{"id":9249,"date":"2015-05-25T16:42:48","date_gmt":"2015-05-25T20:42:48","guid":{"rendered":"http:\/\/www.constructionspecifier.com\/?p=9249"},"modified":"2017-01-27T15:46:40","modified_gmt":"2017-01-27T20:46:40","slug":"solar-air-heating-for-senior-housing-retrofit","status":"publish","type":"post","link":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/","title":{"rendered":"Solar air-heating for senior housing retrofit"},"content":{"rendered":"<figure id=\"attachment_9251\" aria-describedby=\"caption-attachment-9251\" style=\"width: 258px\" class=\"wp-caption alignright\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-9251\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766-747x1000.jpg\" alt=\"This photo shows the solar air-heating system cavity framing in the Lyndon B. Johnson (LBJ) Apartments in Cambridge, Massachusetts. Photos courtesy Cambridge Housing Authority (CHA)\" width=\"258\" height=\"346\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766-747x1000.jpg 747w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766-224x300.jpg 224w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766-624x835.jpg 624w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766.jpg 765w\" sizes=\"auto, (max-width: 258px) 100vw, 258px\" \/><\/a><figcaption id=\"caption-attachment-9251\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">This photo shows the solar air-heating system cavity framing in the Lyndon B. Johnson (LBJ) Apartments in Cambridge, Massachusetts.<\/span><br \/><em>Photos courtesy Cambridge Housing Authority (CHA)<\/em><\/figcaption><\/figure>\n<p><strong>By Brian Wilkinson<br \/>\n<\/strong>A 210-m<sup>2<\/sup> (2250-sf) unglazed, transpired solar air-heating collection (TSAC) system has greatly improved the energy efficiency of Cambridge, Massachusetts senior housing. The Lyndon B. Johnson (LBJ) Apartments, a 180-unit development owned by the Cambridge Housing Authority (CHA), benefited from the technology, which integrated aesthetically, seamlessly, and cost-effectively within its architecture.<\/p>\n<p>These solar air-heating collectors have high operating efficiencies of 70 to 89 percent, and utilize existing building mechanical systems in high-rise applications in order to function. Such systems are designed for cold climates, demonstrating an incremental payback history of two to eight years\u2014ideal installations are located in areas with cool weather but significant sunshine. Given the relatively quick payback, and ease of integration on new or retrofit applications, building owners planning fa\u00e7ade renovations should evaluate whether a transpired solar air-heating system is a viable option.<\/p>\n<p>At the LBJ Apartments, as in most northern latitudes, a dark, perforated, metal cladding (<em>i.e.<\/em> absorber) is installed on a south-facing wall over the building\u2019s ventilation intake system. Both diffuse and direct solar radiation strike the absorber; as the air passes through the perforations, the sunlight is converted into heat.<\/p>\n<p>Outdoor air is drawn through the perforated exterior cladding at flow rates of 7 to 12 m<sup>3<\/sup>\/h (4 to 7 cfm\/sf) of collector area and into the void cavity between the cladding and the building\u2019s exterior structural wall. Higher air flow rates are suggested for high-rise applications to mitigate the impact of heat loss due to ambient wind on the absorber. As the air travels through the system, it is heated up to 25 C (45 F) over ambient temperatures; the warmed air is then drawn into the building as fresh ventilation air.<\/p>\n<p>According to American Society of Heating, Refrigerating, and Air-conditioning Engineers (ASHRAE) 55, <em>Thermal Environmental Conditions for Human Occupancy<\/em>, the temperature of the air in a building should range from 20 to 24 C (68 to 75 F) during the winter. Transpired solar air collectors serve to pre-heat ventilation air to up to 23 C (73 F) without using other fuels, reducing energy demand.<\/p>\n<p>The 209-m<sup>2<\/sup> (2250-sf) black, wall-mounted transpired solar air-heating collector was raised 12 stories, covering the south-facing wall of LBJ Apartments, harnessing solar radiation to cost-effectively pre-heat 17,000 m<sup>3<\/sup>\/h (10,000 cfm) of fresh air as it is drawn into the building\u2019s ventilation system, providing substantial energy savings during the heating season.<\/p>\n<p>\u201cThe energy retrofit at LBJ Apartments is a showcase for clean, renewable technologies,\u201d said Greg Russ, CHA executive director. \u201cThe specified solar heating system is part of the technology package that will contribute to our effort to reduce our environmental footprint by adding renewable energy technology that pays for itself, improves the building performance, and introduces new energy conservation techniques to the region.\u201d<\/p>\n<figure id=\"attachment_9252\" aria-describedby=\"caption-attachment-9252\" style=\"width: 255px\" class=\"wp-caption alignleft\"><a href=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2820-800.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\" wp-image-9252\" src=\"http:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2820-800-300x240.jpg\" alt=\"The black cladding is actually a solar-air-heating system. \" width=\"255\" height=\"204\" srcset=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2820-800-300x240.jpg 300w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2820-800.jpg 1000w, https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2820-800-624x499.jpg 624w\" sizes=\"auto, (max-width: 255px) 100vw, 255px\" \/><\/a><figcaption id=\"caption-attachment-9252\" class=\"wp-caption-text\"><span style=\"font-size: 10pt; font-family: arial,helvetica,sans-serif;\">The black cladding is actually a solar-air-heating system.<\/span><\/figcaption><\/figure>\n<p>The $2-million project was financed through a $10-million grant under the <em>American Recovery and Reinvestment Act<\/em> (<em>ARRA<\/em>) implemented by the U.S. Department of Housing and Urban Development (HUD), and is designed to meet the standards of HUD\u2019s Green Communities Program for Substantial Renovations. It is one of only 36 projects in the nation funded under the grant program, requiring commitment to a \u201ctransformative change\u201d in the approach to energy use.<\/p>\n<p>The project is on track for a 50 percent reduction in energy use at the property, as well onsite renewable energy generation exceeding 10 percent of the projected post-retrofit energy needs. The solar air-heating system custom-designed for LBJ Apartments will produce approximately 300 million BTUs of solar heating during each heating season, cutting annual natural gas consumption by more than 100,000 kWh\u2014over $5000 in savings\u2014while providing an annual 18-tonne reduction in carbon dioxide (CO<sub>2<\/sub>) emissions. In addition to being maintenance-free, unglazed TSACs are recognized for their air filtration ability showing a 50 percent reduction in particulate matter entering the HVAC system resulting from the static buildup of dirt particles around the perforations that are cleaned naturally by rainfall.<\/p>\n<p><em>Brian Wilkinson founded Matrix Energy in a Montr\u00e9al, Qu\u00e9bec-based company specializing in solar air-heating solutions in 1985. A graduate of Concordia University, he is a past-president and chair of the Canadian Solar Industries Association (CSIA) and member of Natural Resources Canada\u2019s (NRCan\u2019s) Solar Thermal Advisory Committee. Wilkinson can be contacted by e-mail at <a href=\"mailto:bwilkinson@matrixairheating.com\">bwilkinson@matrixairheating.com<\/a>.<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>An unglazed, transpired solar air-heating collection (TSAC) system has greatly improved the energy efficiency of a Cambridge, Massachusetts senior housing neighborhood. The Lyndon B. Johnson (LBJ) Apartments benefited from the technology, which integrated aesthetically, seamlessly, and cost-effectively within its architecture.<\/p>\n","protected":false},"author":6,"featured_media":9251,"comment_status":"open","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[4,179,449,197,338,466,468],"tags":[1109,3064,568,1615],"class_list":["post-9249","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-form-and-function","category-masterformat","category-uniformat","category-23-00-00-heating-ventilating-and-air-conditioning-hvac","category-23-50-00-central-heating-equipment","category-d30heating-ventilation-and-air-conditioning","category-d50electrical","tag-air-heating","tag-massachusetts","tag-solar","tag-tsac","entry"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Solar air-heating for senior housing retrofit - The Construction Specifier<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Solar air-heating for senior housing retrofit - The Construction Specifier\" \/>\n<meta property=\"og:description\" content=\"An unglazed, transpired solar air-heating collection (TSAC) system has greatly improved the energy efficiency of a Cambridge, Massachusetts senior housing neighborhood. The Lyndon B. Johnson (LBJ) Apartments benefited from the technology, which integrated aesthetically, seamlessly, and cost-effectively within its architecture.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/\" \/>\n<meta property=\"og:site_name\" content=\"The Construction Specifier\" \/>\n<meta property=\"article:published_time\" content=\"2015-05-25T20:42:48+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-01-27T20:46:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"765\" \/>\n\t<meta property=\"og:image:height\" content=\"1024\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Erik Missio\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Erik Missio\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"4 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/\"},\"author\":{\"name\":\"Erik Missio\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\"},\"headline\":\"Solar air-heating for senior housing retrofit\",\"datePublished\":\"2015-05-25T20:42:48+00:00\",\"dateModified\":\"2017-01-27T20:46:40+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/\"},\"wordCount\":745,\"commentCount\":1,\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/05\\\/IMG_2766.jpg\",\"keywords\":[\"Air-heating\",\"Massachusetts\",\"solar\",\"TSAC\"],\"articleSection\":[\"Form+Function\",\"MasterFormat\",\"UniFormat\",\"23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)\",\"23 50 00 Central Heating Equipment\",\"D30\u2212Heating, Ventilation, and Air-conditioning\",\"D50?Electrical\"],\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"CommentAction\",\"name\":\"Comment\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/#respond\"]}]},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/\",\"name\":\"Solar air-heating for senior housing retrofit - The Construction Specifier\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/05\\\/IMG_2766.jpg\",\"datePublished\":\"2015-05-25T20:42:48+00:00\",\"dateModified\":\"2017-01-27T20:46:40+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/#primaryimage\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/05\\\/IMG_2766.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2015\\\/05\\\/IMG_2766.jpg\",\"width\":765,\"height\":1024,\"caption\":\"This photo shows the solar air-heating system cavity framing in the Lyndon B. Johnson (LBJ) Apartments in Cambridge, Massachusetts. Photos courtesy Cambridge Housing Authority (CHA)\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/solar-air-heating-for-senior-housing-retrofit\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Solar air-heating for senior housing retrofit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#website\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"name\":\"The Construction Specifier\",\"description\":\"Solutions for the Construction Industry\",\"publisher\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.constructionspecifier.com\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#organization\",\"name\":\"The Construction Specifier\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"contentUrl\":\"https:\\\/\\\/www.constructionspecifier.com\\\/wp-content\\\/uploads\\\/2017\\\/09\\\/CS_Logo_BW_LR.jpg\",\"width\":288,\"height\":70,\"caption\":\"The Construction Specifier\"},\"image\":{\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/www.constructionspecifier.com\\\/#\\\/schema\\\/person\\\/8fefc680f3405e56509c50d8af04d43b\",\"name\":\"Erik Missio\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g\",\"caption\":\"Erik Missio\"},\"sameAs\":[\"http:\\\/\\\/www.constructionspecifier.com\"],\"url\":\"https:\\\/\\\/www.constructionspecifier.com\\\/author\\\/erik-missio\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Solar air-heating for senior housing retrofit - The Construction Specifier","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/","og_locale":"en_US","og_type":"article","og_title":"Solar air-heating for senior housing retrofit - The Construction Specifier","og_description":"An unglazed, transpired solar air-heating collection (TSAC) system has greatly improved the energy efficiency of a Cambridge, Massachusetts senior housing neighborhood. The Lyndon B. Johnson (LBJ) Apartments benefited from the technology, which integrated aesthetically, seamlessly, and cost-effectively within its architecture.","og_url":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/","og_site_name":"The Construction Specifier","article_published_time":"2015-05-25T20:42:48+00:00","article_modified_time":"2017-01-27T20:46:40+00:00","og_image":[{"width":765,"height":1024,"url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766.jpg","type":"image\/jpeg"}],"author":"Erik Missio","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Erik Missio","Est. reading time":"4 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/#article","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/"},"author":{"name":"Erik Missio","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b"},"headline":"Solar air-heating for senior housing retrofit","datePublished":"2015-05-25T20:42:48+00:00","dateModified":"2017-01-27T20:46:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/"},"wordCount":745,"commentCount":1,"publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766.jpg","keywords":["Air-heating","Massachusetts","solar","TSAC"],"articleSection":["Form+Function","MasterFormat","UniFormat","23 00 00 Heating, Ventilating, and Air Conditioning (HVAC)","23 50 00 Central Heating Equipment","D30\u2212Heating, Ventilation, and Air-conditioning","D50?Electrical"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/","url":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/","name":"Solar air-heating for senior housing retrofit - The Construction Specifier","isPartOf":{"@id":"https:\/\/www.constructionspecifier.com\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/#primaryimage"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/#primaryimage"},"thumbnailUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766.jpg","datePublished":"2015-05-25T20:42:48+00:00","dateModified":"2017-01-27T20:46:40+00:00","breadcrumb":{"@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/#primaryimage","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2015\/05\/IMG_2766.jpg","width":765,"height":1024,"caption":"This photo shows the solar air-heating system cavity framing in the Lyndon B. Johnson (LBJ) Apartments in Cambridge, Massachusetts. Photos courtesy Cambridge Housing Authority (CHA)"},{"@type":"BreadcrumbList","@id":"https:\/\/www.constructionspecifier.com\/solar-air-heating-for-senior-housing-retrofit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.constructionspecifier.com\/"},{"@type":"ListItem","position":2,"name":"Solar air-heating for senior housing retrofit"}]},{"@type":"WebSite","@id":"https:\/\/www.constructionspecifier.com\/#website","url":"https:\/\/www.constructionspecifier.com\/","name":"The Construction Specifier","description":"Solutions for the Construction Industry","publisher":{"@id":"https:\/\/www.constructionspecifier.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.constructionspecifier.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.constructionspecifier.com\/#organization","name":"The Construction Specifier","url":"https:\/\/www.constructionspecifier.com\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/","url":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","contentUrl":"https:\/\/www.constructionspecifier.com\/wp-content\/uploads\/2017\/09\/CS_Logo_BW_LR.jpg","width":288,"height":70,"caption":"The Construction Specifier"},"image":{"@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/www.constructionspecifier.com\/#\/schema\/person\/8fefc680f3405e56509c50d8af04d43b","name":"Erik Missio","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/9bcb6d499da6ef3612a8460a592f43517f3e700351d9aae442889327fe0effa1?s=96&d=mm&r=g","caption":"Erik Missio"},"sameAs":["http:\/\/www.constructionspecifier.com"],"url":"https:\/\/www.constructionspecifier.com\/author\/erik-missio\/"}]}},"views":5223,"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/9249","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/comments?post=9249"}],"version-history":[{"count":8,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/9249\/revisions"}],"predecessor-version":[{"id":25854,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/posts\/9249\/revisions\/25854"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media\/9251"}],"wp:attachment":[{"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/media?parent=9249"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/categories?post=9249"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.constructionspecifier.com\/wp-json-v2\/wp\/v2\/tags?post=9249"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}