{"id":78005,"date":"2018-12-27T12:59:22","date_gmt":"2018-12-27T17:59:22","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=78005"},"modified":"2018-12-28T09:28:43","modified_gmt":"2018-12-28T14:28:43","slug":"evolving-elevator-hoistway-codes-and-standards","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/","title":{"rendered":"Evolving elevator hoistway codes and standards"},"content":{"rendered":"<figure id=\"attachment_78006\" aria-describedby=\"caption-attachment-78006\" style=\"width: 357px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-199801186.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-78006\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-199801186-300x169.jpg\" alt=\"Photos \u00a9 BigStockPhoto.com\" width=\"357\" height=\"201\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-199801186-300x169.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-199801186-768x432.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-199801186-500x281.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-199801186.jpg 800w\" sizes=\"auto, (max-width: 357px) 100vw, 357px\" \/><\/a><figcaption id=\"caption-attachment-78006\" class=\"wp-caption-text\"><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photos \u00a9 BigStockPhoto.com<\/span><\/em><\/figcaption><\/figure>\n<p><strong>by David Dawdy<\/strong><\/p>\n<p>Fire and life safety is a major concern for high-rise office workers, apartment and condominium dwellers, building owners, and the architectural community around the world. From decades of disaster movies to real-life stories from survivors of tower fires and terrorist attacks, the threat of catastrophe is a sobering reminder fighting high-rise structure fires is a difficult and often perilous task. Recent tragedies like Grenfell Tower in London, England, the 2017 Honolulu high-rise fire and the Torch Tower in Dubai, UAE, punctuate this reality.<\/p>\n<p>While the spread of fire and flames is commonly perceived to be the biggest threat to human safety in these types of situations, smoke and toxic gas often pose an even greater danger for building occupants. High-rise structures typically include multiple stairways and internal elevator shafts. These enclosures and hoistways can act like a chimney or flue in a fire, allowing smoke to infiltrate otherwise safe floors of commercial and residential buildings.<\/p>\n<p>Despite being protected by fire-rated, car-mounted doors, hoistway shaft openings are especially dangerous, allowing hot smoke and products of combustion to infiltrate the area and potentially spreading gases throughout a multifloor building in a matter of minutes. The ability of smoke and hot gases to migrate quickly through unobstructed vertical shafts can result in smoke inhalation and death for those trapped on seemingly untouched or \u2018safe\u2019 floors above the fire.<\/p>\n<p>To address smoke migration, the <em>International Building Code<\/em> (<em>IBC<\/em>)\u2014beginning in 2000\u2014required elevator lobbies to be constructed as smoke enclosures to encapsulate hoistway openings on every floor of a high-rise building. Swinging doors\u2014at the entrance to an elevator lobby\u2014are activated during a fire event to close and seal the space, thereby minimizing smoke and gas infiltration. Elevator lobbies have made a tremendous impact on occupant safety, but they also come with significant design and facility planning drawbacks.<\/p>\n<p><em>IBC<\/em> eventually approved the use of coiling fabric or film closures for hoistway openings meeting Underwriters Laboratories (UL) 1784, <em>Smoke and Draft Control Door Assemblies,<\/em> requirements in 2003. Manufacturers also began to develop new and exciting alternatives to elevator lobbies at the hoistway opening.<\/p>\n<p>The use of special coiling smoke doors as hoistway enclosures has quietly become mainstream in the design community. Standards from the National Fire Protection Association (NFPA) continue to evolve to include new opportunities with regard to smoke and fire infiltration in commercial buildings.<\/p>\n<p>Whether discussing traditional elevator lobbies or newer products, it is important to understand these developing standards of elevator smoke enclosures and their impact on architects, designers, facility managers, and, ultimately, building occupants.<\/p>\n<figure id=\"attachment_78007\" aria-describedby=\"caption-attachment-78007\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-lobby-in-a-modern-building-17447168.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-78007\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-lobby-in-a-modern-building-17447168-300x225.jpg\" alt=\"Thanks to advances in coiling fabric and film closures for hoistway openings, architects have new opportunities for designing open-concept spaces.\" width=\"300\" height=\"225\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-lobby-in-a-modern-building-17447168-300x225.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-lobby-in-a-modern-building-17447168-768x576.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-lobby-in-a-modern-building-17447168-500x375.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-lobby-in-a-modern-building-17447168.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-78007\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Thanks to advances in coiling fabric and film closures for hoistway openings, architects have new opportunities for designing open-concept spaces.<\/span><\/figcaption><\/figure>\n<p><strong>Option for the design community<\/strong><\/p>\n<p><em>IBC<\/em> 2015, Section 3006.2, \u201cHoistway Opening Protection Required,\u201d states:<\/p>\n<p><span style=\"font-family: 'courier new', courier, monospace;\">Elevator hoistway door openings shall be protected in accordance with Section 3006.3, where an elevator hoistway connects more than three stories, is required to be enclosed within a shaft enclosure&#8230;<\/span><\/p>\n<p>Hoistway closures are seen by the overhead door community as specialty products surrounded by a significant degree of mystery, misinformation, and misunderstanding. There are a number of reasons for this, including:<\/p>\n<ul>\n<li>unfamiliarity with code standards;<\/li>\n<li>minimal understanding of the system\u2019s functional requirements compared to traditional fire doors; and<\/li>\n<li>limited access to training necessary to acquire this knowledge of hoistway closures.<\/li>\n<\/ul>\n<p>In the world of doors, however, specialty is good, and knowledge is even better. Armed with these two essential tools, product manufacturers and door dealers can be more instrumental in fire and life safety awareness, education, and problem solving.<\/p>\n<p>The first major development in this product\u2019s acceptance came several years ago when <em>IBC<\/em> approved the use of coiling fabric or film closures for hoistway openings (For more information, one can refer to Section 713, \u201cShaft Enclosures,\u201d of the<em> International Building Code <\/em>[<em>IBC<\/em>]<em>.<\/em>).\u00a0As a result, the employment of these products\u2014for creating additional square footage and more spacious designs in lieu of constructing elevator lobbies\u2014has become popular in the design community.<\/p>\n<p>Elevator lobbies can decrease leasable\/usable floor space for building owners and constrain more spacious area designs. In today\u2019s world of open-concept design, elevator lobbies are often incongruent to the overall conceptual vision, according to Gregory Cahanin, fire-protection engineer and code consultant.<\/p>\n<p>Newer sliding-type fire doors complying with smoke and draft requirements are frequently allowed as an alternative to building lobbies. In some applications, accordion-type doors are also employed to seal banks of hoistways. Rolling steel fire doors are specifically not allowed. However, they may be used on lobby designs that also include listed swing doors providing personal egress.<\/p>\n<p>If this sounds confusing, it is. Evolving standards from the International Code Council (ICC) and NFPA mean new alternative products meeting intended performance criteria\u2014which are probably more cost-effective\u2014may become available.<\/p>\n<p>Modern elevator hoistway closures range from semitransparent film-type materials to woven, coated fiberglass products. The design intent is to seal hoistway openings to prevent smoke migration during a fire, allow for through-passage of car occupants, and to reseal the opening if opened during an alarm for access.<\/p>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_78008\" aria-describedby=\"caption-attachment-78008\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-Marble-And-Wooden-Elevator-Hal-204408244.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-78008\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-Marble-And-Wooden-Elevator-Hal-204408244-300x200.jpg\" alt=\"Trends in commercial design point toward the continued popularity of open-concept spaces. Due to advances in coiling fabric or film closures for hoistway openings, designers have fewer constraints like elevator lobbies.\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-Marble-And-Wooden-Elevator-Hal-204408244-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-Marble-And-Wooden-Elevator-Hal-204408244-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-Marble-And-Wooden-Elevator-Hal-204408244-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-Marble-And-Wooden-Elevator-Hal-204408244.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-78008\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Trends in commercial design point toward the continued popularity of open-concept spaces. Due to advances in coiling fabric or film closures for hoistway openings, designers have fewer constraints like elevator lobbies.<\/span><\/figcaption><\/figure>\n<p><strong>Different elevators, different standards<\/strong><\/p>\n<p>Since the first steam-powered lifts of the industrial revolution to high-speed elevator cars, vertical transportation has made life more convenient for riders around the world. It has also evolved to meet specific needs of building owners, occupants, and first responders.<\/p>\n<p>Public passenger elevators are installed to serve all floors of a building or may have separate banks targeting exclusive floors, which requires multiple lobbies to protect the hoistway from the migration of smoke and other products of combustion. These are a good target for hoistway closures since they do not require the construction of lobbies in the design.<\/p>\n<p>When public elevators need to be used for emergency evacuation, hoistway smoke closures are still an appropriate use based on 2015 <em>IBC<\/em> Section 713.14.1, \u201cElevator, Dumbwaiter and Other Hoistways,\u201d which states:<\/p>\n<p><span style=\"font-family: 'courier new', courier, monospace;\">Enclosed elevator lobbies are not required where additional doors are provided at the hoistway opening\u2026when tested in accordance with UL 1784 without an artificial bottom seal.<\/span><\/p>\n<p>There are some <em>IBC<\/em> codes and sections architects and designers must be aware of, including Section 403.6.2, \u201cOccupant Evacuation Elevators:\u201d<\/p>\n<p><span style=\"font-family: 'courier new', courier, monospace;\">Where installed in accordance with Section 3008, passenger elevators for general public use shall be permitted to be used for occupant self-evacuation. Where elevators are to be used for occupant self-evacuation during fires, all passenger elevators for general public use shall comply with Section 3008 (10 sections).<\/span><\/p>\n<figure id=\"attachment_78009\" aria-describedby=\"caption-attachment-78009\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-141724121.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-78009\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-141724121-300x180.jpg\" alt=\"Coiling fabric or film closures for hoistway openings provide architects and designers with new possibilities while ensuring the safety of building occupants. This includes limiting the spread of smoke and toxic gases during a fire event.\" width=\"300\" height=\"180\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-141724121-300x180.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-141724121-768x461.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-141724121-500x300.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-141724121.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-78009\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Coiling fabric or film closures for hoistway openings provide architects and designers with new possibilities while ensuring the safety of building occupants. This includes limiting the spread of smoke and toxic gases during a fire event.<\/span><\/figcaption><\/figure>\n<p>Since these types of elevators are intended to be occupant operated during evacuation periods, they must be in a \u2018hardened\u2019 shaft with a one-hour fire resistance rating up to four stories and two-hour rating above four stories. Additionally, occupant evacuation elevators require lobbies at all floors except the level of discharge, meaning there is no code provision for hoistway closures.<\/p>\n<p>Unlike public passenger and occupant evacuation elevators, fire service access elevators (FSAEs) provide a capable and durable hoistway with the ability to operate for extended periods during a fire to aid fire fighters and emergency responders in assistance and rescue efforts for all occupied floors. FSAEs must serve all floors.<\/p>\n<p>In buildings with an occupied floor more than 36.5 m (120 ft) above the lowest level of fire department vehicle access, no fewer than two FSAEs\u2014or all elevators, whichever is less\u2014shall be provided in accordance with Section 3007, \u201cFire Service Access Elevators.\u201d Each FSAE shall also have a capacity of not less than 1587.5 kg (3500 lb), shall comply with Section 3002.4, \u201cElevator Car to Accommodate Ambulance Stretcher,\u201d and must accommodate an ambulance stretcher.<\/p>\n<p>Similar to evacuation elevators, FSAEs must be in a \u2018hardened\u2019 shaft with a one-hour fire resistance rating to four stories and two-hour rating above four stories. Typically, at least one FSAE is the building service elevator and usually runs in a separate hoistway core from public or occupant evacuation elevators. In buildings with the FSAE requirement, a second elevator can be designated as FSAE\u2014this may be another FSAE or a public elevator.<\/p>\n<p>FSAEs are also required to have an elevator lobby from the second floor up as long as the floor of discharge is sprinklered. Therefore, hoistway seals are not required in 2015 <em>IBC<\/em> 709.4.2, \u201cSmoke-barrier Walls Enclosing Areas of Refuge or Elevator Lobbies,\u201d within FSAE lobbies.<\/p>\n<p>Elevator lobbies are also not required where the elevator serves open parking garages per Section 406.5, \u201cOpen Parking Garages.\u201d They are not required at levels of discharge as long as this level is equipped with an automatic sprinkler system and wherever the hoistways open to the exterior.<\/p>\n<p><!--nextpage--><\/p>\n<figure id=\"attachment_78010\" aria-describedby=\"caption-attachment-78010\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-interior-of-modern-elevator-ha-210740713.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-78010\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-interior-of-modern-elevator-ha-210740713-300x200.jpg\" alt=\"The use of elevator lobbies as smoke enclosures has long been a required form of protection from smoke migration through hoistway shafts. Listed swing doors typically seal the space, minimizing infiltration.\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-interior-of-modern-elevator-ha-210740713-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-interior-of-modern-elevator-ha-210740713-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-interior-of-modern-elevator-ha-210740713-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/bigstock-interior-of-modern-elevator-ha-210740713.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-78010\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The use of elevator lobbies as smoke enclosures has long been a required form of protection from smoke migration through hoistway shafts. Listed swing doors typically seal the space, minimizing infiltration.<\/span><\/figcaption><\/figure>\n<p><strong>Merging NFPA and <em>IBC<\/em> standards<\/strong><\/p>\n<p>While understanding the unique needs and <em>IBC<\/em> code requirements for different types of elevators and hoistways is fundamental, there is more than one organization. The NFPA is a global nonprofit organization, established in 1896 and devoted to eliminating:<\/p>\n<ul>\n<li>death;<\/li>\n<li>injury; and<\/li>\n<li>property and economic loss caused by fire, electrical, and related hazards.<\/li>\n<\/ul>\n<p>Virtually every building, process, service, design, and installation is affected by NFPA\u2019s codes and standards\u2014more than 300\u2014and the organization has made significant progress in the area of smoke and fire protection with regard to elevator hoistway closures in commercial buildings.<\/p>\n<p>This includes acceptance testing after installation as well as annual inspection, maintenance, and testing. New standards have been developed specifically for hoistway closures by NFPA 80, <em>Standard for <\/em><em>Fire Doors and Other Opening Protectives<\/em>, technical committee and will be available in their upcoming publication.<\/p>\n<p><em>Acceptance testing<\/em><\/p>\n<p>Per NFPA 80 (Section 5.2.3, \u201cAcceptance Testing\u201d), acceptance testing of \u201csmoke protective curtain assemblies\u201d for hoistways must be performed by a qualified person with knowledge and understanding of the operating components of the assembly type. Before any testing occurs, a visual inspection needs to be performed to identify any damaged, field-modified, or missing parts that can create a hazard during operation or resetting.<\/p>\n<p>Additionally, there are a number of items requiring verification during this stage, including:<\/p>\n<ul>\n<li>labels;<\/li>\n<li>mounting and assembly components;<\/li>\n<li>hoistway smoke detectors; and<\/li>\n<li>auxiliary hardware.<\/li>\n<\/ul>\n<p>NFPA standards also require potential hoistway enclosures to have an average closing speed of no less than 152 mm (6 in.) per second or no more than 610 mm (24 in.) per second.<\/p>\n<p><em>Installation<\/em><\/p>\n<p>The organization mandates hoistway enclosures be installed in accordance with their listed manufacturer installation instructions. Naturally, they shall also be in accordance with American Society of Mechanical Engineers (ASME) A17.1, <em>Standard for Elevators and Escalators<\/em>.<\/p>\n<p><em>Operational testing<\/em><\/p>\n<p>Following installation, operational and drop testing is required in accordance with NFPA 80 Section 5.2.3, with all inspections and testing signed by a witness and kept for inspection by the authority having jurisdiction (AHJ) for the life of the assembly.<\/p>\n<p><em>Periodic testing<\/em><\/p>\n<p>Periodic testing is mandatory. Facility managers are required to have inspection and drop testing performed annually. This testing includes all of the items noted in NFPA 80, Section 5.2.4 \u201cPeriodic Inspection and Testing,\u201d comprising visual inspection, operational evaluation, drop test, and system reset (including any emergency power sources).<\/p>\n<p><em>Maintenance<\/em><\/p>\n<p>When specific maintenance actions are required, repairs and work are the owner or property managers\u2019 responsibility, and must be completed without delay. Only qualified professionals should make the repairs. If the unit is beyond repair or the original manufacturer\u2019s parts are not available, the entire assembly or appurtenance must be replaced.<\/p>\n<p><strong>Conclusion<\/strong><\/p>\n<p>For nearly five decades, the fire protection industry has looked at fire and smoke spread in tall buildings and sought code-based solutions. The use of fire sprinklers to control fire spread and smoke generation in high-rise buildings has reduced both property and life loss. When sprinklers are present, smoke has become the recognized killer in high-rise fires\u2014its upward migration from a lower floor has become a greater threat to occupants than the fire itself. Innovation in compartmentation of the vertical openings of elevator shafts has evolved from the creation of lobbies to isolating the shaft at door openings on each floor.<\/p>\n<p>The changes in fire and building codes are a result of the door industry looking to help solve the fire problem in high-rise buildings by employing innovative products at elevator openings. The integration of new materials into mechanical closure systems with the ability to withstand heat exposure from a fire has progressed rapidly in the last decade. The resulting win-win gives designers and building owners more cost-effective choices in the use of space that was once reserved for elevator lobbies.<\/p>\n<p>To learn more, consult NFPA or ICC or contact a product manufacturer that has a specialization in hoistway enclosures.<\/p>\n<p><em>David Dawdy, director of fire and life safety\u2013new product development at CornellCookson, is a 35-year veteran of the overhead door industry. He is a fire protection code and standards specialist and trainer of Institute of Door Dealer Education and Accreditation\u2019s (IDEA\u2019s) Rolling Door Certification. Dawdy is a member of Door and Access Systems Manufacturers Association\u2019s (DASMA\u2019s) technical committee for rolling doors and windows, National Fire Protection Association (NFPA) 80, Standard for Fire Doors and Other Opening Protectives, technical committee, and Underwriters Laboratories (UL) standards technical committee. He attends the International Code Council (ICC) hearings as an advocate of fire protection standards. Dawdy also serves on the board of directors for the International Door Association (IDA) and chairs its technical and education committee. He can be reached at <a href=\"mailto:David.Dawdy@cornellcookson.com\" target=\"_blank\" rel=\"noopener\">David.Dawdy@cornellcookson.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>The use of special coiling smoke doors as hoistway enclosures has quietly become mainstream in the design community. However, standards are still evolving to include new opportunities with regard to smoke and fire infiltration in commercial buildings.<\/p>\n","protected":false},"author":4183,"featured_media":78011,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,188,274,194,319,500,502,462],"tags":[5188,1198,3236,5189,3741,1777,5190,3866,2051],"class_list":["post-78005","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-08-00-00-openings","category-08-30-00-specialty-doors-and-frames","category-14-00-00-conveying-equipment","category-14-20-00-elevators","category-c1010interior-partitions","category-c1030interior-doors","category-c10interior-construction","tag-coiling-smoke-doors","tag-division-08","tag-division-14","tag-elevator-lobbies","tag-elevators","tag-fire-protection","tag-hoistways","tag-international-code-council","tag-national-fire-protection-association","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Evolving elevator hoistway codes and standards - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Evolving elevator hoistway codes and standards - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"The use of special coiling smoke doors as hoistway enclosures has quietly become mainstream in the design community. However, standards are still evolving to include new opportunities with regard to smoke and fire infiltration in commercial buildings.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2018-12-27T17:59:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-12-28T14:28:43+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/featured-3.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"711\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"nithya_caleb\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"nithya_caleb\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"12 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/\"},\"author\":{\"name\":\"nithya_caleb\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b98ef8acdc4f61ec3c542bdb863ee469\"},\"headline\":\"Evolving elevator hoistway codes and standards\",\"datePublished\":\"2018-12-27T17:59:22+00:00\",\"dateModified\":\"2018-12-28T14:28:43+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/\"},\"wordCount\":2311,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/12\\\/featured-3.jpg\",\"keywords\":[\"Coiling smoke doors\",\"Division 08\",\"Division 14\",\"Elevator lobbies\",\"elevators\",\"Fire Protection\",\"Hoistways\",\"International Code Council\",\"National Fire Protection Association\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"08 00 00 Openings\",\"08 30 00 Specialty Doors and Frames\",\"14 00 00 Conveying Equipment\",\"14 20 00 Elevators\",\"C1010\u2212Interior Partitions\",\"C1030\u2212Interior Doors\",\"C10\u2212Interior Construction\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/\",\"name\":\"Evolving elevator hoistway codes and standards - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/12\\\/featured-3.jpg\",\"datePublished\":\"2018-12-27T17:59:22+00:00\",\"dateModified\":\"2018-12-28T14:28:43+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/evolving-elevator-hoistway-codes-and-standards\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/12\\\/featured-3.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2018\\\/12\\\/featured-3.jpg\",\"width\":711,\"height\":400},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b98ef8acdc4f61ec3c542bdb863ee469\",\"name\":\"nithya_caleb\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"caption\":\"nithya_caleb\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/nithya_caleb\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Evolving elevator hoistway codes and standards - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/","next":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/2\/","og_locale":"en_US","og_type":"article","og_title":"Evolving elevator hoistway codes and standards - The Construction Specifier","og_description":"The use of special coiling smoke doors as hoistway enclosures has quietly become mainstream in the design community. However, standards are still evolving to include new opportunities with regard to smoke and fire infiltration in commercial buildings.","og_url":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/","og_site_name":"The Construction Specifier","article_published_time":"2018-12-27T17:59:22+00:00","article_modified_time":"2018-12-28T14:28:43+00:00","og_image":[{"width":711,"height":400,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/featured-3.jpg","type":"image\/jpeg"}],"author":"nithya_caleb","twitter_card":"summary_large_image","twitter_misc":{"Written by":"nithya_caleb","Est. reading time":"12 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/"},"author":{"name":"nithya_caleb","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b98ef8acdc4f61ec3c542bdb863ee469"},"headline":"Evolving elevator hoistway codes and standards","datePublished":"2018-12-27T17:59:22+00:00","dateModified":"2018-12-28T14:28:43+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/"},"wordCount":2311,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/featured-3.jpg","keywords":["Coiling smoke doors","Division 08","Division 14","Elevator lobbies","elevators","Fire Protection","Hoistways","International Code Council","National Fire Protection Association"],"articleSection":["Features","MasterFormat","UniFormat","08 00 00 Openings","08 30 00 Specialty Doors and Frames","14 00 00 Conveying Equipment","14 20 00 Elevators","C1010\u2212Interior Partitions","C1030\u2212Interior Doors","C10\u2212Interior Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/","url":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/","name":"Evolving elevator hoistway codes and standards - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/featured-3.jpg","datePublished":"2018-12-27T17:59:22+00:00","dateModified":"2018-12-28T14:28:43+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/evolving-elevator-hoistway-codes-and-standards\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/featured-3.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2018\/12\/featured-3.jpg","width":711,"height":400},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b98ef8acdc4f61ec3c542bdb863ee469","name":"nithya_caleb","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","caption":"nithya_caleb"},"url":"https:\/\/www.constructionspecifier.com\/author\/nithya_caleb\/"}]}},"views":31690,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/78005","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4183"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=78005"}],"version-history":[{"count":2,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/78005\/revisions"}],"predecessor-version":[{"id":78060,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/78005\/revisions\/78060"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/78011"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=78005"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=78005"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=78005"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}