{"id":80699,"date":"2019-02-06T09:41:20","date_gmt":"2019-02-06T14:41:20","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=80699"},"modified":"2019-02-06T09:41:20","modified_gmt":"2019-02-06T14:41:20","slug":"the-mark-where-design-innovation-preserves-history","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/","title":{"rendered":"The Mark: Where design innovation preserves history"},"content":{"rendered":"<p><strong>by Allyn Stellmacher, AIA, LEED AP,\u00a0 and John Worley, SE, LEED AP<\/strong><\/p>\n<figure id=\"attachment_80707\" aria-describedby=\"caption-attachment-80707\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-80707\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou-300x200.jpg\" alt=\"Photos \u00a9 Connie Zhou\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-80707\" class=\"wp-caption-text\"><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photos \u00a9 Connie Zhou<\/span><\/em><\/figcaption><\/figure>\n<p>In the design of the Mark, a new 48-story commercial office and hotel tower in downtown Seattle, the owner and developer held the rights to demolish a historically significant church on the site, allowing for the development of a half-block footprint. However, the emotional, cultural, and also historic significance of the old church\u2014a facility commissioned by Arthur Denny, founding father of the city of Seattle\u2014motivated the client and local parishioners to <a href=\"http:\/\/www.zgf.com\/project\/daniels-real-estate-the-mark\" target=\"_blank\" rel=\"noopener\">seek alternatives<\/a>.<\/p>\n<p>Working closely with Daniels Real Estate, <a href=\"http:\/\/www.zgf.com\/project\/daniels-real-estate-the-mark\" target=\"_blank\" rel=\"noopener\">ZGF Architects<\/a> looked at numerous design configurations to preserve and celebrate the downtown site while developing a contemporary office building, now one of the city\u2019s first quarter-block towers constructed under downtown zoning. Ultimately, the church\u2019s preservation and its incorporation into the new development yielded a sustainable solution. This shared commitment and sensitivity to context allowed the structure to be restored for future community use as an event space, now aptly named the Sanctuary, as well as to maintain the character and history of the block, which also includes the iconic Rainier Club building.<\/p>\n<p><strong>Form and structure<\/strong><\/p>\n<p>Numerous schemes were initially evaluated for the ability to integrate form, structure, function, and sensitivity to the historic Sanctuary. The design team narrowed the field to three possibilities, including curved, canted, and faceted fa\u00e7ades. A faceted scheme was selected and further developed to optimize building height, configuration, and floor-plate efficiency, while responding to the owner\u2019s vision for an iconic addition to downtown Seattle\u2019s skyline. Amid a historic building boom in the city, the 69,677-m<sup>2<\/sup> (750,000-sf) high-rise is distinguished by the diagonal steel braces dividing its planes. The faceted scheme is part of a structural system that shifts the load away from the building core and to the exterior walls, thereby eliminating view-obstructing elements like internal columns and reducing the core size to create more efficient floor plates.<\/p>\n<figure id=\"attachment_80710\" aria-describedby=\"caption-attachment-80710\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-5-Connie-Zhou.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-80710\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-5-Connie-Zhou-300x200.jpg\" alt=\"The faceted scheme, with fewer lateral elements configured at open angles, eliminates view-obstructing elements like columns and has created more floor-plate efficiency by reducing the building\u2019s core size.\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-5-Connie-Zhou-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-5-Connie-Zhou-768x513.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-5-Connie-Zhou-500x334.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-5-Connie-Zhou.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-80710\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The faceted scheme, with fewer lateral elements configured at open angles, eliminates view-obstructing elements like columns and has created more floor-plate efficiency by reducing the building\u2019s core size.<\/span><\/figcaption><\/figure>\n<p>With just 1394 m<sup>2<\/sup> (15,000 sf) of space available on level one of the Mark, floor area had to expand on subsequent floors to maximize leasing potential. Through a joint development agreement with the Rainier Club, over-under property rights were utilized. As a result, the tower subtly slopes over the existing historic structures\u2014with the lower northwest corner cantilevering over the block by more than 6 m (20 ft)\u2014before tapering back through a sequence of triangulated building planes.<\/p>\n<p>The structural lateral system consists of concrete shearwalls around the elevator core and perimeter steel bracing. The perimeter brace system was inspired by and integrated with the architecture of the building, with the braces following the facets in the fa\u00e7ade and forming the edge of each folded plate. This allowed for open, configurable floor plates. The lateral stability of a tower like this is often provided by only a central concrete core, but the combined perimeter brace and concrete core system allowed for the core to be only as big as needed to house the building\u2019s 12 elevators. This allowed the project team to maximize the building\u2019s usable floor space and achieve the requisite lateral stiffness with minimal visual intrusion.<\/p>\n<p>In looking at various frame configurations, the most architecturally satisfying solution was to cross each face of the building with three major diagonal brace elements meeting at key corner points.<\/p>\n<p>These \u2018megabraces\u2019 form the edges of jewel-like facets, with planes angled to create an expanding floor plate over the building height. Most of the exterior columns are canted up to six degrees to support the floor plates, which increase in size through the 18<sup>th<\/sup> floor and then vary in shape on the higher levels. Diagonal lines meet at corner points on levels 16 and 28\u2014the latter has the largest floor plate. In order for forces to be transferred between the megabraces and floor diaphragms, the braces meet the floor at the same point, above and below brace intersections where a column or another brace meets the floor (select levels only), to smoothly move loads to the ground.<\/p>\n<p>At these select floors, referred to as nodal floors, lateral earthquake load gets transferred from the floor slabs to the perimeter brace system. At the internodal floors, the concrete core shearwalls resist the lateral earthquake force from the floors and transfer the force upward and downward to the nodal floor levels and then into the perimeter brace system. The geometry of the entire tower is based on the locations of such nodes to ensure a sufficient number of floors participate in the coupling of the core and perimeter frame.<!--nextpage--><\/p>\n<figure id=\"attachment_80708\" aria-describedby=\"caption-attachment-80708\" style=\"width: 200px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-2-Connie-Zhou.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-80708\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-2-Connie-Zhou-200x300.jpg\" alt=\"One of the most striking aspects of the Mark in Seattle is its megabrace structure that serves both the tower\u2019s form and function, a first of its kind in high-seismic regions.\" width=\"200\" height=\"300\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-2-Connie-Zhou-200x300.jpg 200w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-2-Connie-Zhou-333x500.jpg 333w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-2-Connie-Zhou.jpg 533w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/a><figcaption id=\"caption-attachment-80708\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">One of the most striking aspects of the Mark in Seattle is its megabrace structure that serves both the tower\u2019s form and function, a first of its kind in high-seismic regions.<\/span><\/figcaption><\/figure>\n<p>The Mark\u2019s unique megabrace structural configuration produced several important outcomes that included:<\/p>\n<ul>\n<li>a highly geometry-driven design;<\/li>\n<li>an unusual interaction between the core and external braces;<\/li>\n<li>a redundant system with distributed ductility; and<\/li>\n<li>an architecture defined by the bold expression<br \/>\nof structure.<\/li>\n<\/ul>\n<p><strong>Seismic design\u00a0<\/strong><\/p>\n<p>The potential of a large seismic event due to Seattle\u2019s proximity to the Cascadia Subduction Zone\u2014where the offshore Juan de Fuca tectonic plate is pushing beneath the North American plate\u2014added a layer of complexity to the project\u2019s structural design challenges. Given the building code limitations (2006 <em>International Building Code <\/em>[<em>IBC<\/em>] with City of Seattle Amendments) in prescribed lateral systems for high-rise buildings of this scale, the project\u2019s engineering team, had to justify the <a href=\"http:\/\/www.arup.com\" target=\"_blank\" rel=\"noopener\">structural configuration<\/a> through a very rigorous performance-based seismic design (PBSD) approach.<\/p>\n<p>Some of the critical structural elements evaluated as part of the PBSD included:<\/p>\n<ul>\n<li>steel perimeter braces (limited the amount of yield strain the brace experienced);<\/li>\n<li>concrete core walls (checked to ensure axial compression capacity is never exceeded);<\/li>\n<li>concrete core wall reinforcing (limited the amount of rebar tension strain beyond yield);<\/li>\n<li>concrete core beams over door opening\u2019s \u2018coupling beam\u2019(limited the rotation of beam due to bending);<\/li>\n<li>nodal floor collector beams (checked to ensure beam and beam-to-wall connection capacity is never exceeded);<\/li>\n<li>nodal floor diaphragms (checked to ensure the concrete floor shear capacity is never exceeded); and<\/li>\n<li>perimeter steel columns (checked to ensure the column capacity is never exceeded).<\/li>\n<\/ul>\n<p>One of the challenges of the analysis modeling was to capture the effect of the structural lateral system extending down 29 m (93 ft) into the ground, like a pole embedded in the earth. The lateral structure can push against the soil below grade and cantilever off the mat foundation slab at its base. To ensure the effects of both load paths were captured, all analyses were run twice\u2014once with stiff soil laterally restraining the below-grade structure and again with soft soil.<\/p>\n<figure id=\"attachment_80709\" aria-describedby=\"caption-attachment-80709\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-4-Connie-Zhou.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-80709\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-4-Connie-Zhou-300x200.jpg\" alt=\"To preserve the former First United Methodist Church, built in the early 20th century, ZGF Architects designed a tower that cantilevers over it instead of taking its place. Last year, the church building made its reintroduction as the Sanctuary, space for events and meetings.\" width=\"300\" height=\"200\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-4-Connie-Zhou-300x200.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-4-Connie-Zhou-768x512.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-4-Connie-Zhou-500x333.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-4-Connie-Zhou.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-80709\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">To preserve the former First United Methodist Church, built in the early 20th century, ZGF Architects designed a tower that cantilevers over it instead of taking its place. Last year, the church building made its reintroduction as the Sanctuary, space for events and meetings.<\/span><\/figcaption><\/figure>\n<p>The PBSD process demonstrated that the structure meets or exceeds the intended performance of <em>IBC<\/em> with regards to strength, stiffness, ductility, life safety, and collapse prevention. This project consisted of running seven simulated earthquake ground motions through a non-linear dynamic analysis of the tower structure to demonstrate that all components meet performance criteria to ensure structural integrity is maintained. The simulation validated the Mark could withstand a 2475-year quake registering as high as 9.0 on the Richter Scale. Slight yielding of the perimeter steel braces and concrete core reinforcing steel is expected, but there would be zero loss in integrity of any structural elements or connections.<\/p>\n<p>This approach has led to a better understanding of structural seismic performance and, for this project in particular, resulted in enhanced performance above code-designed buildings. By wrapping around the entire structure, the perimeter bracing system acts as a closed tube that engages the axial stiffness and strength of all the perimeter steel columns. It also enabled Arup to design the steel for the structural lateral and gravity system most efficiently and with the least amount of material. In fact, it saved 750 tons of steel\u2014a 10 percent saving over other structural systems\u2014while providing superior seismic performance.<\/p>\n<p><strong>Details and amenities<\/strong><\/p>\n<p>Inspired by the composition lines of classical figures such as Michelangelo\u2019s David and the Venus de Milo, the Mark\u2019s design is balanced and proportional with nearby buildings. At the tower\u2019s base, an elegant and highly transparent entrance lobby and lower-level fa\u00e7ade complements the adjacent buildings.<br \/>\nA glass connector serves as an enclosed transition between the Mark and the former church building.<!--nextpage--><\/p>\n<figure id=\"attachment_80712\" aria-describedby=\"caption-attachment-80712\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-8-Lara-Swimmer.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-80712\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-8-Lara-Swimmer-300x199.jpg\" alt=\"The lobby of the Mark emphasizes daylight and transparency. \" width=\"300\" height=\"199\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-8-Lara-Swimmer-300x199.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-8-Lara-Swimmer-768x509.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-8-Lara-Swimmer-500x331.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-8-Lara-Swimmer.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-80712\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The lobby of the Mark emphasizes daylight and transparency.<\/span><\/figcaption><\/figure>\n<p>In the Mark, the faceted glass exterior is light and luminous, designed to be<br \/>\nas transparent as possible to maximize daylight opportunities, while contrasting with the surrounding buildings. It is one of Seattle\u2019s first towers with column-free floors and floor-to-ceiling windows (more per square foot than in any other building in the city) which create light-soaked spaces for tenants. With fewer lateral elements configured at open angles, the faceted scheme draws the eye upward, increasing the vertical emphasis of the tower.<\/p>\n<p>The scheme also offers subtle variation in plane from facet to facet: a soft expression to avoid overpowering the delicate detail and scale of the nearby church and the Rainier Club. Depending on the time of year, weather, and the observer\u2019s point of view, the Mark reflects both adjacent high-rises and the historic buildings at its base, thereby paying homage to Seattle\u2019s past and present.<\/p>\n<p>Just off the lobby of the Mark, a travertine wall hand-selected by the Daniels Real Estate team in Italy creates a podium of natural beauty complementing the century-old Byzantine architecture of the Sanctuary. Due to its weight and size, the wall is structured by freestanding hollow structural section (HSS) frames, four stories in height. This was done to ensure it could move independently of the main building structure in a seismic event. The HSS tubes were infilled with structural studs, which were then sheathed. The stone itself was attached as a rainscreen, set on continuous horizontal rails fixed to the sheathing.<\/p>\n<figure id=\"attachment_80711\" aria-describedby=\"caption-attachment-80711\" style=\"width: 200px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-6-Lara-Swimmer.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-80711\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-6-Lara-Swimmer-200x300.jpg\" alt=\"An interior view of the enclosed connection between the Mark and the Sanctuary. Photos \u00a9 Lara Swimmer\" width=\"200\" height=\"300\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-6-Lara-Swimmer-200x300.jpg 200w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-6-Lara-Swimmer-333x500.jpg 333w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-6-Lara-Swimmer.jpg 533w\" sizes=\"auto, (max-width: 200px) 100vw, 200px\" \/><\/a><figcaption id=\"caption-attachment-80711\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">An interior view of the enclosed connection between the Mark and the Sanctuary.<\/span><br \/><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Photos \u00a9 Lara Swimmer<\/span><\/em><\/figcaption><\/figure>\n<p>To highlight the building\u2019s many amenities and to clearly guide tenants and visitors throughout the space, ZGF created a branded identity for the Mark. Elevators in the hotel and office cores include a custom-designed pattern etched on an oil-rubbed bronze overlay, a detail to highlight the tower\u2019s vertical expression and distinguish between the Mark and the Sanctuary.<\/p>\n<p>Network technology company F5 Networks has leased all 47,938 m<sup>2 <\/sup>(516,000 sf) of available office space at the Mark. A luxury, 189-room hotel is located on the first 16 floors and repurposes the former church into a meeting, event, and amenity space with a restaurant, bar, spa, and a 1858-m<sup>2<\/sup> (20,000-sf) ballroom.<\/p>\n<p><strong>Conclusion<\/strong><\/p>\n<p>The goal of preserving and celebrating adjacent historic structures, while creating a bold and distinctive form, drove the design of the Mark. It was clear from the start if the design did not respond to these criteria, the Sanctuary would be lost to other development opportunities. Today, the Mark offers an inspired response to a unique context, incorporating design innovation, stewardship, and historical integrity to maintain two existing structures and maximize development potential in one of downtown Seattle\u2019s skinniest high-rises.<\/p>\n<p class=\"Sidebar-BodyTextsidebar\"><em><span style=\"letter-spacing: .1pt;\">Allyn Stellmacher, AIA, LEED AP, is partner at ZGF Architects. <\/span><span style=\"letter-spacing: -.15pt;\">Stellmacher provides design leadership for a wide variety of projects<\/span><span style=\"letter-spacing: -.1pt;\"> in both the public and private sectors, including healthcare, higher <\/span><span style=\"letter-spacing: .1pt;\">education, and technology applications. Stellmacher\u2019s project <\/span><span style=\"letter-spacing: -.15pt;\">involvement has demonstrated his sensitivity to the use and detailing <\/span><span style=\"letter-spacing: .1pt;\">of appropriate materials, building systems, and technologies to <\/span><span style=\"letter-spacing: -.15pt;\">optimize design quality. He graduated from the University of Oregon with a bachelor\u2019s degree in architecture. Stellmacher can be reached<\/span><span style=\"letter-spacing: -.1pt;\"> via e-mail at <a href=\"mailto:allyn.stellmacher@zgf.com\" target=\"_blank\" rel=\"noopener\">allyn.stellmacher@zgf.com<\/a>.<\/span><\/em><\/p>\n<p class=\"Sidebar-BodyTextsidebar\"><em><span style=\"letter-spacing: .15pt;\">John Worley, SE, LEED AP, is a principal with Arup and is the office leader for Oakland, California. Worley has more than 30 years of experience in structural building design and project <\/span>management on a wide range of projects, including office towers, <span style=\"letter-spacing: .15pt;\">hospitals, schools, laboratories, airports, and theatrical and <\/span>industrial facilities. Leveraging technology and a team-integrated approach, he orchestrates projects from conception through final <span style=\"letter-spacing: .15pt;\">construction. Worley also has extensive experience in seismic analysis and performance-based design. He can be reached\u00a0\u00a0<\/span><\/em><em>at <a href=\"mailto:john.worley@arup.com\" target=\"_blank\" rel=\"noopener\">john.worley@arup.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In the design of the Mark, a new 48-story commercial office and hotel tower in downtown Seattle, the owner and developer held the rights to demolish a historically significant church on the site, allowing for the development of a half-block footprint. However, the emotional, cultural, and also historic significance of the old church\u2014a facility commissioned by Arthur Denny, founding father of the city of Seattle\u2014motivated the client and local parishioners to seek alternatives.<\/p>\n","protected":false},"author":13542,"featured_media":80707,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,183,185,250,188,279,459,489,460],"tags":[4972,5232,752,5036,5233,2934,5234,2920],"class_list":["post-80699","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-03-00-00-concrete","category-05-00-00-metals","category-05-10-00-structural-metal-framing","category-08-00-00-openings","category-08-80-00-glazing","category-b10superstructure","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-4972","tag-5232","tag-concrete","tag-divisions-03","tag-glass-glazing","tag-seismic-performance","tag-steel-braces","tag-structural-steel","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>The Mark: Where design innovation preserves history -<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"The Mark: Where design innovation preserves history -\" \/>\n<meta property=\"og:description\" content=\"In the design of the Mark, a new 48-story commercial office and hotel tower in downtown Seattle, the owner and developer held the rights to demolish a historically significant church on the site, allowing for the development of a half-block footprint. However, the emotional, cultural, and also historic significance of the old church\u2014a facility commissioned by Arthur Denny, founding father of the city of Seattle\u2014motivated the client and local parishioners to seek alternatives.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2019-02-06T14:41:20+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"533\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"sadia_badhon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"sadia_badhon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"11 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/\"},\"author\":{\"name\":\"sadia_badhon\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\"},\"headline\":\"The Mark: Where design innovation preserves history\",\"datePublished\":\"2019-02-06T14:41:20+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/\"},\"wordCount\":2133,\"commentCount\":0,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/The-Mark-1-Connie-Zhou.jpg\",\"keywords\":[\"05\",\"08\",\"Concrete\",\"Divisions 03\",\"Glass glazing\",\"Seismic Performance\",\"Steel braces\",\"Structural Steel\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"03 00 00 Concrete\",\"05 00 00 Metals\",\"05 10 00 Structural Metal Framing\",\"08 00 00 Openings\",\"08 80 00 Glazing\",\"B10\u2212Superstructure\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/\",\"name\":\"The Mark: Where design innovation preserves history -\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/The-Mark-1-Connie-Zhou.jpg\",\"datePublished\":\"2019-02-06T14:41:20+00:00\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/the-mark-where-design-innovation-preserves-history\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/The-Mark-1-Connie-Zhou.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/02\\\/The-Mark-1-Connie-Zhou.jpg\",\"width\":800,\"height\":533,\"caption\":\"Photos \u00a9 Connie Zhou\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\",\"name\":\"sadia_badhon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"caption\":\"sadia_badhon\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/sadia_badhon\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"The Mark: Where design innovation preserves history -","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/","next":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/2\/","og_locale":"en_US","og_type":"article","og_title":"The Mark: Where design innovation preserves history -","og_description":"In the design of the Mark, a new 48-story commercial office and hotel tower in downtown Seattle, the owner and developer held the rights to demolish a historically significant church on the site, allowing for the development of a half-block footprint. However, the emotional, cultural, and also historic significance of the old church\u2014a facility commissioned by Arthur Denny, founding father of the city of Seattle\u2014motivated the client and local parishioners to seek alternatives.","og_url":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/","og_site_name":"The Construction Specifier","article_published_time":"2019-02-06T14:41:20+00:00","og_image":[{"width":800,"height":533,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou.jpg","type":"image\/jpeg"}],"author":"sadia_badhon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"sadia_badhon","Est. reading time":"11 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/"},"author":{"name":"sadia_badhon","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e"},"headline":"The Mark: Where design innovation preserves history","datePublished":"2019-02-06T14:41:20+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/"},"wordCount":2133,"commentCount":0,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou.jpg","keywords":["05","08","Concrete","Divisions 03","Glass glazing","Seismic Performance","Steel braces","Structural Steel"],"articleSection":["Features","MasterFormat","UniFormat","03 00 00 Concrete","05 00 00 Metals","05 10 00 Structural Metal Framing","08 00 00 Openings","08 80 00 Glazing","B10\u2212Superstructure","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/","url":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/","name":"The Mark: Where design innovation preserves history -","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou.jpg","datePublished":"2019-02-06T14:41:20+00:00","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/the-mark-where-design-innovation-preserves-history\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/02\/The-Mark-1-Connie-Zhou.jpg","width":800,"height":533,"caption":"Photos \u00a9 Connie Zhou"},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e","name":"sadia_badhon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","caption":"sadia_badhon"},"url":"https:\/\/www.constructionspecifier.com\/author\/sadia_badhon\/"}]}},"views":12951,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/80699","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/13542"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=80699"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/80699\/revisions"}],"predecessor-version":[{"id":80737,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/80699\/revisions\/80737"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/80707"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=80699"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=80699"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=80699"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}