"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294","name":"Molly Doyle","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","caption":"Molly Doyle"},"url":"https:\/\/www.constructionspecifier.com\/author\/molly\/"}]}},"views":12745,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/3918","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=3918"}],"version-history":[{"count":12,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/3918\/revisions"}],"predecessor-version":[{"id":25062,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/3918\/revisions\/25062"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/3924"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=3918"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=3918"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=3918"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}