{"id":47722,"date":"2017-11-06T12:55:18","date_gmt":"2017-11-06T17:55:18","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=47722"},"modified":"2017-11-06T12:55:18","modified_gmt":"2017-11-06T17:55:18","slug":"time-run-glazed-brick","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/","title":{"rendered":"Has time run out for glazed brick?"},"content":{"rendered":"<figure id=\"attachment_47724\" aria-describedby=\"caption-attachment-47724\" style=\"width: 290px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-47724\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013-375x500.jpg\" alt=\"\" width=\"290\" height=\"387\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013-375x500.jpg 375w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013-225x300.jpg 225w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013.jpg 768w\" sizes=\"auto, (max-width: 290px) 100vw, 290px\" \/><\/a><figcaption id=\"caption-attachment-47724\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Examples of glazed brick that has cracked and spalled due to water infiltration, thermal cycling, and restricted movement, among other factors.<br \/><em>Photos courtesy Hoffmann Architects<\/em><\/span><\/figcaption><\/figure>\n<p>Glazed brick has had a love\/hate relationship with the real estate, design, and construction community for well over a century. In 2011, the <em>New York Times<\/em> ran an article in the real estate section stating that during the middle of the last century, \u201cglazed brick was supposed to make [buildings] look like beacons of clean, shiny modernism in the midst of the dirty city,\u201d but that \u201cnow some of them are falling apart.\u201d<\/p>\n<p>Over the years, glazed brick on aging buildings has concerned design professionals, building officials, and property owners because of a propensity to crack and spall (a condition where the front of the brick pops off), creating hazardous conditions and requiring costly repairs. Often, those repairs only address the symptoms of the problem\u2014evident fa\u00e7ade deterioration\u2014and leave the root causes unaddressed, ensuring the cycle of decay and repair repeats.<\/p>\n<p>However, glazed brick was and continues to be an attractive, viable, and\u2014under the right circumstances\u2014durable fa\u00e7ade material. In Technical Notes on Brick Construction 13, <em>Ceramic Glazed Brick Exterior Walls<\/em>, the Brick Industry Association (BIA) affirms:<\/p>\n<p><span style=\"font-family: courier new,courier,monospace;\">proper wall design, detailing, and material selection, along with quality construction, will result in attractive glazed brick applications exhibiting durability, structural stability, and virtually maintenance-free aesthetics.<\/span><\/p>\n<p><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Picture-004.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-47725 \" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Picture-004-300x225.jpg\" alt=\"\" width=\"251\" height=\"188\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Picture-004-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Picture-004-768x576.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Picture-004-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Picture-004.jpg 1024w\" sizes=\"auto, (max-width: 251px) 100vw, 251px\" \/><\/a>Whether it is a new or existing building, the key to a durable glazed brick fa\u00e7ade starts with water management. Per BIA, glazed brick should not be used in areas where it is likely to become saturated. Water penetrating the fa\u00e7ade must be limited to the greatest extent possible, and water that does infiltrate must be given an effective means of exiting. For instance, BIA recommends glazed brick on new buildings be designed as a veneer with a vented drainage cavity behind it. While the incorporation of such a system may be impractical on an existing building, there are a host of other strategies that can be employed. To help arrest the conditions causing decay, a repair campaign should include aggressive water management (including selection of an appropriately flexible and durable mortar) and installation of integral and well-drained flashings at horizontal transitions such as lintels and relieving angles.<\/p>\n<p>Uncontrolled movement of the building\u2019s exterior is also a concern. Parapets, for instance, are exposed to the elements on both their outboard and inboard faces, increasing thermal cycling and reducing the tempering effects of the building\u2019s interior climate. The result is movement that, if not properly accommodated, can lead to cracking. Water infiltration through these cracks accelerates the rate and severity of the deterioration. A fa\u00e7ade that anticipates such movement through use of expansion joints and limits the potential for water infiltration through the incorporation of methods discussed above will prove much more durable over the life of the building.<\/p>\n<p>Finally, owners of buildings with glazed brick fa\u00e7ades are encouraged to undertake repairs to visible distress early and often. Left unattended, such deterioration advances at an increasing rate. Preventive maintenance is the key to mitigating the need for large, costly capital projects.<\/p>\n<p><em><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Hargrove-Craig-2015-e1509990819756.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignleft wp-image-47723\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Hargrove-Craig-2015-e1509990819756-150x150.jpg\" alt=\"\" width=\"90\" height=\"100\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Hargrove-Craig-2015-e1509990819756-269x300.jpg 269w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/Hargrove-Craig-2015-e1509990819756.jpg 342w\" sizes=\"auto, (max-width: 90px) 100vw, 90px\" \/><\/a>Craig A. Hargrove, AIA, LEED AP, is a senior vice president and director, architecture, with Hoffmann Architects Inc. in New York City, specializing in the rehabilitation of building exteriors and enclosure consultation for new construction. He can be reached at <a href=\"mailto:c.hargrove@hoffarch.com\">c.hargrove@hoffarch.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Glazed brick has had a love\/hate relationship with the real estate, design, and construction community for well over a century. In 2011, the New York Times ran an article in the real estate section stating that during the middle of the last century, \u201cglazed brick was supposed to make [buildings] look like beacons of clean,&hellip; <a class=\"more-link\" href=\"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/\">Continue reading <span class=\"screen-reader-text\">Has time run out for glazed brick?<\/span><\/a><\/p>\n","protected":false},"author":6,"featured_media":0,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[9,179,184,245,24],"tags":[80,3799,113],"class_list":["post-47722","post","type-post","status-publish","format-standard","hentry","category-columns","category-masterformat","category-04-00-00-masonry","category-04-20-00-unit-masonry","category-failures","tag-failures-2","tag-glazed-brick","tag-masonry","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Has time run out for glazed brick? - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Has time run out for glazed brick? - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Glazed brick has had a love\/hate relationship with the real estate, design, and construction community for well over a century. In 2011, the New York Times ran an article in the real estate section stating that during the middle of the last century, \u201cglazed brick was supposed to make [buildings] look like beacons of clean,&hellip; Continue reading Has time run out for glazed brick?\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2017-11-06T17:55:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013-375x500.jpg\" \/>\n<meta name=\"author\" content=\"Erik Missio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erik Missio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/\"},\"author\":{\"name\":\"Erik Missio\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\"},\"headline\":\"Has time run out for glazed brick?\",\"datePublished\":\"2017-11-06T17:55:18+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/\"},\"wordCount\":585,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/11\\\/IMG_0013-375x500.jpg\",\"keywords\":[\"failures\",\"glazed brick\",\"Masonry\"],\"articleSection\":[\"Columns\",\"MasterFormat\",\"04 00 00 Masonry\",\"04 20 00 Unit Masonry\",\"Failures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/\",\"name\":\"Has time run out for glazed brick? - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/11\\\/IMG_0013-375x500.jpg\",\"datePublished\":\"2017-11-06T17:55:18+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/11\\\/IMG_0013.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/11\\\/IMG_0013.jpg\",\"width\":768,\"height\":1024,\"caption\":\"Examples of glazed brick that has cracked and spalled due to water infiltration, thermal cycling, and restricted movement, among other factors. Photos courtesy Hoffmann Architects\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/time-run-glazed-brick\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Has time run out for glazed brick?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\",\"name\":\"Erik Missio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"caption\":\"Erik Missio\"},\"sameAs\":[\"http:\\\/\\\/www.constructionspecifier.com\"],\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/erik-missio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Has time run out for glazed brick? - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/","og_locale":"en_US","og_type":"article","og_title":"Has time run out for glazed brick? - The Construction Specifier","og_description":"Glazed brick has had a love\/hate relationship with the real estate, design, and construction community for well over a century. In 2011, the New York Times ran an article in the real estate section stating that during the middle of the last century, \u201cglazed brick was supposed to make [buildings] look like beacons of clean,&hellip; Continue reading Has time run out for glazed brick?","og_url":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/","og_site_name":"The Construction Specifier","article_published_time":"2017-11-06T17:55:18+00:00","og_image":[{"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013-375x500.jpg","type":"","width":"","height":""}],"author":"Erik Missio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Erik Missio","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/"},"author":{"name":"Erik Missio","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b"},"headline":"Has time run out for glazed brick?","datePublished":"2017-11-06T17:55:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/"},"wordCount":585,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013-375x500.jpg","keywords":["failures","glazed brick","Masonry"],"articleSection":["Columns","MasterFormat","04 00 00 Masonry","04 20 00 Unit Masonry","Failures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/","url":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/","name":"Has time run out for glazed brick? - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013-375x500.jpg","datePublished":"2017-11-06T17:55:18+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/11\/IMG_0013.jpg","width":768,"height":1024,"caption":"Examples of glazed brick that has cracked and spalled due to water infiltration, thermal cycling, and restricted movement, among other factors. Photos courtesy Hoffmann Architects"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/time-run-glazed-brick\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Has time run out for glazed brick?"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b","name":"Erik Missio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","caption":"Erik Missio"},"sameAs":["http:\/\/www.constructionspecifier.com"],"url":"https:\/\/www.constructionspecifier.com\/author\/erik-missio\/"}]}},"views":13670,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/47722","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=47722"}],"version-history":[{"count":2,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/47722\/revisions"}],"predecessor-version":[{"id":47731,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/47722\/revisions\/47731"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=47722"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=47722"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=47722"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}