{"id":58003,"date":"2018-04-02T11:00:35","date_gmt":"2018-04-02T15:00:35","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=58003"},"modified":"2018-04-02T11:00:35","modified_gmt":"2018-04-02T15:00:35","slug":"washington-child-care-center-mitigates-risk-of-vapor-intrusion","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/","title":{"rendered":"Washington child care center mitigates risk of vapor intrusion"},"content":{"rendered":"<figure id=\"attachment_58004\" aria-describedby=\"caption-attachment-58004\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/vapor.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-58004 size-medium\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/vapor-300x225.jpg\" alt=\"\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/vapor-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/vapor-768x576.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/vapor-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/vapor.jpg 960w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-58004\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Installers roll out and apply a polypropylene tarp tailored to fit around the vertical uprights and sealed to the foundation. <br \/><em>Photo courtesy Vapor Mitigation Strategies<\/em><\/span><\/figcaption><\/figure>\n<p><strong>by Wesley Robb<\/strong><\/p>\n<p>As is the case with many buildings, a national chain of early childhood education centers chose the location of its Washington D.C. project on a site known to have soil and groundwater contamination as a result of the property\u2019s former uses.<\/p>\n<p>Previous activities on the site\u2014conducted by a governmental agency\u2014required the installation of underground storage tanks (USTs) containing diesel fuel. The existence of these tanks was suspected due to the conclusions of an environmental site assessment (ESA), also known as a Phase I Site Assessment, which is routinely done as part of the due diligence process in property transfers. A subsequent sub-surface soil investigation, known as a Phase II Site Assessment, indicated the ground and groundwater at the site was contaminated.<\/p>\n<p>This type of contamination, better known as vapor intrusion, can have serious consequences on a building\u2019s indoor air quality (IAQ) if left unaddressed. <a href=\"https:\/\/www.constructionspecifier.com\/retrofitting-buildings-vapor-barriers\/\" target=\"_blank\" rel=\"noopener\">Vapor intrusion<\/a> is the hazardous, potentially harmful migration of chemical vapors into a building from soil and groundwater contaminated by petroleum products or volatile chemicals. The negative health effects (<em>e.g.<\/em> lung cancer, decreased kidney function, damage, and cancer, heart failure, and ischemia) caused by these chemical vapors can be experienced by both the building\u2019s occupants and their offspring. Unfortunately, vapor intrusion cannot be detected by sight or smell, so being conscious of the issue is very important. Additionally, future litigation where building owners are held responsible is a cause for concern.<\/p>\n<p>Luckily, awareness about vapor intrusion has grown in recent years. Recently the <a href=\"https:\/\/www.epa.gov\/\" target=\"_blank\" rel=\"noopener\">Environmental Protection Agency<\/a> (EPA) specified vapor intrusion as a potential pathway in its <a href=\"https:\/\/www.epa.gov\/superfund\" target=\"_blank\" rel=\"noopener\">Superfund Program<\/a>, designed to fund the clean-up of uncontrolled hazardous waste sites. The program resulted from the passage of the Comprehensive Environmental Resource Conservation and Recovery Act (CERCLA) in the early 1980s. Placing vapor intrusion on the list of pathways eligible for monetary assistance underscores EPA\u2019s conviction sites with vapor intrusion potential should be addressed to protect human health and the environment.<\/p>\n<p>At the Washington D.C. site, the USTs and diesel-contaminated soil were removed. However, since this location was to be a child care and early childhood education center for the neighborhood, the specifier included a vapor intrusion mitigation system in the project\u2019s design plans to ensure the safety of the buildings\u2019 occupants.<\/p>\n<p>The vapor intrusion mitigation system was a combination of two elements\u2014an active pump sub-slab depressurization system (SSDS) and a spray-applied asphaltic vapor barrier (AVB). The SSDS consists of two square subterranean concrete vault \u201cpits\u201d with slotted openings at the top, and piping running from the pits to risers penetrating the sub-floor. The risers that are connected to an on-the-roof service pumps soil gas accumulated below the building\u2019s sub-slab, out and away from the structures.<\/p>\n<p>Both vapor pits were installed as part of the general contractor\u2019s pre-vapor intrusion mitigation installation commitment to provide for large-scale construction items prior to the finishing of the SSDS and AVB by vapor intrusion mitigation installation specialists.<\/p>\n<p>The contractor accomplished pre-installation work including construction of the vapor pits, all plumbing and electrical penetrating uprights, and concrete collars around clustered penetrating uprights, as well as smooth-grinding of rough surfaces for attachment of AVB to the foundation, and compacting the sub-slab gravel bed.<\/p>\n<p>The installers of the vapor intrusion mitigation system completed the piping from the vapor pits to the risers for the SSDS and installed the AVB and four vapor monitoring wells for regular monitoring of the slabs under the buildings for contaminants.<\/p>\n<p>The AVB was installed using a three-layer approach. First, a polypropylene tarp was rolled out, tailored to fit around the vertical uprights, and sealed to either the foundation or uprights with a chemically-resistant asphaltic core material at the center of the three-layer AVB.<\/p>\n<p>Then the asphaltic core material was sprayed over the remaining tarped area. Finally, a layer of tarp was installed to provide protection to the vapor barrier itself since metal rebar and concrete were arranged on top.<\/p>\n<p>The installation was observed and inspected by a trained and certified personnel. The inspection included a coupon thickness test to verify the specified thickness of the vapor barrier, and a smoke test to ensure the integrity of the finished system. The installers documented these tests and provided the materials to the manufacturer to enforce the warranty accompanied by these products.<\/p>\n<p>The project required approximately 1765 m<sup>2<\/sup> (19,000 sf) of vapor barrier. From start to finish, the process took approximately five days to complete.<\/p>\n<p><em><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/Robb.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-58005 alignleft\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/Robb-250x300.jpg\" alt=\"\" width=\"72\" height=\"86\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/Robb-250x300.jpg 250w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/Robb-417x500.jpg 417w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/Robb.jpg 509w\" sizes=\"auto, (max-width: 72px) 100vw, 72px\" \/><\/a>Wesley Robb is the director of technical strategies and applications at Vapor Mitigation Strategies, a Wellington Environmental Company. He has 29 years of environmental field and laboratory experience, including several years of soil vapor sampling and analyses. Since joining Wellington in 2004, Robb has managed onsite activities of various kinds, including underground storage tank removals, soil remediation, Phase I investigations, and vapor\/soil\/groundwater sampling. He can be reached at <a href=\"mailto:wes@vapormitigationstrategies.com\" target=\"_blank\" rel=\"noopener\">wes@vapormitigationstrategies.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>As is the case with many buildings, a national chain of early childhood education centers chose the location of its Washington D.C. project on a site known to have soil and groundwater contamination as a result of the property\u2019s former uses. The specifier included a vapor intrusion mitigation system in the project\u2019s design plans to ensure the safety of the buildings\u2019 occupants.<\/p>\n","protected":false},"author":4183,"featured_media":58013,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,12,179,449,201,362,2410,457],"tags":[4264,3353,3857,584,3387,3859],"class_list":["post-58003","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-web-exclusive","category-masterformat","category-uniformat","category-31-00-00-earthwork","category-31-20-00-earth-moving","category-a-substructure","category-a60water-and-gas-mitigation","tag-groundwater-contamination","tag-maryland","tag-off-gassing","tag-vapor-barrier","tag-vapor-intrusion","tag-vapor-mitigation-system","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Washington child care center mitigates risk of vapor intrusion - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Washington child care center mitigates risk of vapor intrusion - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"As is the case with many buildings, a national chain of early childhood education centers chose the location of its Washington D.C. project on a site known to have soil and groundwater contamination as a result of the property\u2019s former uses. The specifier included a vapor intrusion mitigation system in the project\u2019s design plans to ensure the safety of the buildings\u2019 occupants.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2018-04-02T15:00:35+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/mitigation.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"400\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"nithya_caleb\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"nithya_caleb\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/\"},\"author\":{\"name\":\"nithya_caleb\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b98ef8acdc4f61ec3c542bdb863ee469\"},\"headline\":\"Washington child care center mitigates risk of vapor intrusion\",\"datePublished\":\"2018-04-02T15:00:35+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/\"},\"wordCount\":857,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/mitigation.jpg\",\"keywords\":[\"groundwater contamination\",\"Maryland\",\"Off-gassing\",\"Vapor barrier\",\"vapor intrusion\",\"Vapor mitigation system\"],\"articleSection\":[\"Features\",\"Web Exclusive\",\"MasterFormat\",\"UniFormat\",\"31 00 00 Earthwork\",\"31 20 00 Earth Moving\",\"A-Substructure\",\"A60\u2212Water and Gas Mitigation\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/\",\"name\":\"Washington child care center mitigates risk of vapor intrusion - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/mitigation.jpg\",\"datePublished\":\"2018-04-02T15:00:35+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/mitigation.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/mitigation.jpg\",\"width\":400,\"height\":300},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Washington child care center mitigates risk of vapor intrusion\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b98ef8acdc4f61ec3c542bdb863ee469\",\"name\":\"nithya_caleb\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"caption\":\"nithya_caleb\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/nithya_caleb\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Washington child care center mitigates risk of vapor intrusion - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/","og_locale":"en_US","og_type":"article","og_title":"Washington child care center mitigates risk of vapor intrusion - The Construction Specifier","og_description":"As is the case with many buildings, a national chain of early childhood education centers chose the location of its Washington D.C. project on a site known to have soil and groundwater contamination as a result of the property\u2019s former uses. The specifier included a vapor intrusion mitigation system in the project\u2019s design plans to ensure the safety of the buildings\u2019 occupants.","og_url":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/","og_site_name":"The Construction Specifier","article_published_time":"2018-04-02T15:00:35+00:00","og_image":[{"width":400,"height":300,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/mitigation.jpg","type":"image\/jpeg"}],"author":"nithya_caleb","twitter_card":"summary_large_image","twitter_misc":{"Written by":"nithya_caleb","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/"},"author":{"name":"nithya_caleb","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b98ef8acdc4f61ec3c542bdb863ee469"},"headline":"Washington child care center mitigates risk of vapor intrusion","datePublished":"2018-04-02T15:00:35+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/"},"wordCount":857,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/mitigation.jpg","keywords":["groundwater contamination","Maryland","Off-gassing","Vapor barrier","vapor intrusion","Vapor mitigation system"],"articleSection":["Features","Web Exclusive","MasterFormat","UniFormat","31 00 00 Earthwork","31 20 00 Earth Moving","A-Substructure","A60\u2212Water and Gas Mitigation"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/","url":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/","name":"Washington child care center mitigates risk of vapor intrusion - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/mitigation.jpg","datePublished":"2018-04-02T15:00:35+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/mitigation.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/mitigation.jpg","width":400,"height":300},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/washington-child-care-center-mitigates-risk-of-vapor-intrusion\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Washington child care center mitigates risk of vapor intrusion"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b98ef8acdc4f61ec3c542bdb863ee469","name":"nithya_caleb","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","caption":"nithya_caleb"},"url":"https:\/\/www.constructionspecifier.com\/author\/nithya_caleb\/"}]}},"views":5062,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/58003","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4183"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=58003"}],"version-history":[{"count":1,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/58003\/revisions"}],"predecessor-version":[{"id":58014,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/58003\/revisions\/58014"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/58013"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=58003"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=58003"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=58003"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}