{"id":85087,"date":"2019-04-04T17:24:54","date_gmt":"2019-04-04T21:24:54","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=85087"},"modified":"2019-04-05T08:37:33","modified_gmt":"2019-04-05T12:37:33","slug":"la-museum-shrinks-in-revised-design-plan","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/","title":{"rendered":"LA museum shrinks in revised design plan"},"content":{"rendered":"<figure id=\"attachment_85089\" aria-describedby=\"caption-attachment-85089\" style=\"width: 461px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/lacma.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-85089\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/lacma-300x123.jpg\" alt=\"Architect Peter Zumthor\u2019s new plans reveal the Los Angeles County Museum of Art\u2019s (LACMA\u2019s) new building will be smaller than initially proposed. Image courtesy Atelier Peter Zumthor\/The Boundary\" width=\"461\" height=\"189\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/lacma-300x123.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/lacma-768x316.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/lacma-500x206.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/lacma.jpg 1024w\" sizes=\"auto, (max-width: 461px) 100vw, 461px\" \/><\/a><figcaption id=\"caption-attachment-85089\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Architect Peter Zumthor\u2019s new plans reveal the Los Angeles County Museum of Art\u2019s (LACMA\u2019s) new building will be smaller than initially proposed. <br \/><em>Image courtesy Atelier Peter Zumthor\/The Boundary<\/em><\/span><\/figcaption><\/figure>\n<p>Swiss architect Peter Zumthor has revised his design plans for the <a href=\"https:\/\/www.lacma.org\/\" target=\"_blank\" rel=\"noopener noreferrer\">Los Angeles County Museum of Art\u2019s<\/a> (LACMA\u2019s) new campus. Renderings reveal the proposed building size has been scaled down to 32,284 m<sup>2<\/sup> (347,500 sf), and the maximum height has also been reduced.<\/p>\n<p>The new building would be composed of seven semi-transparent concrete and glass pavilions that support an elevated, organically shaped, and transparent main exhibition level with a floor-to-ceiling glass fa\u00e7ade. It would replace the four existing, aging buildings that would eventually be demolished.<\/p>\n<p>According to LACMA, \u201cthe buildings to be demolished have many serious structural issues and problems with plumbing, sewage, and leaks, compromising their ability to hold our collections and host our visitors and staff. To retrofit the existing buildings would be very costly while still failing to provide the setting most appropriate for the collections and visitors. Museums change over time to accommodate cultural shifts in our relationship to the arts, and the aging buildings no longer reflect the best and most effective way to exhibit the museum\u2019s collections.\u201d<\/p>\n<p>Zumthor\u2019s design includes new outdoor landscaped plazas, public programming, educational spaces, sculpture gardens, and native and drought-tolerant vegetation integrated with the museum building, LACMA\u2019s west campus, and the Hancock Park.<\/p>\n<p>The project would open up approximately 1.4 ha (3.5 acres) of new public outdoor space. Additionally, a 260-space parking facility would also be built.<\/p>\n<p>According to LACMA, the required environmental studies for the plan have been completed, and the county has now issued a <a href=\"https:\/\/ceo.lacounty.gov\/final-environmental-impact-report\/\" target=\"_blank\" rel=\"noopener noreferrer\">Final Environmental Impact Report<\/a> (FEIR). The next step in this comprehensive review process will be a public meeting to be held by the Los Angeles county board of supervisors to certify the FEIR and approve the project.<\/p>\n<p>If the project gets approved, construction is expected to start late 2019 and conclude at the end of 2023.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Swiss architect Peter Zumthor has revised his design plans for the Los Angeles County Museum of Art\u2019s (LACMA\u2019s) new campus. Renderings reveal the proposed building size has been scaled down to 32,284 m2 (347,500 sf), and the maximum height has also been reduced.<\/p>\n","protected":false},"author":4183,"featured_media":85090,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1029],"tags":[1371,752,5061,529],"class_list":["post-85087","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news","tag-california","tag-concrete","tag-cultural-architecture","tag-glass","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>LA museum shrinks in revised design plan - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"LA museum shrinks in revised design plan - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Swiss architect Peter Zumthor has revised his design plans for the Los Angeles County Museum of Art\u2019s (LACMA\u2019s) new campus. Renderings reveal the proposed building size has been scaled down to 32,284 m2 (347,500 sf), and the maximum height has also been reduced.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2019-04-04T21:24:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-04-05T12:37:33+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/featured-5.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"973\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"nithya_caleb\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"nithya_caleb\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/\"},\"author\":{\"name\":\"nithya_caleb\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b98ef8acdc4f61ec3c542bdb863ee469\"},\"headline\":\"LA museum shrinks in revised design plan\",\"datePublished\":\"2019-04-04T21:24:54+00:00\",\"dateModified\":\"2019-04-05T12:37:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/\"},\"wordCount\":349,\"commentCount\":2,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/featured-5.jpg\",\"keywords\":[\"California\",\"Concrete\",\"Cultural Architecture\",\"glass\"],\"articleSection\":[\"News\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/\",\"name\":\"LA museum shrinks in revised design plan - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/featured-5.jpg\",\"datePublished\":\"2019-04-04T21:24:54+00:00\",\"dateModified\":\"2019-04-05T12:37:33+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/featured-5.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/featured-5.jpg\",\"width\":973,\"height\":400},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/la-museum-shrinks-in-revised-design-plan\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"LA museum shrinks in revised design plan\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/b98ef8acdc4f61ec3c542bdb863ee469\",\"name\":\"nithya_caleb\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g\",\"caption\":\"nithya_caleb\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/nithya_caleb\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"LA museum shrinks in revised design plan - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/","og_locale":"en_US","og_type":"article","og_title":"LA museum shrinks in revised design plan - The Construction Specifier","og_description":"Swiss architect Peter Zumthor has revised his design plans for the Los Angeles County Museum of Art\u2019s (LACMA\u2019s) new campus. Renderings reveal the proposed building size has been scaled down to 32,284 m2 (347,500 sf), and the maximum height has also been reduced.","og_url":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/","og_site_name":"The Construction Specifier","article_published_time":"2019-04-04T21:24:54+00:00","article_modified_time":"2019-04-05T12:37:33+00:00","og_image":[{"width":973,"height":400,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/featured-5.jpg","type":"image\/jpeg"}],"author":"nithya_caleb","twitter_card":"summary_large_image","twitter_misc":{"Written by":"nithya_caleb","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/"},"author":{"name":"nithya_caleb","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b98ef8acdc4f61ec3c542bdb863ee469"},"headline":"LA museum shrinks in revised design plan","datePublished":"2019-04-04T21:24:54+00:00","dateModified":"2019-04-05T12:37:33+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/"},"wordCount":349,"commentCount":2,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/featured-5.jpg","keywords":["California","Concrete","Cultural Architecture","glass"],"articleSection":["News"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/","url":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/","name":"LA museum shrinks in revised design plan - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/featured-5.jpg","datePublished":"2019-04-04T21:24:54+00:00","dateModified":"2019-04-05T12:37:33+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/featured-5.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/featured-5.jpg","width":973,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/la-museum-shrinks-in-revised-design-plan\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"LA museum shrinks in revised design plan"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/b98ef8acdc4f61ec3c542bdb863ee469","name":"nithya_caleb","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/8a720f16106e3badd15369daa30776863e73616618206dbee6511c6f2a993456?s=96&d=mm&r=g","caption":"nithya_caleb"},"url":"https:\/\/www.constructionspecifier.com\/author\/nithya_caleb\/"}]}},"views":5576,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/85087","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/4183"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=85087"}],"version-history":[{"count":3,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/85087\/revisions"}],"predecessor-version":[{"id":85129,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/85087\/revisions\/85129"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/85090"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=85087"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=85087"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=85087"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}