{"id":5793,"date":"2014-10-28T09:37:17","date_gmt":"2014-10-28T13:37:17","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=5793"},"modified":"2017-01-12T14:49:36","modified_gmt":"2017-01-12T19:49:36","slug":"water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/","title":{"rendered":"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow"},"content":{"rendered":"<figure id=\"attachment_5800\" aria-describedby=\"caption-attachment-5800\" style=\"width: 239px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5800 \" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg\" alt=\"Photo \u00a9 OnSite Photography\" width=\"239\" height=\"309\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg 1350w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686-232x300.jpg 232w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686-774x1000.jpg 774w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686-768x993.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686-116x150.jpg 116w\" sizes=\"auto, (max-width: 239px) 100vw, 239px\" \/><\/a><figcaption id=\"caption-attachment-5800\" class=\"wp-caption-text\"><em>Photo \u00a9 OnSite Photography<\/em><\/figcaption><\/figure>\n<p><strong>by Pamela Androff, PE, LEED AP<br \/>\n<\/strong>Variable refrigerant flow (VRF) zoning and geothermal systems are two of the most energy-efficient options for heating and cooling buildings. Now, the benefits of both systems can be combined. This article provides an overview of geothermal (or water-source) with VRF zoning technology, and its advantages compared to traditional geothermal systems, air-source VRF zoning systems, and conventional HVAC systems. Additionally, the article discusses considerations for specifying water-source VRF zoning systems and provides case studies of successful applications.<\/p>\n<p>VRF zoning provides precise comfort control to buildings with multiple floors and areas by moving refrigerant through piping to the zone to be cooled or heated. Some VRF zoning systems offer highly responsive simultaneous cooling and heating, which maximizes use of heat energy that otherwise would be expelled outdoors. Regardless of the time of day, sun or shade, season, or special requirements, VRF zoning systems can deliver comfort tailored to each zone or space.<\/p>\n<p><strong>Geothermal technology overview<\/strong><br \/>\nOutdoor temperatures fluctuate with the changing seasons, but underground temperatures do not change as dramatically because of the earth\u2019s insulating properties. Geothermal systems typically consist of heat exchange equipment located indoors, and a buried system of pipes\u2014called \u2018loops\u2019\u2014to capitalize on constant underground temperatures to provide energy. Water in the heat exchanger circulates through loops below the surface, absorbing or expelling heat to the below-ground heat sink depending on the time of year. This function ultimately reduces the load on the compressor during the cooling and heating cycles, and results in significant energy savings.<\/p>\n<p>Water-source VRF zoning systems combine a geothermal system\u2019s benefits, with the sophistication of VRF zoning. Together, the technologies take advantage of the inverter-driven compressor coupled with a closed geothermal loop instead of air as a heat exchange medium.<\/p>\n<figure id=\"attachment_5803\" aria-describedby=\"caption-attachment-5803\" style=\"width: 301px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Summer-Engineer_Geothermal-graphic-Mitsubishi-Electric-US-Cooling-Heating-Division.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5803\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Summer-Engineer_Geothermal-graphic-Mitsubishi-Electric-US-Cooling-Heating-Division.jpg\" alt=\"This water-source variable refrigerant fl ow (VRF) zoning systems combine the convenience of geothermal systems with the sophistication of VRF zoning systems. These are among the most effi cient and reliable cooling and heating technologies. Image courtesy Mitsubishi Electric US Cooling &amp; Heating Division\" width=\"301\" height=\"290\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Summer-Engineer_Geothermal-graphic-Mitsubishi-Electric-US-Cooling-Heating-Division.jpg 1760w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Summer-Engineer_Geothermal-graphic-Mitsubishi-Electric-US-Cooling-Heating-Division-300x289.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Summer-Engineer_Geothermal-graphic-Mitsubishi-Electric-US-Cooling-Heating-Division-1000x963.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Summer-Engineer_Geothermal-graphic-Mitsubishi-Electric-US-Cooling-Heating-Division-624x601.jpg 624w\" sizes=\"auto, (max-width: 301px) 100vw, 301px\" \/><\/a><figcaption id=\"caption-attachment-5803\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">This water-source variable refrigerant flow (VRF) zoning systems combine<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">the convenience of geothermal systems with the sophistication of VRF<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">zoning systems. These are among the most efficient and reliable cooling<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">and heating technologies. <\/span><em>Image courtesy Mitsubishi Electric US Cooling &amp; Heating Division<\/em><\/figcaption><\/figure>\n<p>Water-source VRF zoning systems have numerous benefits, including many that users have come to expect from air-source VRF zoning systems.<\/p>\n<p><em>Flexible installation<\/em><br \/>\nInstallation is possible in tight spaces because two-pipe designs require less space than ducted systems. Some VRF zoning systems require three- or four-pipe designs, which call for more refrigerant line runs and more brazed connections. Two-pipe designs minimize the total distance of refrigerant line and system connections, which can help reduce installation labor and eventual maintenance costs.<\/p>\n<p>Relatively small water-source VRF zoning condenser units are mounted indoors and can be installed in compact utility closets with minimal access on either side of the unit. Refrigerant, water, and electrical connections are housed on the front of the unit for convenient access.<\/p>\n<p><em>Application variety<\/em><br \/>\nOutdoor water-source VRF zoning units can be connected to an array of indoor unit styles to accommodate the space\u2019s specific needs. All styles are quiet, easy to maintain, and provide optimal comfort. The configuration of the below-ground loop systems can be customized to accommodate the building\u2019s surroundings. For example, loops can be buried under a building or a parking lot by drilling either vertical bore holes or horizontal trenches.<\/p>\n<p><em>Low maintenance<\/em><br \/>\nWater-source VRF zoning systems offer easy maintenance. One VRF unit on the water loop can be serviced without taking the whole system offline. Most indoor units have washable filters that are easy to clean or replace. Condensers can be housed in floor-level utility closets for convenient access and minimal disruption to occupied spaces.<\/p>\n<figure id=\"attachment_5799\" aria-describedby=\"caption-attachment-5799\" style=\"width: 345px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_1-OnSite-Photography.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5799\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_1-OnSite-Photography-1000x666.jpg\" alt=\"A VRF zoning system was an ideal choice for Muscatine County Courthouse in Iowa because the wiring and refrigerant lines could easily retrofi t into the old chase walls without altering the existing historic structure. Photos \u00a9 OnSite Photography\" width=\"345\" height=\"229\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_1-OnSite-Photography-1000x666.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_1-OnSite-Photography-300x199.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_1-OnSite-Photography-624x415.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_1-OnSite-Photography.jpg 2048w\" sizes=\"auto, (max-width: 345px) 100vw, 345px\" \/><\/a><figcaption id=\"caption-attachment-5799\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">A VRF zoning system<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">was an ideal choice<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">for Muscatine County<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">Courthouse in Iowa<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">because the wiring and<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">refrigerant lines could<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">easily retrofit into the<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">old chase walls without<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">altering the existing<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">historic structure<\/span>. <em>Photos \u00a9 OnSite Photography<\/em><\/figcaption><\/figure>\n<p><em>Payback period<\/em><br \/>\nInstalling a water-source VRF zoning system may have a higher upfront cost. Over time, the system efficiency and low-maintenance expenses can offset the system\u2019s initial cost in energy savings. The average payback period is 10 years.<\/p>\n<p><em>Advanced controls<\/em><br \/>\nVRF zoning systems offer several controller types. A central controller can monitor, schedule, and control up to 50 indoor units. Multiple central controllers can be networked together with integrated centralized control software and systems can be tied to a building management system (BMS) using LonWorks and <em>BACnet<\/em> (data communication protocol for building automation and control networks).<\/p>\n<p><em>Clean energy source<\/em><br \/>\nWater-source VRF zoning systems use the clean and sustainable energy stored in the earth to heat and cool buildings. This is a more environmentally responsible and efficient source of energy compared to non-renewable fossil fuels.<\/p>\n<p><em>System efficiency<\/em><br \/>\nVRF zoning technology includes the use of an inverter-driven compressor in the outdoor unit that varies the motor rotation speed, allowing it to precisely meet each zone\u2019s load requirement while reducing power consumption. Also, as mentioned, geothermal VRF zoning systems take advantage of stable ground temperatures for even greater efficiencies.<\/p>\n<figure id=\"attachment_5801\" aria-describedby=\"caption-attachment-5801\" style=\"width: 181px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_5-OnSite-Photography.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5801\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_5-OnSite-Photography-666x1000.jpg\" alt=\"An attractive wood casing covers the indoor units, seamlessly blending into the historic design.\" width=\"181\" height=\"272\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_5-OnSite-Photography-666x1000.jpg 666w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_5-OnSite-Photography-199x300.jpg 199w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_5-OnSite-Photography-624x936.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_5-OnSite-Photography.jpg 1365w\" sizes=\"auto, (max-width: 181px) 100vw, 181px\" \/><\/a><figcaption id=\"caption-attachment-5801\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">An attractive wood casing covers the indoor units, seamlessly blending into the historic design.<\/span><\/figcaption><\/figure>\n<p>The systems always have a condenser unit in combination with an indoor air-handler unit. The condenser can be located indoors or outside, depending on the system.<\/p>\n<p><em>Tax credits<\/em><br \/>\nWater-source VRF zoning systems may qualify for up to a 10 percent federal commercial tax credit for the total installed cost of the geothermal system.<\/p>\n<p><strong>Water-source VRF zoning system advantages<\/strong><br \/>\nA significant advantage of water-source VRF zoning over traditional geothermal systems is the ability of the compressor units to connect to up to 50 indoor units. Traditional geothermal systems require multiple compressors in each zone and the units must be installed in the ceiling space. With water-source VRF systems, fewer condenser units result in easier installation, less equipment, and reduced maintenance. Water-source VRF zoning system condensers are serviceable at floor level, rather than the ceiling, for improved access and minimal disruption to occupied spaces.<\/p>\n<p>Another benefit of water-source VRF zoning technology over standalone geothermal systems is the potential for heat recovery. Some systems allow for simultaneous cooling and heating. In these applications, a VRF zoning system\u2019s compressor operating power will be reduced during heat recovery periods compared to an equivalently-zoned traditional geothermal system. Water-source VRF zoning technology often exceeds the efficiency of traditional geothermal systems due to the ability to recover energy more efficiently on the refrigeration side first, compared to multiple distributed traditional geothermal systems.<\/p>\n<figure id=\"attachment_5795\" aria-describedby=\"caption-attachment-5795\" style=\"width: 330px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/D97P8802-Photography-by-Jeff-Sabo.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5795\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/D97P8802-Photography-by-Jeff-Sabo-1000x666.jpg\" alt=\"When Miami University wanted to renovate its two oldest buildings and demonstrate its commitment to sustainability, the university selected water-source VRF zoning systems. The installation resulted in a 61 percent decrease in energy consumption, making the university\u2019s two oldest buildings the most effi cient.\" width=\"330\" height=\"220\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/D97P8802-Photography-by-Jeff-Sabo-1000x666.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/D97P8802-Photography-by-Jeff-Sabo-300x199.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/D97P8802-Photography-by-Jeff-Sabo-624x415.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/D97P8802-Photography-by-Jeff-Sabo.jpg 2048w\" sizes=\"auto, (max-width: 330px) 100vw, 330px\" \/><\/a><figcaption id=\"caption-attachment-5795\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">When Miami University wanted to renovate its two oldest buildings and demonstrate<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">its commitment to sustainability, the university selected water-source VRF zoning<\/span> <span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">systems. The installation resulted in a 61 percent decrease in energy consumption, <\/span><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">making the university\u2019s two oldest buildings the most efficient.<\/span><\/figcaption><\/figure>\n<p><a name=\"note2\"><\/a>Water-source VRF zoning systems contain many of the same benefits associated with their air-source counterparts, along with additional benefits. The most significant advantage over air-source systems is the heating de-rates.<a href=\"#note1\"><sup>1<\/sup><\/a> In colder climates, the expected capacity of the air-source VRF zoning equipment can be reduced due to the temperature. Sometimes the equipment must be upsized to handle the peak heating demand, but with water-source VRF zoning systems, this is not an issue. Coupling the VRF zoning units with a geothermal loop provides the benefit of higher efficiencies from milder loop temperatures. The power required by the outdoor units may be reduced by as much as 35 percent when compared to air-cooled systems.<\/p>\n<p>Additionally, there are many advantages of these systems compared to unitary or boiler\/chiller HVAC systems. The combination of geothermal and VRF zoning technology results in significant energy saving potential due to the milder loop temperatures requiring less work from the condensers. The water-source VRF zoning outdoor units are small, eliminating the need for large equipment rooms or above-ground space. Regarding indoor units, the refrigerant, water, and electrical connections are on the front of the unit so the condensers can be installed in relatively small utility closets with minimal access on either side of the units. VRF zoning systems also offer the benefit of inverter-driven compressors, which vary the refrigerant flow to each unit for precise and efficient control.<\/p>\n<p><strong>Specifying water-source VRF zoning systems<\/strong><br \/>\nWater-source VRF zoning systems are ideal for climates experiencing significant temperature variations throughout the year, where having the heat exchange medium located in a temperature-stable underground environment will have the most impact. Due to the combined energy efficiency of ground-source and VRF zoning technology, water-source VRF zoning systems can result in one of the most energy-efficient heating and cooling systems available.<\/p>\n<p>As with all VRF zoning systems, the indoor units require minimal ductwork (if any at all), making them ideal for retrofitting older buildings and replacing old boiler\/chiller systems. These systems are ideal for applications such as schools, offices, medical centers, or any building in which individual zone control is essential to occupant comfort.<\/p>\n<p>There are some factors to consider when installing water-source systems. Geothermal systems require a series of wells or loops. Constructing a well field, and having the land to do so, may be cost-prohibitive in some cases, and impossible in large metropolitan cities where space is at a premium. Additionally, anytime digging into the earth is involved, care must be taken to not disturb any existing underground infrastructure. Lastly, installing a geothermal well field may be expensive up front; however, over time, these systems tend to pay back in the form of energy savings.<\/p>\n<p><strong>Muscatine County Courthouse<\/strong><br \/>\nIowa\u2019s Muscatine County Courthouse is a 1907 Beaux-Arts style building listed on the National Register of Historic Places. Courthouse officials needed a replacement for a failing 30-year-old cooling and heating system that was costly in both upkeep and energy usage. They wanted a low-maintenance, high-efficiency replacement system.<\/p>\n<p>Aesthetics and ease of installation were also an issue. The indoor units were loud and moldy. The large condenser unit sitting prominently on the historic building\u2019s roof was an eyesore and needed to be replaced with a smaller unit that could be housed elsewhere. The building\u2019s 609-mm (24-in.) thick limestone walls made the possibility of retrofitting ductwork difficult. Court sessions were conducted throughout the installation, ruling out any system requiring extensive demolition and construction.<\/p>\n<p>The Muscatine County Board of Supervisors had already invested in drilling a geothermal test in anticipation of replacing the old HVAC system. The board selected a water-source VRF zoning system that would interface with the existing geothermal field. The specifying engineer and the board felt the geothermal system was especially suited for Iowa\u2019s climate, where it is not uncommon for winter temperatures to dip below \u201323 C (\u201310 F).<\/p>\n<p>A ductless, two-pipe design would save on labor and equipment cost because it required far less fittings on the refrigerant lines than a three- or four-pipe system. The ductless design also meant the installers did not have to drill through the thick limestone walls and disrupt court sessions. The compressor units could be easily transported down the stairs into the courthouse\u2019s basement where they would be housed, rather than on the roof.<\/p>\n<p>The installation proceeded smoothly and court sessions were not disrupted by the installation.<\/p>\n<p>\u201cJudges were holding court during the transition, and we could not afford to have a lot of banging, pounding, and installation of new equipment,\u201d said Sherry Seright, county budget director.<\/p>\n<p>The system also provided the desired energy-efficiency levels. Courthouse officials observed in the first summer of operation the geothermal field could handle the campus system heat transfer requirement with just 20 percent of the design flow.<\/p>\n<p>Due to the installation\u2019s success, the board decided the water-source VRF zoning systems would be the new standard for any future HVAC retrofits for Muscatine County. They currently have plans to design geothermal VRF zoning systems for two additional county-owned buildings.<\/p>\n<figure id=\"attachment_5796\" aria-describedby=\"caption-attachment-5796\" style=\"width: 332px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/DSC_0019-Tom-Crane-Photography.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5796\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/DSC_0019-Tom-Crane-Photography-1000x665.jpg\" alt=\"A two-pipe water-source VRF zoning system tied into Philadelphia\u2019s Strawberry Mansion\u2019s existing geothermal well fi eld and saved $50,000 up front on installation costs when compared to a four-pipe system. Photos \u00a9 Tom Crane\" width=\"332\" height=\"221\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/DSC_0019-Tom-Crane-Photography-1000x665.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/DSC_0019-Tom-Crane-Photography-300x199.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/DSC_0019-Tom-Crane-Photography-624x415.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/DSC_0019-Tom-Crane-Photography.jpg 2048w\" sizes=\"auto, (max-width: 332px) 100vw, 332px\" \/><\/a><figcaption id=\"caption-attachment-5796\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">A two-pipe water-source VRF zoning system tied into Philadelphia\u2019s Strawberry Mansion\u2019s existing geothermal well field and saved $50,000 up front on installation costs when compared to a four-pipe system. <\/span><em>Photos \u00a9 Tom Crane<\/em><\/figcaption><\/figure>\n<p><strong>Elliot and Stoddard Halls, Miami University<\/strong><br \/>\nMiami University of Ohio, in Oxford, is the 10<sup>th<\/sup> oldest public university in the United States. Its two oldest buildings\u2014Elliott and Stoddard Halls\u2014needed a new cooling and heating system to replace the ineffective and outdated existing coal-fired steam heat system.<\/p>\n<p>Selecting a new HVAC system presented two distinct challenges. The first was the need to preserve the building\u2019s architectural integrity. Both were listed on the National Register of Historic Places and neither had existing ductwork, making a central air solution impossible. The second challenge was meeting the school\u2019s energy-efficiency goals. The university developed a utility master plan that prioritized energy efficiency and mandated moving away from inefficient technologies like coal burning.<\/p>\n<p>\u201cRenovation of any historic building is a complex undertaking requiring a balance between the original architecture and modern building systems,\u201d said Alec R. Carnes, PE, CEM, LEED AP, and senior principal of mechanical engineering, Heapy Engineering, designers of the system.<\/p>\n<p>The design team specified a geothermal VRF zoning system for the job. \u201cGeothermal is advantageous for our climate in Ohio, where heating and cooling loads are closely matched over the year,\u201d said Doug Hammerle, PE, Miami\u2019s director of energy systems. \u201cThis helps balance the well field temperature and maximize the efficiency of the system.\u201d<\/p>\n<p>Seventeen 182-m (600-ft) deep geothermal wells were placed under the sidewalks surrounding the halls. As modern footings were unknown 150 years ago, the hand-dug basements had no space for heat pumps. An easy-to-access mechanical room was built into the attic of each hall for the three heat pumps and centralized controller.<\/p>\n<p>In 2011, Elliott and Stoddard switched from coal-fired steam heat to geothermal heating and cooling. Metered as one, the two halls showed an annual 61 percent decrease in energy consumption compared to 2010. The oldest buildings on campus became the most energy-efficient.<\/p>\n<figure id=\"attachment_5794\" aria-describedby=\"caption-attachment-5794\" style=\"width: 219px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/131001-05-Tom-Crane-Photography.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-5794\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/131001-05-Tom-Crane-Photography-666x1000.jpg\" alt=\"The discreet indoor units blend with Strawberry Mansion\u2019s historic decor while providing the climate control necessary to preserve the mansion\u2019s collection of antiques and fi ne art.\" width=\"219\" height=\"329\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/131001-05-Tom-Crane-Photography-666x1000.jpg 666w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/131001-05-Tom-Crane-Photography-199x300.jpg 199w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/131001-05-Tom-Crane-Photography-624x936.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/131001-05-Tom-Crane-Photography.jpg 1365w\" sizes=\"auto, (max-width: 219px) 100vw, 219px\" \/><\/a><figcaption id=\"caption-attachment-5794\" class=\"wp-caption-text\"><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">The discreet indoor units blend with Strawberry Mansion\u2019s historic decor while providing <\/span><span style=\"font-family: arial,helvetica,sans-serif; font-size: 10pt;\">the climate control necessary to preserve the mansion\u2019s collection of antiques and fine art.<\/span><\/figcaption><\/figure>\n<p>The VRF zoning systems\u2019 ductless design also preserved the original aesthetic of the buildings. The team selected floor-mounted indoor units that could be concealed in cabinets, lending the historic look of a radiator case.<\/p>\n<p>\u201cNone of this would have been possible without the two-pipe system design,\u201d Hammerle said. \u201cThe interior would have been severely cut up with a hydronic four-pipe system.\u201d<\/p>\n<p><strong>Strawberry Mansion, Philadelphia<\/strong><br \/>\nBuilt in 1789 as a summer home, Philadelphia\u2019s Strawberry Mansion is now a museum, but the historic building needed renovations.<\/p>\n<p>One of the most pressing needs of the rehabilitation process was a new cooling and heating system to replace the existing system that dated back to the 1930s. The museum had never been centrally air-conditioned and it needed reliable climate control for the museum\u2019s collection of antiques. With 929 m<sup>2<\/sup> (10,000 sf) on four levels, 23 rooms, and masonry-bearing walls, it was a challenge to find a central cooling and heating system that would be unobtrusive and have little impact on the home. Additionally, the museum wanted to adhere to the Greenworks Philadelphia Plan\u2014a six-year plan launched in 2009 with the goal of making Philadelphia the greenest city in America. There was a strong desire to find an inventive, green building solution to this challenge.<\/p>\n<p>The mansion already had an existing 12-well geothermal field and the project team first considered a four-pipe water-based system. They soon found it was impractical to install. The 200-year-old stone walls could not accommodate many of the 609 X 203-mm (24 X 8-in.) deep chases required for the four-pipe design. In many areas, there was no space for ductwork or for pipe routes perpendicular to structural elements.<\/p>\n<p>A water-source VRF zoning system was able to meet the unique needs of Strawberry Mansion. The two-pipe system and compressor units could easily fit in the old chase walls and ceiling where there was no space for ducting. The flexibility of the refrigerant lines, as opposed to ductwork and diversity of indoor unit styles, were well-suited for the design restrictions posed by the historic structure.<\/p>\n<p>The design team placed the two water-source heat pumps in the basement. They are specifically engineered for closed water loop systems that would efficiently interact with Strawberry Mansion\u2019s existing 12-well geothermal field. Designed to fit in small spaces, these units take up little room and are flexible enough to cool or heat up to 50 individual zones maximizing energy, equipment, and installation efficiency.<\/p>\n<p>The system met the museum\u2019s energy efficiency expectations and also saved the owners $50,000 upfront, compared to the original four-pipe proposal.<\/p>\n<p>\u201cOur collection has suffered from decades of no air-conditioning or humidity control,\u201d said Beth Kowalchick, president of the all-volunteer 1926 Committee who presided over the restoration. \u201cAfter a few months, I could see a noticeable difference in the appearance of our textiles, prints, antique furniture, and fine art.\u201d<\/p>\n<p><strong>Conclusion<\/strong><br \/>\nTechnology combining variable refrigerant flow zoning and geothermal systems\u2014two of the most energy-efficient options for heating and cooling available\u2014can benefit projects compared to traditional geothermal systems, air-source VRF zoning systems, and conventional HVAC systems.<\/p>\n<p><strong>Notes<\/strong><br \/>\n<a name=\"note1\"><\/a><sup>1<\/sup> De-rates are a reduction in capacity. Lower de-rates is an advantage, meaning the system operates more efficiently. For example, if a system operates at 100 percent heating capacity at ?18 C (0 F) degrees and 85 percent heating capacity at ?23 C (?10 F), it has a heating de-rate of 15. Water-source VRF zoning systems tend to have lower heating de-rates than air-source systems\u2014an advantage. (back to <a href=\"#note2\">top<\/a>)<\/p>\n<p><em>Pamela Androff, PE, LEED AP, is product manager\u2013commercial and product planning for Mitsubishi Electric\u2019s U.S. Cooling and Heating Division. In 2013, she became the youngest person to serve as president of American Society of Heating, Refrigerating, and Air-conditioning Engineers\u2019 (ASHRAE\u2019s) Atlanta chapter. In 2014, Androff was named one of <\/em>Consulting-Specifying Engineer<em>\u2019s \u201c40 Under 40,\u201d which recognizes young engineers shaping the future of the industry. Androff earned a bachelor\u2019s degree in mechanical engineering from the University of Central Florida (Orlando), where she served as president of the American Society of Mechanical Engineers (ASME) chapter. She can be contacted by e-mail at <a href=\"mailto:%20pandroff@hvac.mea.com\">pandroff@hvac.mea.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Variable refrigerant flow (VRF) HVAC zoning and geothermal systems are two of the most energy-efficient options for heating and cooling available\u2014now, new hybrid assemblies combine the two. <\/p>\n","protected":false},"author":4,"featured_media":5800,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,197,341,466],"tags":[832,833,1190,1191,834],"class_list":["post-5793","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-23-00-00-heating-ventilating-and-air-conditioning-hvac","category-23-80-00-decentralized-hvac-equipment","category-d30heating-ventilation-and-air-conditioning","tag-23-81-29-variable-refrigerant-flow-hvac-systems","tag-d3030-cooling-systems","tag-geothermal","tag-variable-refrigerant-flow","tag-vrf-zoning","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Variable refrigerant flow (VRF) HVAC zoning and geothermal systems are two of the most energy-efficient options for heating and cooling available\u2014now, new hybrid assemblies combine the two.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2014-10-28T13:37:17+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-12T19:49:36+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1350\" \/>\n\t<meta property=\"og:image:height\" content=\"1745\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Molly Doyle\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Molly Doyle\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"15 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/\"},\"author\":{\"name\":\"Molly Doyle\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\"},\"headline\":\"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow\",\"datePublished\":\"2014-10-28T13:37:17+00:00\",\"dateModified\":\"2017-01-12T19:49:36+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/\"},\"wordCount\":3020,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/10\\\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg\",\"keywords\":[\"23 81 29\u2013Variable Refrigerant Flow HVAC Systems\",\"D3030\u2013Cooling Systems\",\"Geothermal\",\"Variable refrigerant flow\",\"VRF zoning\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)\",\"23 80 00 Decentralized HVAC Equipment\",\"D30\u2212Heating, Ventilation, and Air-conditioning\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/\",\"name\":\"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/10\\\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg\",\"datePublished\":\"2014-10-28T13:37:17+00:00\",\"dateModified\":\"2017-01-12T19:49:36+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/10\\\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2014\\\/10\\\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg\",\"width\":1350,\"height\":1745,\"caption\":\"Photo \u00a9 OnSite Photography\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/2fe1805293ddcc967e4bd9e8afc50294\",\"name\":\"Molly Doyle\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g\",\"caption\":\"Molly Doyle\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/molly\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/","og_locale":"en_US","og_type":"article","og_title":"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow - The Construction Specifier","og_description":"Variable refrigerant flow (VRF) HVAC zoning and geothermal systems are two of the most energy-efficient options for heating and cooling available\u2014now, new hybrid assemblies combine the two.","og_url":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/","og_site_name":"The Construction Specifier","article_published_time":"2014-10-28T13:37:17+00:00","article_modified_time":"2017-01-12T19:49:36+00:00","og_image":[{"width":1350,"height":1745,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg","type":"image\/jpeg"}],"author":"Molly Doyle","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Molly Doyle","Est. reading time":"15 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/"},"author":{"name":"Molly Doyle","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294"},"headline":"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow","datePublished":"2014-10-28T13:37:17+00:00","dateModified":"2017-01-12T19:49:36+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/"},"wordCount":3020,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg","keywords":["23 81 29\u2013Variable Refrigerant Flow HVAC Systems","D3030\u2013Cooling Systems","Geothermal","Variable refrigerant flow","VRF zoning"],"articleSection":["Features","MasterFormat","UniFormat","23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)","23 80 00 Decentralized HVAC Equipment","D30\u2212Heating, Ventilation, and Air-conditioning"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/","url":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/","name":"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg","datePublished":"2014-10-28T13:37:17+00:00","dateModified":"2017-01-12T19:49:36+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2014\/10\/Muscatine-County-Courthouse_3-OnSite-Photography-e1484250282686.jpg","width":1350,"height":1745,"caption":"Photo \u00a9 OnSite Photography"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/water-source-vrf-zoning-101-combining-geothermal-with-variable-refrigerant-flow\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Water-source VRF Zoning 101: Combining geothermal with variable refrigerant flow"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/2fe1805293ddcc967e4bd9e8afc50294","name":"Molly Doyle","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b9db24e2e72277a0449a8b18be06d377923ec2d6246b36613db304f58b586baf?s=96&d=mm&r=g","caption":"Molly Doyle"},"url":"https:\/\/www.constructionspecifier.com\/author\/molly\/"}]}},"views":21583,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/5793","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=5793"}],"version-history":[{"count":4,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/5793\/revisions"}],"predecessor-version":[{"id":24913,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/5793\/revisions\/24913"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/5800"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=5793"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=5793"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=5793"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}