{"id":59168,"date":"2018-04-13T08:49:59","date_gmt":"2018-04-13T12:49:59","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=59168"},"modified":"2018-04-13T08:49:59","modified_gmt":"2018-04-13T12:49:59","slug":"collaborative-curtain-wall-design-fast-tracks-seattle-project","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/","title":{"rendered":"Collaborative curtain wall design fast-tracks Seattle project"},"content":{"rendered":"<figure id=\"attachment_59169\" aria-describedby=\"caption-attachment-59169\" style=\"width: 800px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-59169\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla.jpg\" alt=\"\" width=\"800\" height=\"533\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla.jpg 800w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla-500x333.jpg 500w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-59169\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">To minimize cost and construction delays, designers from Perkins_Will collaborated with the project\u2019s contractor and glazing subcontractor during the schematic design phase. <\/span><br \/><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photos \u00a9 Doug Scott, courtesy Wausau Window and Wall Systems<\/span><\/em><\/figcaption><\/figure>\n<p>Located between a high-tech corridor and a trendy neighborhood, Seattle\u2019s Third &amp; Harrison was envisioned by designers at <a href=\"https:\/\/perkinswill.com\/offices\/seattle.html\">Perkins+Will<\/a> as a new, sustainably-designed icon for urban professionals interested in working close to the city\u2019s natural elements.<\/p>\n<p>\u201cThe half-block development is conceived as two glass pavilions\u2014lightly resting on the ground and linked by a central atrium,\u201d said Ed Palushock, senior project designer at Perkins+Will. \u201cTo address the extreme topography and engage the neighborhood, there are three different building entries at three different levels.\u201d<\/p>\n<p>With a 1-acre (0.4-ha) floor plate, the 17,187-m<sup>2<\/sup> (185,000-sf) office building\u2019s amenities include adjacent pocket parks and underground parking in addition to vegetative roof-top terraces, which offer views of Elliot Bay and the Olympic Mountains. To ensure unobstructed sight lines and optimize daylight from within the five-story structure, designers required a glass curtain wall system.<\/p>\n<p>\u201cThe client wanted a substantial amount of glass for natural light and views, but the challenge is that Seattle has some of the most stringent energy codes with prescriptive limitations on this material,\u201d said Palushock. \u201cWe also were on a fast-track design and construction schedule. We had less than one year for design, plus another year for construction on a constrained, urban site.\u201d<\/p>\n<p>To minimize both construction costs and potential complications, designers from Perkins+Will invited input from the project\u2019s contractor and glazing subcontractor during the schematic design phase. The team collaborated on a unitized glazing system with a focus on construction speed and efficiency.<\/p>\n<p>\u201cWe needed everyone at the table as early as possible,\u201d Palushock said. \u201cTogether, we met monthly to review design progress and detail development, address limitations, and develop solutions that Perkins+Will could put into our drawings. We continued to work through the remainder of the construction document phase, with the construction team rolling right into shop drawings.\u201d<\/p>\n<p>Among the discussed details were the width and depth of both the window and curtain wall systems.<\/p>\n<p>\u201cBasically, we did not want to notice the framing,\u201d said Palushock. \u201cWe wanted to have it essentially disappear. It is all about the view.\u201d<\/p>\n<figure id=\"attachment_59170\" aria-describedby=\"caption-attachment-59170\" style=\"width: 400px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/02edit_WA_3rdHarrison-Holla.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-59170\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/02edit_WA_3rdHarrison-Holla-500x338.jpg\" alt=\"\" width=\"400\" height=\"270\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/02edit_WA_3rdHarrison-Holla-500x338.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/02edit_WA_3rdHarrison-Holla-300x203.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/02edit_WA_3rdHarrison-Holla-768x518.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/02edit_WA_3rdHarrison-Holla.jpg 800w\" sizes=\"auto, (max-width: 400px) 100vw, 400px\" \/><\/a><figcaption id=\"caption-attachment-59170\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The project&#8217;s design and construction teams met regularly, which helped keep the project on-track and on-budget.<\/span><\/figcaption><\/figure>\n<p>The design also detailed several goals related to energy-efficiency. To support these objectives, the project\u2019s window system featured polyamide thermal barriers to improve the buildings thermal performance while also maintaining the structural and long-term durability of the window unit. Additionally, the aluminum employed by manufacturers in both the curtain wall and window systems is a high recycled-content aluminum billet composition.<\/p>\n<p>The manufacturer provided more than 2787 m<sup>2<\/sup> (30,000 sf) of factory-assembled and -glazed curtain wall to expedite installation on site. Delivery of both the fabricated and finished material was sequenced in phases to optimize work within the confines of the job site.<\/p>\n<p>\u201cIt was a concerted effort to coordinate the path of trades on-site so they were not tripping over one another,\u201d said Palushock. \u201cEveryone understood how this needed to go together. The team dovetailed their work nicely and kept us informed of progress and pricing in real-time.\u201d<\/p>\n<p>The project broke ground in December 2015, with curtain wall and window installation beginning in February 2016. The team completed the work on-schedule, wrapping up installation in September.<\/p>\n<p>\u201cWe managed costs along the way from design to construction,\u201d said Palushock. \u201cThere were no surprises and everything went very smoothly.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Located between a high-tech corridor and a trendy neighborhood, Seattle\u2019s Third &#038; Harrison was envisioned by designers at Perkins+Will as a new, sustainably-designed icon for urban professionals interested in working close to the city\u2019s natural elements.<\/p>\n","protected":false},"author":4887,"featured_media":59169,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[852,149,1198,4230,2735,3325,601,3309],"class_list":["post-59168","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","tag-08-44-00-curtain-wall-and-glazed-assemblies","tag-curtain-walls","tag-division-08","tag-doors-windows","tag-green-roof","tag-seattle","tag-sustainability","tag-washington","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Collaborative curtain wall design fast-tracks Seattle project - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Collaborative curtain wall design fast-tracks Seattle project - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Located between a high-tech corridor and a trendy neighborhood, Seattle\u2019s Third &amp; Harrison was envisioned by designers at Perkins+Will as a new, sustainably-designed icon for urban professionals interested in working close to the city\u2019s natural elements.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2018-04-13T12:49:59+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samantha Ashenhurst\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samantha Ashenhurst\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/\"},\"author\":{\"name\":\"Samantha Ashenhurst\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/08c7087dff45ca0529eac7675313f4c7\"},\"headline\":\"Collaborative curtain wall design fast-tracks Seattle project\",\"datePublished\":\"2018-04-13T12:49:59+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/\"},\"wordCount\":612,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/01edit_WA_3rdHarrison-Holla.jpg\",\"keywords\":[\"08 44 00\u2013Curtain Wall and Glazed Assemblies\",\"curtain walls\",\"Division 08\",\"Doors &amp; Windows\",\"green roof\",\"Seattle\",\"Sustainability\",\"Washington\"],\"articleSection\":[\"Form+Function\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/\",\"name\":\"Collaborative curtain wall design fast-tracks Seattle project - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/01edit_WA_3rdHarrison-Holla.jpg\",\"datePublished\":\"2018-04-13T12:49:59+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/01edit_WA_3rdHarrison-Holla.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/04\\\/01edit_WA_3rdHarrison-Holla.jpg\",\"width\":800,\"height\":533,\"caption\":\"To minimize cost and construction delays, designers from Perkins_Will collaborated with the project\u2019s contractor and glazing subcontractor during the schematic design phase. Photos \u00a9 Doug Scott, courtesy Wausau Window and Wall Systems\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/collaborative-curtain-wall-design-fast-tracks-seattle-project\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Collaborative curtain wall design fast-tracks Seattle project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/08c7087dff45ca0529eac7675313f4c7\",\"name\":\"Samantha Ashenhurst\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g\",\"caption\":\"Samantha Ashenhurst\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/sashenhurstkenilworth-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Collaborative curtain wall design fast-tracks Seattle project - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/","og_locale":"en_US","og_type":"article","og_title":"Collaborative curtain wall design fast-tracks Seattle project - The Construction Specifier","og_description":"Located between a high-tech corridor and a trendy neighborhood, Seattle\u2019s Third & Harrison was envisioned by designers at Perkins+Will as a new, sustainably-designed icon for urban professionals interested in working close to the city\u2019s natural elements.","og_url":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/","og_site_name":"The Construction Specifier","article_published_time":"2018-04-13T12:49:59+00:00","og_image":[{"width":800,"height":533,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla.jpg","type":"image\/jpeg"}],"author":"Samantha Ashenhurst","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Samantha Ashenhurst","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/"},"author":{"name":"Samantha Ashenhurst","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/08c7087dff45ca0529eac7675313f4c7"},"headline":"Collaborative curtain wall design fast-tracks Seattle project","datePublished":"2018-04-13T12:49:59+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/"},"wordCount":612,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla.jpg","keywords":["08 44 00\u2013Curtain Wall and Glazed Assemblies","curtain walls","Division 08","Doors &amp; Windows","green roof","Seattle","Sustainability","Washington"],"articleSection":["Form+Function"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/","url":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/","name":"Collaborative curtain wall design fast-tracks Seattle project - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla.jpg","datePublished":"2018-04-13T12:49:59+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/04\/01edit_WA_3rdHarrison-Holla.jpg","width":800,"height":533,"caption":"To minimize cost and construction delays, designers from Perkins_Will collaborated with the project\u2019s contractor and glazing subcontractor during the schematic design phase. Photos \u00a9 Doug Scott, courtesy Wausau Window and Wall Systems"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/collaborative-curtain-wall-design-fast-tracks-seattle-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Collaborative curtain wall design fast-tracks Seattle project"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/08c7087dff45ca0529eac7675313f4c7","name":"Samantha Ashenhurst","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g","caption":"Samantha Ashenhurst"},"url":"https:\/\/www.constructionspecifier.com\/author\/sashenhurstkenilworth-com\/"}]}},"views":7127,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/59168","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4887"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=59168"}],"version-history":[{"count":7,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/59168\/revisions"}],"predecessor-version":[{"id":59177,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/59168\/revisions\/59177"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/59169"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=59168"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=59168"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=59168"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}