|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
 |
DISCUSSIONS OF THE WEEK |
|
STOREFRONT GLASS FRAME ENERGY AND BR-RATED QUESTION |
I’m looking for a storefront glazing system which can hold BR-1 glass in one slot (center), and then a regular insulated glass unit in the second slot (interior side), as opposed to the usual one glazing slot. Is this only custom, or does a manufacturer make one “off the shelf?” I haven’t found U-values for BR-1 glass. Any suggestions or general knowledge for about what U-value to expect?
|
JOIN THE DISCUSSION! |
|
FM-200 SPECIFYING |
Does anyone have any advice on specifying room pressurization requirements for IT rooms which will be receiving FM-200 clean agent fire suppression systems? We need to ensure the space meets pressurization requirements (10 minutes minimum). Especially for multi-prime projects, we are having trouble with final testing not meeting requirements and a lot of finger-pointing to responsibility for leakage sealing. Any help for future specs would be appreciated.
|
JOIN THE DISCUSSION! |
|
MORE FROM THE CONSTRUCTION SPECIFIER |
|
|
|
UPCOMING DEMO-CASTS |
|
|
POUR’D Coffee on Tap: A Totally New Approach to Meet Changing Beverage Needs
|
Marco Beverage |
|
|
|
|
|
Alternative Corridor Systems: Longer, Stronger Grid Spans in Less Time
|
CertainTeed |
|
|
|
|
|