{"id":70528,"date":"2018-09-14T15:10:32","date_gmt":"2018-09-14T19:10:32","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=70528"},"modified":"2018-10-30T16:19:05","modified_gmt":"2018-10-30T20:19:05","slug":"pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/","title":{"rendered":"Pediatric mental health facility installs fusion-bonded ergonomic flooring"},"content":{"rendered":"<figure id=\"attachment_70534\" aria-describedby=\"caption-attachment-70534\" style=\"width: 340px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/pediatric.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-70534\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/pediatric.jpg\" alt=\"\" width=\"340\" height=\"226\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/pediatric.jpg 388w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/pediatric-300x199.jpg 300w\" sizes=\"auto, (max-width: 340px) 100vw, 340px\" \/><\/a><figcaption id=\"caption-attachment-70534\" class=\"wp-caption-text\">The upgraded design called for secure green spaces, natural light, and a bright color palette. <span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\"><em>Photo courtesy VTCC<\/em><\/span><\/figcaption><\/figure>\n<p>The specification of the design materials for the Virginia Treatment Center for Children (VTCC) required additional attention to safety, including the specification of ergonomic, hygienic flooring for in-patient rooms and the gymnasium. This pediatric mental health center is\u00a0located within the campus of the Children\u2019s Hospital of Richmond at Virginia Commonwealth University.<\/p>\n<p>\u201cWhen it comes to behavioral health facilities, it\u2019s important to reach a balance between comfort and safety in design,\u201d said Dr. Alexandria W. Lewis, Ed.D., executive director of the VTCC and team. \u201cWe wanted to create an atmosphere for the new facility that was not institutional but rather as home-like as possible.\u201d<\/p>\n<p>According to Dr. Lewis, the hospital had to consider low infection risk, durability, and comfort for children who may be barefoot or in socks. Enhanced acoustics also was a concern with a focus on quieting the interior space and reducing stress and anxiety related to noise.<\/p>\n<p>As a solution, the treatment center opted for flooring that featured 5 millimeters of recycled rubber backing fusion-bonded to a heterogeneous vinyl. The combination created a surface that may reduce the risk of injury associated with falls and offered sound control and comfort underfoot. \u00a0The cross-linked polyurethane reinforcement provided a low cost, polish-free maintenance regime for the lifetime of the product.<\/p>\n<p>To allow staff to evaluate the functionality of the flooring, a mock-up inpatient room was built and then tested by both the nursing and plant operations staff, with testers reporting it to be aesthetically pleasing and a vast improvement in comfort underfoot over the current floors. The product was then installed in all 32 patient rooms within the new facility.<\/p>\n<p>New heat-welded flooring was also installed in the 346 m\u00b2 (3,728 sf) VTCC gymnasium, which was designed with special inlays for children to play games like basketball and four square.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>The specification of the design materials for the Virginia Treatment Center for Children (VTCC) required additional attention to safety, including the specification of ergonomic, hygienic flooring for in-patient rooms and the gymnasium. This pediatric mental health center is\u00a0located within the campus of the Children\u2019s Hospital of Richmond at Virginia Commonwealth University.<\/p>\n","protected":false},"author":11326,"featured_media":70536,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4],"tags":[53,4876,3782,17,4875,4874,564,4873],"class_list":["post-70528","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","tag-acoustics","tag-childrens-hospital-of-richmond","tag-ergonomic","tag-flooring","tag-health-facility","tag-hygienic","tag-safety","tag-virginia-treatment-center-for-children","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Pediatric mental health facility installs fusion-bonded ergonomic flooring - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"The VTCC required additional attention to safety, including the specification of ergonomic, hygienic flooring for in-patient rooms and the gymnasium.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Pediatric mental health facility installs fusion-bonded ergonomic flooring - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"The VTCC required additional attention to safety, including the specification of ergonomic, hygienic flooring for in-patient rooms and the gymnasium.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2018-09-14T19:10:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-10-30T20:19:05+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/feat-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sarah Said\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sarah Said\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/\"},\"author\":{\"name\":\"Sarah Said\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/7d4e77e17457d3438733da3abaa626b1\"},\"headline\":\"Pediatric mental health facility installs fusion-bonded ergonomic flooring\",\"datePublished\":\"2018-09-14T19:10:32+00:00\",\"dateModified\":\"2018-10-30T20:19:05+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/\"},\"wordCount\":333,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/feat-1.jpg\",\"keywords\":[\"Acoustics\",\"Children's Hospital of Richmond\",\"ergonomic\",\"Flooring\",\"health facility\",\"hygienic\",\"Safety\",\"Virginia Treatment Center for Children\"],\"articleSection\":[\"Form+Function\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/\",\"name\":\"Pediatric mental health facility installs fusion-bonded ergonomic flooring - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/feat-1.jpg\",\"datePublished\":\"2018-09-14T19:10:32+00:00\",\"dateModified\":\"2018-10-30T20:19:05+00:00\",\"description\":\"The VTCC required additional attention to safety, including the specification of ergonomic, hygienic flooring for in-patient rooms and the gymnasium.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/feat-1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/09\\\/feat-1.jpg\",\"width\":600,\"height\":300},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Pediatric mental health facility installs fusion-bonded ergonomic flooring\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/7d4e77e17457d3438733da3abaa626b1\",\"name\":\"Sarah Said\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g\",\"caption\":\"Sarah Said\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/sarah_said\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Pediatric mental health facility installs fusion-bonded ergonomic flooring - The Construction Specifier","description":"The VTCC required additional attention to safety, including the specification of ergonomic, hygienic flooring for in-patient rooms and the gymnasium.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/","og_locale":"en_US","og_type":"article","og_title":"Pediatric mental health facility installs fusion-bonded ergonomic flooring - The Construction Specifier","og_description":"The VTCC required additional attention to safety, including the specification of ergonomic, hygienic flooring for in-patient rooms and the gymnasium.","og_url":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/","og_site_name":"The Construction Specifier","article_published_time":"2018-09-14T19:10:32+00:00","article_modified_time":"2018-10-30T20:19:05+00:00","og_image":[{"width":600,"height":300,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/feat-1.jpg","type":"image\/jpeg"}],"author":"Sarah Said","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sarah Said","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/"},"author":{"name":"Sarah Said","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/7d4e77e17457d3438733da3abaa626b1"},"headline":"Pediatric mental health facility installs fusion-bonded ergonomic flooring","datePublished":"2018-09-14T19:10:32+00:00","dateModified":"2018-10-30T20:19:05+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/"},"wordCount":333,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/feat-1.jpg","keywords":["Acoustics","Children's Hospital of Richmond","ergonomic","Flooring","health facility","hygienic","Safety","Virginia Treatment Center for Children"],"articleSection":["Form+Function"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/","url":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/","name":"Pediatric mental health facility installs fusion-bonded ergonomic flooring - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/feat-1.jpg","datePublished":"2018-09-14T19:10:32+00:00","dateModified":"2018-10-30T20:19:05+00:00","description":"The VTCC required additional attention to safety, including the specification of ergonomic, hygienic flooring for in-patient rooms and the gymnasium.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/feat-1.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/09\/feat-1.jpg","width":600,"height":300},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/pediatric-mental-health-facility-installs-fusion-bonded-ergonomic-flooring\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Pediatric mental health facility installs fusion-bonded ergonomic flooring"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/7d4e77e17457d3438733da3abaa626b1","name":"Sarah Said","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g","caption":"Sarah Said"},"url":"https:\/\/www.constructionspecifier.com\/author\/sarah_said\/"}]}},"views":3583,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/70528","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/11326"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=70528"}],"version-history":[{"count":3,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/70528\/revisions"}],"predecessor-version":[{"id":70535,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/70528\/revisions\/70535"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/70536"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=70528"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=70528"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=70528"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}