{"id":73362,"date":"2018-10-22T13:53:41","date_gmt":"2018-10-22T17:53:41","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=73362"},"modified":"2018-10-22T13:53:41","modified_gmt":"2018-10-22T17:53:41","slug":"architectural-coating-extends-high-schools-concrete-look","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/","title":{"rendered":"Architectural coating extends high school\u2019s concrete look"},"content":{"rendered":"<figure id=\"attachment_73363\" aria-describedby=\"caption-attachment-73363\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Danvers3.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-73363 size-medium\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Danvers3-300x200.jpg\" alt=\"The architectural coating employed at Danvers High School in Massachusetts delivers a color that mirrors concrete. Photo courtesy Dinisco Design Partnership\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Danvers3-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Danvers3-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Danvers3-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Danvers3.jpg 900w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-73363\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The architectural coating employed at Danvers High School in Massachusetts delivers a color that mirrors concrete. <br \/><em>Photo courtesy Dinisco Design Partnership<\/em><\/span><\/figcaption><\/figure>\n<p>When <a href=\"https:\/\/danverspublicschools.org\/dhs\/\" target=\"_blank\" rel=\"noopener\">Danvers High School<\/a> in Massachusetts embarked on a $70.9-million renovation and expansion project, staying within the budget and on schedule were at the top of its priority list. The project scope included building a renovated three-story academic wing, a new science lab, entranceway, cafeteria, and library with significant renovations to the field house and auditorium.<\/p>\n<p>The first floor of the three-story academic building was clad with insulated precast concrete panels to provide a new \u2018skin\u2019 for the structure. Expanding the precast to the upper two stories was too expensive, so the architects looked to metal paneling to provide the look and feel they desired.<\/p>\n<p>\u201cThe metal panels were used to carry the color and look of the precast concrete to the second and third floors of the existing building, where installing precast concrete would have been more expensive,\u201d explained James Shuttleworth, project architect and associate at <a href=\"http:\/\/www.dinisco.com\/\" target=\"_blank\" rel=\"noopener\">Dinisco Design Partnership<\/a> of Boston.<\/p>\n<p>The upper two stories were clad with insulated metal panels (IMPs) and coated with 70 percent polyvinylidene fluoride (PVDF) architectural coating in gray and white colors. The coil coatings were chosen because they could match the color of the precast concrete panels as well as offer a solution that was affordable. Additionally, the coatings are resistant to dirt, stains, and fading. Not only did the gray coating extend the visual line of the first-floor precast concrete elements, but the white color also added an accent to the architectural trim and building as a whole.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>When Danvers High School in Massachusetts embarked on a $70.9-million renovation and expansion project, staying within the budget and on schedule were at the top of its priority list. The first floor of the three-story academic building was clad with insulated precast concrete panels to provide a new \u2018skin\u2019 for the structure. Expanding the precast to the upper two stories was too expensive, so the architects looked to metal paneling to provide the look and feel they desired.<\/p>\n","protected":false},"author":4183,"featured_media":73364,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,449,183,240,189,285,287,489,460],"tags":[550,752,4804,2393,3064,3342],"class_list":["post-73362","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-uniformat","category-03-00-00-concrete","category-03-40-00-precast-concrete","category-09-00-00-finishes","category-09-70-00-wall-finishes","category-09-90-00-painting-and-coating","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-coatings","tag-concrete","tag-institutional-architecture","tag-insulated-metal-panels","tag-massachusetts","tag-metals","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Architectural coating extends high school\u2019s concrete look - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Architectural coating extends high school\u2019s concrete look - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"When Danvers High School in Massachusetts embarked on a $70.9-million renovation and expansion project, staying within the budget and on schedule were at the top of its priority list. The first floor of the three-story academic building was clad with insulated precast concrete panels to provide a new \u2018skin\u2019 for the structure. Expanding the precast to the upper two stories was too expensive, so the architects looked to metal paneling to provide the look and feel they desired.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2018-10-22T17:53:41+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Featured-5.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"nithya_caleb\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"nithya_caleb\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/\"},\"author\":{\"name\":\"nithya_caleb\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b98ef8acdc4f61ec3c542bdb863ee469\"},\"headline\":\"Architectural coating extends high school\u2019s concrete look\",\"datePublished\":\"2018-10-22T17:53:41+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/\"},\"wordCount\":281,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/Featured-5.jpg\",\"keywords\":[\"Coatings\",\"Concrete\",\"Institutional Architecture\",\"Insulated Metal Panels\",\"Massachusetts\",\"Metals\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"UniFormat\",\"03 00 00 Concrete\",\"03 40 00 Precast Concrete\",\"09 00 00 Finishes\",\"09 70 00 Wall Finishes\",\"09 90 00 Painting and Coating\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/\",\"name\":\"Architectural coating extends high school\u2019s concrete look - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/Featured-5.jpg\",\"datePublished\":\"2018-10-22T17:53:41+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/Featured-5.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/10\\\/Featured-5.jpg\",\"width\":600,\"height\":400},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/architectural-coating-extends-high-schools-concrete-look\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Architectural coating extends high school\u2019s concrete look\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b98ef8acdc4f61ec3c542bdb863ee469\",\"name\":\"nithya_caleb\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"caption\":\"nithya_caleb\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/nithya_caleb\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Architectural coating extends high school\u2019s concrete look - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/","og_locale":"en_US","og_type":"article","og_title":"Architectural coating extends high school\u2019s concrete look - The Construction Specifier","og_description":"When Danvers High School in Massachusetts embarked on a $70.9-million renovation and expansion project, staying within the budget and on schedule were at the top of its priority list. The first floor of the three-story academic building was clad with insulated precast concrete panels to provide a new \u2018skin\u2019 for the structure. Expanding the precast to the upper two stories was too expensive, so the architects looked to metal paneling to provide the look and feel they desired.","og_url":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/","og_site_name":"The Construction Specifier","article_published_time":"2018-10-22T17:53:41+00:00","og_image":[{"width":600,"height":400,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Featured-5.jpg","type":"image\/jpeg"}],"author":"nithya_caleb","twitter_card":"summary_large_image","twitter_misc":{"Written by":"nithya_caleb","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/"},"author":{"name":"nithya_caleb","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b98ef8acdc4f61ec3c542bdb863ee469"},"headline":"Architectural coating extends high school\u2019s concrete look","datePublished":"2018-10-22T17:53:41+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/"},"wordCount":281,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Featured-5.jpg","keywords":["Coatings","Concrete","Institutional Architecture","Insulated Metal Panels","Massachusetts","Metals"],"articleSection":["Form+Function","MasterFormat","UniFormat","03 00 00 Concrete","03 40 00 Precast Concrete","09 00 00 Finishes","09 70 00 Wall Finishes","09 90 00 Painting and Coating","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/","url":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/","name":"Architectural coating extends high school\u2019s concrete look - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Featured-5.jpg","datePublished":"2018-10-22T17:53:41+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Featured-5.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/10\/Featured-5.jpg","width":600,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/architectural-coating-extends-high-schools-concrete-look\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Architectural coating extends high school\u2019s concrete look"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b98ef8acdc4f61ec3c542bdb863ee469","name":"nithya_caleb","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","caption":"nithya_caleb"},"url":"https:\/\/www.constructionspecifier.com\/author\/nithya_caleb\/"}]}},"views":4284,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/73362","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4183"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=73362"}],"version-history":[{"count":1,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/73362\/revisions"}],"predecessor-version":[{"id":73365,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/73362\/revisions\/73365"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/73364"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=73362"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=73362"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=73362"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}