{"id":86820,"date":"2019-05-01T12:15:53","date_gmt":"2019-05-01T16:15:53","guid":{"rendered":"https:\/\/www.constructionspecifier.com\/?p=86820"},"modified":"2019-05-01T10:30:42","modified_gmt":"2019-05-01T14:30:42","slug":"role-of-wrb-in-open-joint-cladding-design","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/","title":{"rendered":"Role of WRB in open-joint cladding design"},"content":{"rendered":"<p><strong>by Peter Barrett<\/strong><\/p>\n<figure id=\"attachment_86828\" aria-describedby=\"caption-attachment-86828\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-86828\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding-300x217.jpg\" alt=\"All images courtesy D\u00f6rken Systems Inc.\" width=\"300\" height=\"217\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding-300x217.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding-768x555.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding-500x361.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-86828\" class=\"wp-caption-text\"><em><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">All images courtesy D\u00f6rken Systems Inc.<\/span><\/em><\/figcaption><\/figure>\n<p>Open-joint cladding enhances the visual appeal of buildings. However, it exposes the exterior wall to wind, water, and ultraviolet (UV) rays, thereby risking havoc to building performance and causing the growth of mold and rot within the wall cavity. Applying the right barrier in the appropriate place can help building professionals protect their designs well into the future and improve the overall performance as well as the appearance of a structure.<\/p>\n<p>Water-resistive barriers (WRBs), specifically meant for open-joint cladding designs, are intended to be installed in front of the continuous insulation (ci) and behind the cladding itself. At this location, it does not replace the primary air barrier\/WRB\u2014these membranes are located in front of the structural sheathing and behind the ci (Figure 1).<\/p>\n<p><strong>Insulation protection<\/strong><\/p>\n<p>The primary role of a WRB designed for open-joint cladding systems is to channel bulk water from wind-driven rain (and snow) to the outside of the structure in order to keep it dry and maintain the insulation system\u2019s performance. In effect, the WRB functions as part of the primary cladding. It will also protect the insulation from the R-value-lowering effects of wind-washing, a phenomenon occurring when air blows through a permeable insulation, disturbing the otherwise inert gases that give the insulation thermal value. Wind-washing refers to wind-driven flow of cold outdoor air through low-density insulation or air gaps in exterior continuous insulation (ci). This phenomenon can cool the interior side of the enclosure, thereby resulting in condensation.<\/p>\n<figure id=\"attachment_86830\" aria-describedby=\"caption-attachment-86830\" style=\"width: 300px\" class=\"wp-caption alignleft\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-4-cladding.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-86830 size-medium\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-4-cladding-300x216.jpg\" alt=\"Figure 1: This illustration shows that water-resistive barriers (WRBs) for open-joint cladding systems are installed in front of the continuous insulation (ci) and do not replace the primary air barrier\/WRB, located in front of the structural sheathing.\" width=\"300\" height=\"216\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-4-cladding-300x216.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-4-cladding-768x553.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-4-cladding-500x360.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-4-cladding.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-86830\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\"><strong>Figure 1:<\/strong> This illustration shows that water-resistive barriers (WRBs) for open-joint cladding systems are installed in front of the continuous insulation (ci) and do not replace the primary air barrier\/WRB, located in front of the structural sheathing.<\/span><\/figcaption><\/figure>\n<p>Some experts believe this bulk movement of air can increase heat loss and cause condensation as well as greater energy consumption. However, several contributing factors can alter the severity of these effects, including insulation type, product thickness, and building height. So, while there is still some discussion in the industry regarding the overall effects of wind-washing on insulation, the fact is, the membrane behind the cladding protects the insulation from elements like wind when installed correctly.<\/p>\n<p><strong>Proper installation<\/strong><\/p>\n<p>To ensure the effectiveness of the WRB in an open-joint cladding system, it is essential to install the membrane and its components in a manner that seals all potential leakage points, including:<\/p>\n<ul>\n<li>connections of the walls to the roof\u2019s air barrier and the building foundation;<\/li>\n<li>seismic and expansion joints;<\/li>\n<li>piping, conduit, duct, screws, bolts, and similar penetrations;<\/li>\n<li>changes in plane; and<\/li>\n<li>all other potential pathways for air and water leakage in the building enclosure.<\/li>\n<\/ul>\n<p>Along with being water resistive, the right membrane should also be highly vapor permeable, allowing moisture within the cavity to escape swiftly through diffusion, while protecting the insulation from possible damage by moisture infiltration. Regardless of the type of membrane used, it is critical the moisture throttle should not be at this location as all interior moisture needs to move freely to the exterior.<!--nextpage--><\/p>\n<p><strong>Importance of UV stability<\/strong><\/p>\n<figure id=\"attachment_86827\" aria-describedby=\"caption-attachment-86827\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-1-cladding.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-86827\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-1-cladding-300x201.jpg\" alt=\"The exterior of the Collaborative Life Sciences Building (CLSB) in Portland is made up of prefinished perforated panels of aluminum, engineered in a corrugated profile.\" width=\"300\" height=\"201\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-1-cladding-300x201.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-1-cladding-768x516.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-1-cladding-500x336.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-1-cladding.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-86827\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">The exterior of the Collaborative Life Sciences Building (CLSB) in Portland is made up of prefinished perforated panels of aluminum, engineered in a corrugated profile.<\/span><\/figcaption><\/figure>\n<p>If wind, rain, and snow can get through the open joints, it goes without saying UV light can also do so because the wall assemblies are exposed. This increases the risk of degradation of wall components by UV light. It is important to note that regular membranes and even building paper might provide the desired water holdout but the aging process will accelerate due to excessive UV exposure. The assembly might only perform as expected for a few years, resulting in significant loss of performance over the life of a new building. However, design professionals can protect the exterior wall assembly by employing materials with UV-stabilized properties.<\/p>\n<p>In the case of long-term UV exposure, there is no ASTM standard on which a manufacturer may base their claim of acceptable exposure time. There is a durability component to the International Code Council-Evaluation Services\u2019 (ICC-ES\u2019) acceptance criteria (AC) 38, \u201cWater-resistive Barriers,\u201d but since it was designed to test any WRB, not just UV-stable membranes, it is not a meaningful measurement tool for membranes specifically designed for long-term open-joint exposure. However, using a UV-stable membrane, along with best practices in understanding and preventing excessive UV exposure, will help to prevent impact on performance. For example, one of the open-joint cladding WRBs available in the market are manufactured with special acrylic coatings to make them UV-resistant. These materials may be used in systems with up to 50-mm (2-in.) openings comprising up to 40 percent of the overall fa\u00e7ade.<\/p>\n<p><strong>Durability and tear resistance<\/strong><\/p>\n<p>The ideal barrier for open-joint cladding is resistant to tears and can withstand the day-to-day environment of a construction site because the WRB is left uncovered prior to the installation of the cladding material. The durability is also a critical consideration for open-joint designs because some elements of the barrier will be left exposed even after the cladding is applied, as previously discussed.<\/p>\n<p>The WRB is a part of the wall system but its location makes it quite vulnerable and exposed. Therefore, it is a poor idea to designate the membrane at this location as the primary air barrier. Though both the air and water-resistive barriers are expected to be durable and tear resistant, it is important to note that their location is also critical to their long-term performance.<\/p>\n<p>As building industry experts John Straube and Joe Lstiburek recommend in the <a href=\"http:\/\/www.buildingscience.com\/documents\/insights\/bsi-001-the-perfect-wall\" target=\"_blank\" rel=\"noopener noreferrer\">Perfect Wall concept<\/a>, critical performance layers, such as the air barrier, should be placed in a protected location to prevent damage. Barriers\u2014exposed or actually performing as cladding\u2014such as those seen in an open-joint design, would not be considered protected in the Perfect Wall concept. Therefore, the designated air barrier should always be placed behind the ci, to the interior, to prevent damage.<\/p>\n<p><strong>Adds to innovative design<\/strong><\/p>\n<p>Most architects and designers choose open-joint cladding to enhance the overall visual appeal of their buildings. When not using a WRB directly behind the cladding, there can be concerns around the appearance of the wall elements. For example, if the uncovered insulation shows through in such designs, a beautiful concept might miss the mark. However, when the right barrier is employed in the proper manner, it can provide a 3D effect to enhance the visual appearance of the building. This concept<br \/>\nis applied by the world\u2019s most advanced building professionals designing some of the most cutting-edge buildings.<\/p>\n<p><strong>Bringing the concept to life<\/strong><\/p>\n<p>Recognizing the need for protection and getting ahead of building challenges were the drivers behind the development of the Collaborative Life Sciences Building (CLSB) in Portland. The project brought together three of the state\u2019s top universities to create a landmark facility. The project combined the resources of the Oregon Health &amp; Science University (OHSU), Oregon State University (OSU), and Portland State University (PSU) to provide 46,452 m<sup>2<\/sup> (500,000 sf) of instructional and research space for life sciences, pharmacy, medical, and dental programs.<!--nextpage--><\/p>\n<figure id=\"attachment_86829\" aria-describedby=\"caption-attachment-86829\" style=\"width: 300px\" class=\"wp-caption alignright\"><a href=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-3-cladding.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"size-medium wp-image-86829\" src=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-3-cladding-300x197.jpg\" alt=\"Addition of the barrier membrane to CLSB\u2019s exterior wall.\" width=\"300\" height=\"197\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-3-cladding-300x197.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-3-cladding-768x505.jpg 768w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-3-cladding-500x329.jpg 500w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-3-cladding.jpg 800w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/><\/a><figcaption id=\"caption-attachment-86829\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial, helvetica, sans-serif;\">Addition of the barrier membrane to CLSB\u2019s exterior wall.<\/span><\/figcaption><\/figure>\n<p>One of the unique features of this new build was the enclosure design. The exterior of the CLSB is comprised of prefinished perforated panels of aluminum, engineered in a corrugated profile. While this specific feature provided the academic building with enhanced visual interest, one technical challenge was wind and water intrusion. It was important the design meets the project\u2019s stringent water intrusion goals. Open-joint cladding systems specifically require extreme water and wind protection. If the WRB is not durable enough to withstand extreme weather conditions or stable when exposed to prolonged periods of UV light, the system will fail. With the CLSB building exposed to strong winds off Puget Sound, the concern was the constant positive and negative pressure of blowing wind could damage the membrane, particularly at fastening points.<\/p>\n<p><strong>Designing the assembly<\/strong><\/p>\n<p>When determining what would go underneath the panels, it was critical to choose a water-shedding membrane suitable for the conditions in Oregon, as CLSB is situated in an area where high winds and wet weather are common. The team considered using a black sheet metal for the weather barrier, but then looked to a WRB solution that could provide strong weather protection and UV resistance. The neutral black color of the product also provided a suitable background to give the perforated panels the desired visual depth. However, questions arose about durability because of the building height and local weather conditions.<\/p>\n<p><strong>Testing<\/strong><\/p>\n<p>Special testing was required for the application, as the building is subject to extraordinary wind conditions. As explained, the concern was the durability of the membrane since it would be subject to the cyclic action of wind pressures. The testing was a collaborative effort and was critical to measure the WRB\u2019s structural strength and durability. The testing was done over the span of two days, where the lab put the membrane through 9000 cycles of pressure differential, each consisting of three seconds of pressure followed by three seconds of rest. To fully observe the condition and performance of the membrane, testing was done in increments\u20147000 cycles with a positive pressure differential of 575 Pa (12 psf), followed by 2000 cycles of negative pressure differential at 575 Pa. Since no test exists for this kind of design previously, the laboratory created a test method that was based on ASTM E1233, <em>Standard<\/em><em> Test Method for Structural Performance of Exterior Windows, Doors, Skylights, and Curtain Walls by Cyclic Air Pressure Differential<\/em>.<\/p>\n<p>The results of the test showed no measurable wear, indicating that the WRB was quite durable. However, given the severity of the Oregon weather, the team wanted to dig further. Therefore, after the initial testing, the team attempted a five-minute cycle at higher wind velocity pressures, up to 193 km\/h (120 mph) and performed destructive testing on the wall system. Rips or tears were not seen on the membrane but the z-girts gave out before the membrane.<\/p>\n<p>For a building with an exterior cladding full of holes, using a suitable WRB proved to be the best solution to preserve the structure\u2019s performance and enhance its aesthetics.<\/p>\n<p><strong>Conclusion<\/strong><\/p>\n<p>Protecting open-joint buildings from water, wind, and UV is extremely important since they tend to expose the inner parts of the performing walls to extreme weather conditions. The CLSB case study reiterates the importance of installing a membrane that is water- and wind-resistant in open-joint cladding systems. With a durable and effective WRB in place, building professionals can be confident their projects and aesthetic visions are well protected and will be an enduring legacy.<\/p>\n<p class=\"Sidebar-BodyTextsidebar\"><em><span style=\"letter-spacing: -.15pt;\">Peter Barrett is the product and marketing manager for D\u00f6rken Systems Inc. He has been with the company for more than 12 years. However, his involvement with the design community and building materials industry spans over 25 years. Barrett holds a BA (Hons.) from Queen\u2019s University, Kingston, Ontario, and an MBA from Wilfrid Laurier University, Waterloo, Ontario. Barrett is a member of the board of directors for the Air Barrier Association of America (ABAA). He can be reached at <a href=\"mailto:pbarrett@dorken.com\" target=\"_blank\" rel=\"noopener noreferrer\">pbarrett@dorken.com<\/a>.<\/span><\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Applying the right barrier in the appropriate place can help building professionals protect their designs well into the future and improve the overall performance as well as the appearance of a structure.<\/p>\n","protected":false},"author":13542,"featured_media":86828,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[520,179,449,187,265,269,489,460],"tags":[4974,157,83,1195,1720,5310,5311,547],"class_list":["post-86820","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-features","category-masterformat","category-uniformat","category-07-00-00-thermal-and-moisture-protection","category-07-25-00-weather-barriers","category-07-60-00-flashing-and-sheet-metal","category-b2010exterior-walls","category-b20exterior-vertical-enclosures","tag-aluminum-panels","tag-cladding","tag-continuous-insulation","tag-division-07","tag-exterior-walls","tag-open-joint-cladding","tag-ultraviolet-light","tag-water-resistive-barrier","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Role of WRB in open-joint cladding design - The Construction Specifier<\/title>\n<meta name=\"description\" content=\"Applying the right barrier in the appropriate place can help building professionals protect their designs well into the future.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/\" \/>\n<link rel=\"next\" href=\"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/2\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Role of WRB in open-joint cladding design - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"Applying the right barrier in the appropriate place can help building professionals protect their designs well into the future.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2019-05-01T16:15:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"578\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"sadia_badhon\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"sadia_badhon\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/\"},\"author\":{\"name\":\"sadia_badhon\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\"},\"headline\":\"Role of WRB in open-joint cladding design\",\"datePublished\":\"2019-05-01T16:15:53+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/\"},\"wordCount\":1884,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/Figure-2-cladding.jpg\",\"keywords\":[\"Aluminum panels\",\"Cladding\",\"continuous insulation\",\"Division 07\",\"Exterior Walls\",\"Open-joint cladding\",\"Ultraviolet light\",\"Water-resistive barrier\"],\"articleSection\":[\"Features\",\"MasterFormat\",\"UniFormat\",\"07 00 00 Thermal and Moisture Protection\",\"07 25 00 Weather Barriers\",\"07 60 00 Flashing and Sheet Metal\",\"B2010\u2212Exterior Walls\",\"B20\u2212Exterior Vertical Enclosures\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/\",\"name\":\"Role of WRB in open-joint cladding design - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/Figure-2-cladding.jpg\",\"datePublished\":\"2019-05-01T16:15:53+00:00\",\"description\":\"Applying the right barrier in the appropriate place can help building professionals protect their designs well into the future.\",\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/role-of-wrb-in-open-joint-cladding-design\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/Figure-2-cladding.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2019\\\/04\\\/Figure-2-cladding.jpg\",\"width\":800,\"height\":578,\"caption\":\"All images courtesy D\u00f6rken Systems Inc.\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/991f070de813fbb84c1b570da5fdea1e\",\"name\":\"sadia_badhon\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g\",\"caption\":\"sadia_badhon\"},\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/sadia_badhon\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Role of WRB in open-joint cladding design - The Construction Specifier","description":"Applying the right barrier in the appropriate place can help building professionals protect their designs well into the future.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/","next":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/2\/","og_locale":"en_US","og_type":"article","og_title":"Role of WRB in open-joint cladding design - The Construction Specifier","og_description":"Applying the right barrier in the appropriate place can help building professionals protect their designs well into the future.","og_url":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/","og_site_name":"The Construction Specifier","article_published_time":"2019-05-01T16:15:53+00:00","og_image":[{"width":800,"height":578,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding.jpg","type":"image\/jpeg"}],"author":"sadia_badhon","twitter_card":"summary_large_image","twitter_misc":{"Written by":"sadia_badhon","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/"},"author":{"name":"sadia_badhon","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e"},"headline":"Role of WRB in open-joint cladding design","datePublished":"2019-05-01T16:15:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/"},"wordCount":1884,"commentCount":1,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding.jpg","keywords":["Aluminum panels","Cladding","continuous insulation","Division 07","Exterior Walls","Open-joint cladding","Ultraviolet light","Water-resistive barrier"],"articleSection":["Features","MasterFormat","UniFormat","07 00 00 Thermal and Moisture Protection","07 25 00 Weather Barriers","07 60 00 Flashing and Sheet Metal","B2010\u2212Exterior Walls","B20\u2212Exterior Vertical Enclosures"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/","url":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/","name":"Role of WRB in open-joint cladding design - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding.jpg","datePublished":"2019-05-01T16:15:53+00:00","description":"Applying the right barrier in the appropriate place can help building professionals protect their designs well into the future.","inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/role-of-wrb-in-open-joint-cladding-design\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2019\/04\/Figure-2-cladding.jpg","width":800,"height":578,"caption":"All images courtesy D\u00f6rken Systems Inc."},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/991f070de813fbb84c1b570da5fdea1e","name":"sadia_badhon","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1d3ff700dcb6c77e12f7e53bf9f893c95d83582cc6605956286c2e143cffaf9c?s=96&d=mm&r=g","caption":"sadia_badhon"},"url":"https:\/\/www.constructionspecifier.com\/author\/sadia_badhon\/"}]}},"views":15646,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/86820","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/13542"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=86820"}],"version-history":[{"count":5,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/86820\/revisions"}],"predecessor-version":[{"id":86835,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/86820\/revisions\/86835"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/86828"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=86820"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=86820"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=86820"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}