{"id":71661,"date":"2018-10-01T10:32:54","date_gmt":"2018-10-01T14:32:54","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=71661"},"modified":"2018-10-01T10:32:54","modified_gmt":"2018-10-01T14:32:54","slug":"portland-plans-500m-switch-to-filtered-water-supply","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/","title":{"rendered":"Portland plans $500M switch to filtered water supply"},"content":{"rendered":"<figure id=\"attachment_71667\" aria-describedby=\"caption-attachment-71667\" style=\"width: 330px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/portland.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-71667\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/portland.jpg\" alt=\"\" width=\"330\" height=\"219\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/portland.jpg 1024w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/portland-300x199.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/portland-768x510.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/portland-500x332.jpg 500w\" sizes=\"auto, (max-width: 330px) 100vw, 330px\" \/><\/a><figcaption id=\"caption-attachment-71667\" class=\"wp-caption-text\">According to David Peters, PWB\u2019s program director, public health and safety is the bureau&#8217;s top priority.<br \/><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\"><em>Photo courtesy Brown and Caldwell<\/em><\/span><\/figcaption><\/figure>\n<p>Brown and Caldwell, an environmental engineering and construction firm, has been awarded a contract to provide program management services for Portland Water Bureau\u2019s (PWB) $500-million Bull Run Filtration Project.<\/p>\n<p>PWB and its customers have relied on unfiltered water from the federally protected 264-m<sup>2<\/sup> (102-mi\u00b2) Bull Run Watershed as their primary source of water for more than a century.<\/p>\n<p>Traces of Cryptosporidium were found in the water supply and the revocation of PWB\u2019s treatment variance by the Oregon Health Authority (OHA), led to the design and construction of a complete new water treatment system.<\/p>\n<p>The program includes a filtration plant with capacity for up to 605 million litres (160 million gallons) per day and new appurtenances to connect to the existing supply system.<\/p>\n<p>Brown and Caldwell will lead pilot testing and project definition work to determine and optimize the preferred treatment system. The firm will also provide management and control of budget, schedule, and risk; and management and review of the work of design engineers and contractors.<\/p>\n<p>\u201cWe are honored to help the city of Portland responsibly deliver a water filtration system to reliably and sustainably serve generations to come,\u201d said Brown and Caldwell program manager Jon Holland. \u201cWe look forward to the opportunity to collaborate with PWB for this landmark project for the region.\u201d<\/p>\n<p>Following pilot testing and design, construction is expected to begin in late 2022, with the new facility operational by Sept. 30, 2027.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Brown and Caldwell, an environmental engineering and construction firm, has been awarded a contract to provide program management services for Portland Water Bureau\u2019s (PWB) $500-million Bull Run Filtration Project.<\/p>\n","protected":false},"author":11326,"featured_media":71666,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[3039,1222,4960,601,4961],"class_list":["post-71661","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-filtration","tag-plumbing","tag-portland-water-bureau","tag-sustainability","tag-water-treatment","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Portland plans $500M switch to filtered water supply - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"Brown and Caldwell has been awarded a contract to provide program management services for PWB&#039;s $500-million Bull Run Filtration Project.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Portland plans $500M switch to filtered water supply - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Brown and Caldwell has been awarded a contract to provide program management services for PWB&#039;s $500-million Bull Run Filtration Project.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-01T14:32:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/feat1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"300\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Sarah Said\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Sarah Said\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/\"},\"author\":{\"name\":\"Sarah Said\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/7d4e77e17457d3438733da3abaa626b1\"},\"headline\":\"Portland plans $500M switch to filtered water supply\",\"datePublished\":\"2018-10-01T14:32:54+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/\"},\"wordCount\":271,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/feat1.jpg\",\"keywords\":[\"Filtration\",\"Plumbing\",\"Portland Water Bureau\",\"Sustainability\",\"water treatment\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/\",\"name\":\"Portland plans $500M switch to filtered water supply - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/feat1.jpg\",\"datePublished\":\"2018-10-01T14:32:54+00:00\",\"description\":\"Brown and Caldwell has been awarded a contract to provide program management services for PWB's $500-million Bull Run Filtration Project.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/feat1.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/feat1.jpg\",\"width\":600,\"height\":300},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/portland-plans-500m-switch-to-filtered-water-supply\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Portland plans $500M switch to filtered water supply\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/7d4e77e17457d3438733da3abaa626b1\",\"name\":\"Sarah Said\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g\",\"caption\":\"Sarah Said\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/sarah_said\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Portland plans $500M switch to filtered water supply - The Construction Specifier","description":"Brown and Caldwell has been awarded a contract to provide program management services for PWB's $500-million Bull Run Filtration Project.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/","og_locale":"en_US","og_type":"article","og_title":"Portland plans $500M switch to filtered water supply - The Construction Specifier","og_description":"Brown and Caldwell has been awarded a contract to provide program management services for PWB's $500-million Bull Run Filtration Project.","og_url":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/","og_site_name":"The Construction Specifier","article_published_time":"2018-10-01T14:32:54+00:00","og_image":[{"width":600,"height":300,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/feat1.jpg","type":"image\/jpeg"}],"author":"Sarah Said","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Sarah Said","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/"},"author":{"name":"Sarah Said","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/7d4e77e17457d3438733da3abaa626b1"},"headline":"Portland plans $500M switch to filtered water supply","datePublished":"2018-10-01T14:32:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/"},"wordCount":271,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/feat1.jpg","keywords":["Filtration","Plumbing","Portland Water Bureau","Sustainability","water treatment"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/","url":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/","name":"Portland plans $500M switch to filtered water supply - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/feat1.jpg","datePublished":"2018-10-01T14:32:54+00:00","description":"Brown and Caldwell has been awarded a contract to provide program management services for PWB's $500-million Bull Run Filtration Project.","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/feat1.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/feat1.jpg","width":600,"height":300},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/portland-plans-500m-switch-to-filtered-water-supply\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Portland plans $500M switch to filtered water supply"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/7d4e77e17457d3438733da3abaa626b1","name":"Sarah Said","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/bce889938ec6d0d352bc138d6700d01fcfb8f966f41920aabfb49353c5be9a03?s=96&d=mm&r=g","caption":"Sarah Said"},"url":"https:\/\/www.constructionspecifier.com\/author\/sarah_said\/"}]}},"views":4262,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/71661","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/11326"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=71661"}],"version-history":[{"count":3,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/71661\/revisions"}],"predecessor-version":[{"id":71668,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/71661\/revisions\/71668"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/71666"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=71661"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=71661"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=71661"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}