{"id":62474,"date":"2018-05-28T08:44:31","date_gmt":"2018-05-28T12:44:31","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=62474"},"modified":"2018-05-28T08:44:31","modified_gmt":"2018-05-28T12:44:31","slug":"missouri-school-electric-hvac","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/","title":{"rendered":"Cooling down a century-old Missouri school with electric HVAC"},"content":{"rendered":"<figure id=\"attachment_62475\" aria-describedby=\"caption-attachment-62475\" style=\"width: 800px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-62475\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1.jpg\" alt=\"The old boiler system at St. Joseph School caused inconsistent temperatures throughout the building and the window units were loud. Photos by Mitsubishi Electric\" width=\"800\" height=\"534\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1.jpg 1024w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1-500x333.jpg 500w\" sizes=\"auto, (max-width: 800px) 100vw, 800px\" \/><\/a><figcaption id=\"caption-attachment-62475\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The old boiler system at St. Joseph School caused inconsistent temperatures throughout the building. <\/span><br \/><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photos \u00a9 <a href=\"http:\/\/www.mitsubishielectric.com\/en\/index.html\" target=\"_blank\" rel=\"noopener\">Mitsubishi Electric<\/a><\/span><\/em><\/figcaption><\/figure>\n<p>Since opening its doors in 1902, St. Joseph School in Pilot Grove, Missouri, has educated generations of children. After tolerating an outdated boiler system and noisy window units for many years, officials at the private school decided it was time to find a system that could efficiently cool and heat the 502-m<sup>2<\/sup> (5400-sf) building year-round.<\/p>\n<p>\u201cThe boiler system that was in place previously did not heat the rooms evenly,\u201d said Nichole Watring, school principal. \u201cThe building is a two-story building with a basement, and the upstairs rooms were always much warmer than the downstairs rooms. There was not a way for the teachers to control the temperature in their rooms, and the window units for the air conditioning were very noisy.\u201d<\/p>\n<figure id=\"attachment_62476\" aria-describedby=\"caption-attachment-62476\" style=\"width: 350px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/02_edit-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-62476\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/02_edit-1-300x200.jpg\" alt=\"The sleek electrical units allow for individualized temperature control in each room. \" width=\"350\" height=\"233\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/02_edit-1-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/02_edit-1-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/02_edit-1-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/02_edit-1.jpg 1024w\" sizes=\"auto, (max-width: 350px) 100vw, 350px\" \/><\/a><figcaption id=\"caption-attachment-62476\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The sleek electrical units allow for individualized temperature control in each room.<\/span><\/figcaption><\/figure>\n<p>Additionally, there was concern pertaining to the school\u2019s climbing utility bills and other costs related to maintaining the obsolete boiler system and clunky window units.<\/p>\n<p>\u201cThe air conditioners were taking up a lot of energy, and we were replacing them almost every three years,\u201d said Donna Gerke, school manager. \u201cWe also had the boiler worked on every year. It became a cost issue from the system\u2019s inefficiencies. We needed individual control within each room while looking to use less energy.\u201d<\/p>\n<p>School officials consulted with Jamie Callahan, director of field operations with <a href=\"https:\/\/www.airwatersolutions.com\/\" target=\"_blank\" rel=\"noopener\">Air and Water Solutions<\/a>, to assist in selecting an upgraded HVAC system. Callahan listened to the school\u2019s needs and system requirements and recommended they use zoned technology, which would allow for individualized temperature control.<\/p>\n<p>\u201cWith the previous system, there was an inconsistency of cooling capacity, and the window units rattled and teachers could not talk over it,\u201d Callahan said. \u201cThey had air blowing in different directions but children should have a very climate-controlled environment. Ductwork also was not an option unless it was exposed. They needed units zoned for every room.\u201d<\/p>\n<p>School officials agreed with Callahan\u2019s suggestion. They opted for split-ductless technology, which would allow each room to have its own heating\/cooling unit that could be adjusted to suit the needs of the occupants. This would also allow the school to forgo its gas boiler and install energy efficient electric units.<\/p>\n<p>The project team installed the system over summer break to avoid classroom disruption. The installation took two weeks, finishing on budget and on schedule.<\/p>\n<figure id=\"attachment_62477\" aria-describedby=\"caption-attachment-62477\" style=\"width: 350px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/03_edit-1.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-62477\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/03_edit-1-300x200.jpg\" alt=\"\" width=\"350\" height=\"233\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/03_edit-1-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/03_edit-1-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/03_edit-1-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/03_edit-1.jpg 1024w\" sizes=\"auto, (max-width: 350px) 100vw, 350px\" \/><\/a><figcaption id=\"caption-attachment-62477\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The school\u2019s electric bill has dropped significantly since installing the electric HVAC system, says St. Joseph School principal Nichole Watring.<\/span><\/figcaption><\/figure>\n<p>In addition to lower costs, since introducing the updated electric HVAC system, faculty and students at St. Joseph School have enjoyed a much more comfortable learning environment. Teachers enjoy the flexibility of setting their own classroom temperature and the units require little maintenance beyond filter-cleaning. The system also allows for classrooms to function more efficiently, as the removal of the old system\u2019s radiators freed up space that was previously unusable.<\/p>\n<p>\u201cWe have not had any issues with the system and the teachers and students love that they can control the temperature of their rooms,\u201d said Watring. \u201cIt is much quieter and more efficient than the previous system. The students especially love the burst of cool air when they come in from recess on hot days.\u201d<\/p>\n<p>Students and faculty were also pleased with the system\u2019s sleek appearance.<\/p>\n<p>\u201cWe looked for a system that offered more cost savings and efficiency but aesthetics was an added bonus,\u201d said Gerke. \u201cIt has given the school a whole new look on the inside. It looks fresher and cleaner.\u201d<\/p>\n","protected":false},"excerpt":{"rendered":"<p>After tolerating an outdated boiler system and noisy window units for  years, officials at  St. Joseph School in Missouri wanted a system that could efficiently cool and heat the building year-round.<\/p>\n","protected":false},"author":4887,"featured_media":62475,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,197],"tags":[4407,4408,130,1555,552,103,3293,2883],"class_list":["post-62474","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-23-00-00-heating-ventilating-and-air-conditioning-hvac","tag-23-00-00-heating-ventilating-and-air-conditioning","tag-23-09-33-electric-and-electronic-control-system-for-hvac","tag-air-distribution","tag-division-23","tag-energy-efficiency","tag-hvac","tag-missouri","tag-school","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Cooling down a century-old Missouri school with electric HVAC - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Cooling down a century-old Missouri school with electric HVAC - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"After tolerating an outdated boiler system and noisy window units for years, officials at St. Joseph School in Missouri wanted a system that could efficiently cool and heat the building year-round.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2018-05-28T12:44:31+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1024\" \/>\n\t<meta property=\"og:image:height\" content=\"683\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samantha Ashenhurst\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samantha Ashenhurst\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/\"},\"author\":{\"name\":\"Samantha Ashenhurst\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/08c7087dff45ca0529eac7675313f4c7\"},\"headline\":\"Cooling down a century-old Missouri school with electric HVAC\",\"datePublished\":\"2018-05-28T12:44:31+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/\"},\"wordCount\":636,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/01_edit-1.jpg\",\"keywords\":[\"23 00 00\u2013Heating Ventilating and Air Conditioning\",\"23 09 33\u2013Electric and Electronic Control System for HVAC\",\"air distribution\",\"Division 23\",\"Energy efficiency\",\"HVAC\",\"Missouri\",\"School\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/\",\"name\":\"Cooling down a century-old Missouri school with electric HVAC - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/01_edit-1.jpg\",\"datePublished\":\"2018-05-28T12:44:31+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/01_edit-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/05\\\/01_edit-1.jpg\",\"width\":1024,\"height\":683,\"caption\":\"The old boiler system at St. Joseph School caused inconsistent temperatures throughout the building and the window units were loud. Photos \u00a9 Mitsubishi Electric\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/missouri-school-electric-hvac\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Cooling down a century-old Missouri school with electric HVAC\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/08c7087dff45ca0529eac7675313f4c7\",\"name\":\"Samantha Ashenhurst\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g\",\"caption\":\"Samantha Ashenhurst\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/sashenhurstkenilworth-com\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Cooling down a century-old Missouri school with electric HVAC - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/","og_locale":"en_US","og_type":"article","og_title":"Cooling down a century-old Missouri school with electric HVAC - The Construction Specifier","og_description":"After tolerating an outdated boiler system and noisy window units for years, officials at St. Joseph School in Missouri wanted a system that could efficiently cool and heat the building year-round.","og_url":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/","og_site_name":"The Construction Specifier","article_published_time":"2018-05-28T12:44:31+00:00","og_image":[{"width":1024,"height":683,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1.jpg","type":"image\/jpeg"}],"author":"Samantha Ashenhurst","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Samantha Ashenhurst","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/"},"author":{"name":"Samantha Ashenhurst","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/08c7087dff45ca0529eac7675313f4c7"},"headline":"Cooling down a century-old Missouri school with electric HVAC","datePublished":"2018-05-28T12:44:31+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/"},"wordCount":636,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1.jpg","keywords":["23 00 00\u2013Heating Ventilating and Air Conditioning","23 09 33\u2013Electric and Electronic Control System for HVAC","air distribution","Division 23","Energy efficiency","HVAC","Missouri","School"],"articleSection":["Form+Function","MasterFormat","23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/","url":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/","name":"Cooling down a century-old Missouri school with electric HVAC - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1.jpg","datePublished":"2018-05-28T12:44:31+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/05\/01_edit-1.jpg","width":1024,"height":683,"caption":"The old boiler system at St. Joseph School caused inconsistent temperatures throughout the building and the window units were loud. Photos \u00a9 Mitsubishi Electric"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/missouri-school-electric-hvac\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Cooling down a century-old Missouri school with electric HVAC"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/08c7087dff45ca0529eac7675313f4c7","name":"Samantha Ashenhurst","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/e9ba5e76cde0e7a193d6bc090976285aeddf1bb7bbaab73da8c8b642a5d494eb?s=96&d=mm&r=g","caption":"Samantha Ashenhurst"},"url":"https:\/\/www.constructionspecifier.com\/author\/sashenhurstkenilworth-com\/"}]}},"views":6679,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/62474","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4887"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=62474"}],"version-history":[{"count":7,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/62474\/revisions"}],"predecessor-version":[{"id":62484,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/62474\/revisions\/62484"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/62475"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=62474"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=62474"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=62474"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}